|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)(DSR 2023 SH 15.2.1) |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge |
| 3 | Earth work in surface exvation not exceeding 30 cm In depth but Exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excevated earth upto 50 m and lift upto 1.5, as directed by Engineer in charge (DSR 2023 SH 2.1.1) |
| 4 | Supplying and stacking at site 53 mm to 22.4 mm size stone aggregate |
| 5 | Supplying and stacking at site Stone dust |
| 6 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. |
| 7 | 1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size including Recycled Aggregate (RA) (DSR 2023 SH 4.1.10A) |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR 2023 SH-6.1.2 ) |
| 9 | 12 mm cement plaster of mix : 1:4(1 cement: 4 fine sand)(DSR 2023 SH-13.1.1 ) |
| 10 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. |
| 11 | 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 2023 S H 4.1.3 ) |
| 12 | Providing and fixing glass strips in joints of terrazzo/ cement concrete floors. (DSR 2023 SH 11.13) |
| 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.(DSR 2023 SH 15.60) |
| 14 | CARRIAGE OF MATERIALS By manual labour including loading, unloading and stacking for lead less than 01-50 mtr |
| 15 | Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) |
| 16 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) |
| 17 | Supply & mixing 3.5 kg and or as specified by the manufacture, hardener in tremix concrete per sqm |
| 18 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |
| 19 | Sub Total |
| 20 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 21 | Grand Total Please Enable Macros to View BoQ information |