|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required sloe and compecting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 but extra for carted earth quanitity lead upto 3.00 km. including first km. cartage and loading and unloading of earth. |
| 2 | Dismentling of old BOE Soling Stacking of dismental ed bricks at site required for Proper Completion of the work as direct by e/I (Non Schedule item SR No-1) |
| 3 | Brick soling with straight over burnt bricks laid flat and dry (labour only) including preparation of sub-grade to prescribed camber, filling joints with local earth, spreading blinding coat 1 cm. (3/8\\") depth of local earth over the entire surface and including labour and T&P etc. but excluding of all material required for proper completion of the work. U.P.P.W.D SI.NO 786 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) |
| 6 | Cement concrete wit 4cm gauge approved brick,ballast ,approved coarse sand and cement in the proporation of 1:6:12including supply of all materials, labour and T&P etc.required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) S.I.No.273 |
| 7 | First Class Brick work in 1:4 cement and coarse sand mortar in foundation complete including supply of all materials, labour and T&P etc.required for proper completion of the work.(rate as per PWD bly circle. Sor dt. 15-04-2025) SI.No.305 |
| 8 | Plastering with cement mortar (1:5)cement and coarse sand on brick work including supply of all materials, labour and T&P etc.required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) S.I.No-584(i) |
| 9 | Cement concrete wit 2cm gauge approved stone,ballast ,approved coarse sand and cement in the proporation of 1:2:4 including supply of all materials, labour and T&P etc.required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) S.I.No.279(i) |
| 10 | Supply and laying of factory made 80 mm thick tiles of precost compressed C.C. passing minimum 30 mpa compassive strength I.S.I. marked including levelling and dressing of surface to required level and slope filling joints with local sand including cost of all materials labour and T&P etc. but excluding cost of local and required for porper completion of the work as per directed by E/L As per SI no. ch. 20 road work new Item I. |
| 11 | Supply and fixing of Informatory Sign Board at Starting Point and End point of the road. Please Enable Macros to View BoQ information |