| 1 | Earth work in Cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required lavels and slops and also including 1.5 m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge etc. all complete. (4-Chapter Si.No.3) |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by E/IC with in a distance of 60meters (200 feets). (17-Chapter Si.No.5) |
| 3 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) |
| 4 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) |
| 5 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 Cement : 4 Coarse sand.(Chapter No.13 Si.No.1) |
| 7 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-15 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter Sr.No.6 Si.No..4.1.3) |
| 8 | Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement: 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade: (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) Red sand stone - exposed face fine dressed with rough backing. 30 mm thick (Chapter No.18 Si.No.7) |
| 9 | Supply and Fixing of Precast Reinforced R.C.C benches (PFRC) ornamental benches with 02 year warranty etc all complete. (None Scheduled) |
| 10 | Supply and fixing Bansi Paharpur (Red/White) bharra sand stone fully moulded, Engraved, carved with polishing and dressing including clamp and fashners of pillar set with all complete work etc. (None Schedule) |
| 11 | Providlng and laying Polished Granite Jet Black stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.{Chapter No.14 Si.No.27} |
| 12 | Supply and Fixing Stainless steel (Grade 304) ralling made of Hollow tubes, channels, plates etc. Including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary steel nuts and bolts complete. I/C fixing the ralling with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts fasteners etc.). (Chapter No.10 SI. No. 14 New) |
| 13 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |
| 14 | Sub Total (A) |
| 15 | Add / Deduction For Estimate Figure Amount Match |
| 16 | Grand Total Please Enable Macros to View BoQ information |