| 1 | SUPPLY OFFitting Block Forged - Alloy Steel FOR AG & UG PIPING (LOT-4) FOR MSB, PFCC, GDS, FF FOR NREP PROJECT incuding TPI charges as specified in Material Requisition. |
| 2 | ELB 90 DEG AS (H2 SER.), 3000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 3 | ELB 90 DEG AS (H2 SER.), 3000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 4 | ELB 90 DEG AS (H2 SER.), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 5 | ELB 90 DEG AS (H2 SER.), 9000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 6 | ELB 90 DEG AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 7 | ELB 90 DEG AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 8 | ELB 45 DEG AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 9 | FCPL AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 10 | TEE AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 11 | TEE AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 12 | HCPL AS (H2 SER.), 3000,0, B16.11, SW END, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 13 | HCPL AS (IBR), 6000,0, B16.11, SW END, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 14 | HCPL AS (IBR), 6000,0, B16.11, SW END, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 15 | NIPPLE AS, B36.10M, MNPT x BW END,SCH 160, SEAMLESS, ONE END BW, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P5, MAT. DELIV. COND. SCH 160, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F5 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 16 | NIPPLE AS, B36.10M, MNPT x BW END,SCH 160, SEAMLESS, ONE END BW, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P9, MAT. DELIV. COND. SCH 160, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F9 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 17 | NIPPLE AS (H2 SER.), B36.10M, MNPT x PE,SCH XS, SEAMLESS, ONE END PLAIN, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P11, MAT. DELIV. COND. SCH XS, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F11 CL.2 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 18 | NIPPLE AS (IBR), B36.10M, MNPT x PE,SCH 160, SEAMLESS, ONE END PLAIN, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P11, MAT. DELIV. COND. SCH 160, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F11 CL.2 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 19 | SUPPLY OF Fitting Block Forged - Alloy Steel FOR AG & UG PIPING (LOT-4) FOR MSB, PFCC, GDS, FF FOR NREP PROJECT incuding TPI charges as specified in Material Requisition. |
| 20 | ELB 90 DEG AS (H2 SER.), 3000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 21 | ELB 90 DEG AS (H2 SER.), 3000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 22 | ELB 90 DEG AS (H2 SER.), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 23 | ELB 90 DEG AS (H2 SER.), 9000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 24 | ELB 90 DEG AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 25 | ELB 90 DEG AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 26 | ELB 45 DEG AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 27 | FCPL AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 28 | TEE AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 29 | TEE AS (IBR), 6000,0, B16.11, SW ENDS, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 30 | HCPL AS (H2 SER.), 3000,0, B16.11, SW END, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 31 | HCPL AS (IBR), 6000,0, B16.11, SW END, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 32 | HCPL AS (IBR), 6000,0, B16.11, SW END, FORGED, NORMALIZED & TEMPERED, A182 Gr.F11 CL.2, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. |
| 33 | NIPPLE AS, B36.10M, MNPT x BW END,SCH 160, SEAMLESS, ONE END BW, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P5, MAT. DELIV. COND. SCH 160, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F5 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 34 | NIPPLE AS, B36.10M, MNPT x BW END,SCH 160, SEAMLESS, ONE END BW, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P9, MAT. DELIV. COND. SCH 160, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F9 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 35 | NIPPLE AS (H2 SER.), B36.10M, MNPT x PE,SCH XS, SEAMLESS, ONE END PLAIN, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P11, MAT. DELIV. COND. SCH XS, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F11 CL.2 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 |
| 36 | NIPPLE AS (IBR), B36.10M, MNPT x PE,SCH 160, SEAMLESS, ONE END PLAIN, OTHER END THRD., LENGTH = 150 mm, NIPPLE A335 Gr.P11, MAT. DELIV. COND. SCH 160, SUPP. REQUIREMENTS, FOR SIZE <=1 1/2\\" , TAPER EXTERNAL THREADS, AS PER ASME/ANSI B1.20.1, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0004, ALTERNATIVE FORGED AS, A182 Gr.F11 CL.2 IS ACCEPTABLE AND, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005, IBR CERTIFICATE IN FORM IIIC REQUIRED. Please Enable Macros to View BoQ information |