|
| 1 | Sub-Head (A) at MDCSCComprehensive Maintenance i/c routine/ preventive, breakdown maintenance & repair/ replacement of components of VRF Systems for Squash Court 28 HP and Table Tennis Court 30 HP (Total Outdoor 58 HP) as required. |
| 2 | Servicing, testing & commissioning of 58 HP VRV unit. microprocessor panel, chemical cleaning & inspection of cooling coil for indoor unit, air filters will be inspected and clean or replace, changing of dryer filters, compressor will be checked for the proper functioning, any defect in the electricals and control wiring will be attended, refrigerant will be top Up in the System as and when necessary, the condenser fan motor will be checked and clean oiling and greasing, etc (If any defective parts like Fan motor, PCB, Magnetic Switch, Transformer, Air filters, Other Electrical parts of AC unit, Compressor is found the same will be Charge Extra) |
| 3 | Supply & Replacement of Faulty Motor of Hi-Wall at Table Tennis Area Complete as required. |
| 4 | Supply & Replacement of Faulty Main PCB of Hi-Wall at Table Tennis Area Complete as required |
| 5 | Supply & Replacement of Faulty Coil Sensor of Hi-Wall at Table Tennis Area Complete as required |
| 6 | Supply & Replacement of Faulty Air Filter Sensor of Hi-Wall at Table Tennis Area Complete as required |
| 7 | Supply & Replacement of Faulty Section Filter Sensor of Hi-Wall at Table Tennis Area Complete as required |
| 8 | Dismantling and Re-Fixing of Copper pipe and testing for EV KIT in Squash Court Complete as required |
| 9 | Supply, Installation, testing and commissioning of EV Kit for Squash Court Complete as required |
| 10 | Supply and charging of Refrigerant R410-A in VRV Units for 58 HP Complete as required |
| 11 | Sub-Head (B) at RSCComprehensive Maintenance i/c routine/ preventive, breakdown maintenance & repair/ replacement of components of VRF Systems for Squash Court 28 HP and Table Tennis Court 30 HP (Total Outdoor 58 HP) as required. |
| 12 | Sub-Head (C) at RSKPComprehensive Maintenance i/c routine/ preventive, breakdown maintenance & repair/ replacement of components of VRF Systems for Squash Court 28 HP and Table Tennis Court 30 HP (Total Outdoor 58 HP) as required. |
| 13 | Sub-Head (D) at PDKPComprehensive Maintenance i/c routine/ preventive, breakdown maintenance & repair/ replacement of following components of VRF Systems as required: a) Squash Courts-1 - 14 HPb) Squash Courts-2 - 14 HPc) Table Tennis Court - 30 HP d) Badminton Court - 64 HPe) Badminton Court (for treated fresh air unit) - 14 HPTotal - 136 HP Please Enable Macros to View BoQ information |