| 1 | Supply only integral water proofing compound complete all as specified and as directed. |
| 2 | M& L for second class hard wood in scantlings, exc 40 sqcm in area clean sawn for un framed work complete all as specified and directed. |
| 3 | Fixing only second class hard wood in scantlings, exc 40 sqcm in area clean sawn for un framed work complete all as specified and directed. |
| 4 | S & F of 2nd class Hard wood plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails sectional area exc 13 but not exc. 25 sqcm complete all as specified and directed. |
| 5 | S & F of 2nd class Hard wood clean sawn battens at 30 cm centre, sectional area exc 5 and n.exc 15 Sqcm complete all as specified and directed. |
| 6 | Fixing only 2nd class Hard wood clean sawn battens at 30 cm centre, sectional area exc 5 and n.exc 15 Sqcm complete all as specified and directed. |
| 7 | S&F 2nd Class hardwood boarding, clean sawn, plain thickness 20 to 25 mm thick and rebated on the thick edge to give 20mm lap and fixed complete all as specified and directed. |
| 8 | Fixing only 2nd Class hardwood boarding, clean sawn, plain thickness 20 to 25 mm thick and rebated on the thick edge to give 20mm lap and fixed complete all as specified and directed. |
| 9 | S&F 0.63 mm thick Galvanised, corrugated mild steel sheeting with two corrugations side lap, fixed with coach screws and washers, in roofs, walls etc. with grade of zinc coating 120 Gm/Sqm fixed with fixed with L-type or J-type or cranked hook bolts complete all as specified and directed. |
| 10 | S&F 0.63 mm Plain, galvanised, mild steel sheeting, in ridges, hips valley gutters, drip and straight flashing (length and girth as fixed) with grade of zinc coating 120 Gm/Sqm complete all as specified and directed. |
| 11 | M&L for providing Roof tiles, Mangalore pattern, interlocking at side joints, laid dry in patches where required complete all as specified and directed. |
| 12 | Labour only for providing Roof tiles, Mangalore pattern, interlocking at side joints, laid dry in patches where required complete all as specified and directed. |
| 13 | M&L for providing ridge or hip tiles to suit Mangalore pattern of Roof tiles, bedded and jointed in cement mortar 1:6 complete all as specified and directed. |
| 14 | Labour only for providing ridge or hip tiles to suit Mangalore pattern of Roof tiles, bedded and jointed with and including cement mortar 1:6 complete all as specified and directed. |
| 15 | M & L for 15 mm thick rendering in cement mortar 1:4 on block walling surface and finished the surface even and smooth without using extra cement complete all as specified and directed. |
| 16 | Taking down cement plaster on brick or stone walls, etc., including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. |
| 17 | M & L for painting the new wall surface complete all as specified and directed as follows :-(a) Surface Preperation- Preparation of newly plastered or previously untreated surfaces of walls(b) Putty application- NIL(c) Priming surface- NIL(d) Painting- Applying two coats of cement base paint. |
| 18 | M & L for painting the new wood surface complete all as specified and directed as follows :-(a) Surface preperation- Preperation of new wooden surfaces of any description, not otherwise described over 10 cm width or girth(b) Priming surface- Applying one coat of pink primer(c) Painting- Applying two coats of synthetic enamel paint. |
| 19 | M & L for painting the old wooden surface complete all as specified and directed as follows :-(a) Surface preperation- Preperation of old wooden surfaces of any description, not otherwise described over 10 cm width or girth(b) Priming surface- NIL(c) Painting- Applying one coat of synthetic enamel paint. |
| 20 | M & L for two coats of cresote to wooden surface complete all as specified and directed as follows :-(a) Surface preperation- Preperation of surfaces of wood and wood based materials, new or old of any description and girth, not otherwise described for.(b) Priming surface- NIL(c) Painting- Applying two coats of creosote. |
| 21 | Taking up or down 15 mm bore steel tubing and connections, cleaning & re-fixing the same in new or old position in walls / ceiling or in floors etc. complete all as specified and as directed. |
| 22 | Taking up or down 20 mm bore steel tubing and connections, cleaning & re-fixing the same in new or old position in walls / ceiling or in floors etc. complete all as specified and as directed. |
| 23 | S&F 15 mm bore galvanised steel water tubing medium grade and including necessary GI fitting (such as bends, elbows, tees etc. and fixed to wall / ceiling or laid in / on floor complete all as specified and directed. |
| 24 | S&F 20 mm bore galvanised steel water tubing medium grade and including necessary GI fitting (such as bends, elbows, tees etc. and fixed to wall / ceiling or laid in / on floor complete all as specified and directed. |
| 25 | Fixing only 15 mm bore galvanised steel water tubing medium grade and including necessary GI fitting (such as bends, elbows, tees etc. and fixed to wall / ceiling or laid in / on floor and including taking down of existing pipe complete all as specified and directed. |
| 26 | Fixing only 20 mm bore galvanised steel water tubing medium grade and including necessary GI fitting (such as bends, elbows, tees etc. and fixed to wall / ceiling or laid in / on floor and including taking down of existing pipe complete all as specified and directed. |
| 27 | Disconnecting existing tanks, setting aside (or lowering if required) for repairs, cleaning, etc. And hoisting if required reconnecting and re-fixing in position. (Cleaning repairing, etc. Measured Separately) of capacity exc 500 ltrs but n.exc 1000 litres complete all as specified and directed. |
| 28 | S&F in repairs rotational moulded polyethylene water storage tanks of 500 Litres capacity, triple layered (cylindrical vertical with closed top) hoisted and fixed in position and including 20 mm dia nipple suitable for HDPE water tank (minimum weight 45 gm), including 20 mm bore ball valves (minimum weight 210 gm) high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball screwed for iron pipe and fixed to 20 mm bore pipe & locking with GI wire (to prevent monkey menace) to tank complete all as specified and directed. |
| 29 | S&F in repairs rotational moulded polyethylene water storage tanks of 1000 Litres capacity, triple layered (cylindrical vertical with closed top) hoisted and fixed in position and including 20 mm dia nipple suitable for HDPE water tank (minimum weight 45 gm), 20 mm bore ball valves (minimum weight 210 gm) high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball screwed for iron pipe and fixed to 20 mm bore pipe & locking with GI wire (to prevent monkey menace) to tank complete all as specified and directed. |
| 30 | Dismantling Unframed timber scantlings 40 Sqcm and over in section and in any position in framed work complete all as specified and directed. |
| 31 | Dismantling of timber fillet, rails, post, rafters, purlins, etc. under 40 Sqcm in section Unframed work complete all as specified and directed. |
| 32 | Dismantling boarding, any description fixed in any position with nails complete all as specified and directed. |
| 33 | Dismantling Battens for tiles, shingles etc, of any size including tilting fillets spacing exceeding 15cm complete all as specified and directed. |
| 34 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as specified and directed. |
| 35 | Dismantling of single layer manglore pattern or similar tiles in roofing complete all as specified and directed. Please Enable Macros to View BoQ information |
| 36 | Dismantling of single layer manglore pattern or similar tiles in roofing complete all as specified and directed. Please Enable Macros to View BoQ information |