|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas,lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 12.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement: 6 coarse sand) |
| 5 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase |
| 6 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete |
| 7 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 8 | 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand) |
| 9 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) Make Asian paint Ultima or equivalent |
| 10 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface litre/10 sqm) Make Asian paint Ultima or equivalent |
| 11 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1 cement : 4 fine sand) |
| 12 | Flush pointing on vertical wall with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat bricks: With modular brick |
| 13 | Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineerin- Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) |
| 14 | Refixing and disconnecting damaged overhead/terrace PVC water storage tank of any size ( 1 set for 4 Nos tank on roof ) from water supply line and removing from the terrace including same shifting at roof level after the completeion of water proof as per direction of Engineer-in-charge. |
| 15 | Demolishing cement concrete manually/ by mechanical means including disposal of material within CSIO lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) |
| 16 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within CSIO lead as per direction of Engineer-in-charge. In cement mortar |
| 17 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within CSIO. |
| 18 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 19 | Providing and fixing 100 mm sand cast Iron grating for gully trap. |
| 20 | Providing and fixing soil, waste and vent pipes :100 mm dia Centrifugally cast (spun) iron socket & spigot (S&S) pipe as per IS: 3989 Make :- NIF/RIF/BIC or equivalent |
| 21 | Providing and fixing plain bend of required degree.100 mm dia Sand cast iron S&S as per IS : 3989 Make :- NIF/RIF/BIC or equivalent |
| 22 | Providing and fixing heel rest sanitary bend 100 mm dia Sand cast iron S&S as per IS - 3989 Make :- NIF/RIF/BIC or equivalent |
| 23 | Providing and fixing single equal plain junction of required degree :100x100x100 mm Sand cast iron S&S as per IS - 3989 Make :- NIF/RIF/BIC or equivalent |
| 24 | Providing and fixing collar :100 mm Sand cast iron S&S as per IS - 3989 Make :- NIF/RIF/BIC or equivalent |
| 25 | Providing lead caulked joints to sand cast iron/centrifugally cast (spun) iron pipes and fittings of diameter : 100 mm |
| 26 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with three layer with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes with inlet & outlet fittings. Make Dipast/Plasto/Sintex |
| 27 | Providing and fixing G.I. Union, TEE, elbow & any other simliar fittings in G.I. pipe including cutting and threading the pipe and making long screws etc. complete :15 mm nominal bore Make UNIK or Equivalent |
| 28 | Providing and fixing G.I. Union, TEE, elbow & any other simliar fittings in G.I. pipe including cutting and threadingthe pipe and making long screws etc. complete : 20 mm nominal bore Make UNIK or Equivalent |
| 29 | Providing and fixing PTMT Ball cock of approved quality, colour and make complete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball. 20 mm nominal bore, 120 mm long, weighing not less than 198 gms. Make :- Prayag or equivalent |
| 30 | Cutting holes up to 30x30 cm in walls including making good the same: With common burnt clay F.P.S. (non modular) bricks |
| 31 | Cutting holes up to 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof. |
| 32 | Regrading terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded), all complete as per direction of Engineer-in- Charge. |
| 33 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. |
| 34 | Flush pointing on roof with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska : With F.P.S. brick tiles |
| 35 | Waterproofing :- Premix Compound Components A and B using an electric double-paddle mixer for 2–3 minutes at low speed. Apply the first coat of Compound at a rate of 0.80–0.90 kg/m² without dilution, using a lamb’s wool or cloth roller. While the coating is still wet, roll and embed a 225 gsm Fiberglass Chopped Strand Mat, ensuring full bonding without air bubbles or wrinkles. Allow the first coat to dry for 3–4 hours. Apply the second coat at a 90° angle to the first. Overlap the chopped strand mat by at least 5 cm at the joints, ensuring the overlaps are sufficiently wet to achieve proper bonding. Once the surface is dry enough to walk on, apply the second coat at 0.80 kg/m². Apply additional coats as needed to achieve a total dry film thickness of 900–1000 microns, with a total system material consumption of 1.60 kg/m² over 2–3 undiluted coats. Note – Coating should be terminated below the drip mould on the vertical surface. The material has followed technical properties: Attains a Tensile Strength ≥ 18 N/mm2 as per ASTM D 2370; Crack bridging ability, Tear Strength ≥ 160 N/mm as per ASTM D 624, Dynamic Crack bridging as per EN 13251:2016 - No Cracks after 20000 sinusoidal cycles, Dynamic Crack bridging as per ASTM C 1305-2016 - Pass, No Crack, Pass Low Temperature Flexibility (-20 after 1000 Hrs. UV as per ASTM D 1970-2021, Shore A as per ASTM D2240 – 85 , Peel Adhesion to Concrete under wet Condition -24 Hrs. – N As per ASTM C 794 – 11.4 , Abrasion resistance (CS 17 Wheel -1000 Cycle, 1.0 Kg) as per ASTM D 4060 - 7 mg , Depth of Water Permeability @ 10 Bar as per EN 12390-8-2019 – Nil Water Migratlon Resistance as per ASTM D 7281,-2007 - No Leakage, Pass Spread of flame Class makes BASF, Pidilite, Fosroc, MAPEI, CIPY . The Operation shall be carried out after scrapping and properly cleaning the surface to remove loose particle with wire brushes complete in all respect as per direction of engineer in charge.All the agencies should be having valid trained/authorized applicator certificate certified by the agency i.e. BASF, Pidilite wonderproof , Fosroc, MAPEI, CIPY please read general instruction also an Gurantee 10 years to be furnished and MOU with manufacture to be signed . |
| 36 | Carrying out petty jobs of plumbing works with all necessary tools like pipe wrench, drilling machine drill bits, thread ,gitty,safety belts ,ladder, thread die ,hexa blade ,all plunmbing tools ,old cycle tubes etc for petty works at different locations which can not be measured as per direction of engineer -in-charge. |
| 37 | Carrying out petty job of massonary work including with all type of repair with concrete and mortar complete with nessary tools,sand , aggregate ,cement etc for the work which can not be measured. |
| 38 | Finishing walls/Roof with Damp Proof Paint with additives of required shade (Two coats ). including priming coat of one coat of primer applied Make :- Asian Damp Proof paint or Equivalent |
| 39 | Providing and placing on terrace water storage tank cover upto 500 ltr with suitable locking arrangement. Please Enable Macros to View BoQ information |