| 1 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 3 | Laying of 11 KV XLPE UG cable of various sizes after providing HDD Duct along / across roads and other public paths by mechanical means including supply of HDPE pipe 110mm dia, making exit/ entry pits of suitable sizes |
| 4 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 5 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 6 | Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 7 | Laying HT XLPE UG cable of sizes upto and including 3x185 sq mm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 8 | Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 9 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges. |
| 10 | Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the installation of Data Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, communicable FPIs, CTs, PTs & relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and control cables, providing metered LT supply from nearest LT pole, providing earth leads, cable mounting & terminations, giving connections after ascertaing proper phase sequence, providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cost of conveyance. RMUs with two nos load break switches & one VCB |
| 11 | Approved Data: Lifting / Loading 1No CCC/CCV unit of RMU from its place of storage / existing location vehicle suitable location for a distance upto 50m |
| 12 | Approved Data:Erection of CCC/CCV modules of RMU to the existing platform of foundation bolts , fixing all connections , redoing earthing connection complete etc including testing and commissioning |
| 13 | Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the installation of Data Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, communicable FPIs, CTs, PTs & relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and control cables, providing metered LT supply from nearest LT pole, providing earth leads, cable mounting & terminations, giving connections after ascertaing proper phase sequence, providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cost of conveyance. RMU Bus Couplers / Add-On units with Load Break switch(s) & Earth switch |
| 14 | Coupling of Busbars Please Enable Macros to View BoQ information |