| 1 | 2.8.1 : Earth work inexcavation by mechanicalmeans (Hydraulic excavator)/manual means in foundationtrenches or drains (notexceeding 1.5 m in width or10 sqm on plan), includingdressing of sides andramming of bottoms, lift upto 1.5 m, including gettingout the excavated soil anddisposal of surplus excavatedsoil as directed, within a leadof 50 m.All kinds of soil (cost index(c) : 1.4766included in Rate) |
| 2 | 4.1.6 : Providing and layingin position cement concreteof specified grade excludingthe cost of centering andshuttering - All work up toplinth level:1:3:6 ( 1 cement :3 coarse sand : 6 gradedstone aggregate 40 mmnominal size) (cost index©: 1.4766 included in Rate) |
| 3 | 5.9.1 : Centering andshuttering including strutting,etc. and removal of formfor:Foundations, footings,bases of columns, etc formass concrete (cost index(c): 1.4766 included in Rate) |
| 4 | 5.1.2 : Providing and layingin position specified grade ofreinforced cement concrete,excluding the cost ofcentering, shuttering,finishing and reinforcement -All work up to plinthlevel:1:1:5:3 (1 cement 1.5coarse sand :3 graded stoneaggregate 20 mm nominalsize (cost index(c) : 1.4766included in Rate) |
| 5 | Installation of 7 m OctagonalYard Light Pole (Materialsupplied by KSEB) (costindex(e) : 1.3424 included inRate) |
| 6 | Supplying and fixing 5 ampsto 32 amps rating, 240/415volts, \\"C\\" curve, miniaturecircuit breaker suitable forinductive load of followingpoles in the existing MCBDB complete withconnections, testing andcommissioning etc. asrequired. Double pole (costindex(e) : 1.3424 included inRate) |
| 7 | 5.22.6 : Steel reinforcementfor R.C.C work includingstraightening, cutting,kg 114.92 48 5516.34 CONTRbending, placing in positionand binding all completeupto plinth levelThermo -Mechanically Treated bars ofgrade Fe-500D or more (costindex(c) : 1.4766 included inRate) |
| 8 | Uncoiling 4/2 core 2.5sqmmcontrol cable (armored orunarmored) from cabledrums and cutting to requiredlength and laying throughtrench/pipe/cable tray neatlyand carefully including forproviding loops wherevernecessary and cable markerat both ends of cable as perdirection of departmentalstaff at site. (cost index(e) :1.3424 included in Rate) |
| 9 | Laying of departmentallysupplied GI strip/Copperstrip of suitable sizeincluding cleaning and neatlybending of strips ,cutting,removing of metal/earth inthe yard and burying earthstrip to the required depth redoing the yard metalling asper the direction of thedepartmental officers. (costindex(e) : 1.3424 included inRate) |
| 10 | Welding one end of thebended GI strip of size50x6mm with the riser of thealready laid earth mat,welding 150mm in length,6mm thick on both sides &end of the strip & other endof the strip with yard structure at 2 points 50mmapart each welding pointshaving 50mm length and6mm thick on both sides &end of the strip including thecharges for connecting thestrip with structure usingbolted joints as per thedirections of the departmentofficers. Charges includeshire charges of DC arcwelding set, current charges,cost of low hydrogen contentDC arc weldingelectrodes(No.E7018) cost ofanti corrosive paint etc.complete. (cost index(e) :1.3424 included in Rate) |
| 11 | Welding charge for weldingon iron parts using arcwelding as per standards (cost index(e) : 1.3424included in Rate) |
| 12 | 50.18.7.3.2 Providing andfixing PVC pipes, fittingsincluding fixing the pipe withclamps at 1.00 m spacing.This includes jointing ofpipes & fittings with one stepPVC solvent cement andtesting of joints complete asper direction of Engineer-inCharge 25 mm dia 10Kgf/cm2- Internal work- Exposedon wall (cost index(c) :1.4766 included in Rate) |
| 13 | Supply, Conveyance,installation, testing andcommissioning of 100WLED Flood light outputgreater than 105lumen/W 4000-6000 K with IP 66protection LED Chip makeCree/Lumilled/Nichea withpower factor greater than0.95 at full load, internalsurge protection up to 8KV,and Aluminium pressuredie-cast Powder coatedhousing, acrylic covercomplete with THD less than10%, power factor greaterthan 0.98, RoHS compliant,duly wired up for use on 230V AC supply. Drivercompartment should beseperatly accessible formaintenance (LM 79&80certificates from NABLaccredited Third party lab tobe produced mentioning chipmanufacturer) Please Enable Macros to View BoQ information |