| 1 | Dismantling brick work tile,masonry or tile lining in cement. |
| 2 | Dismantling Reinforced cement concrete |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil. By Mechanical Means. Depth upto 3 m. |
| 4 | Preparing, watering and ramming surface for laying concrete. Head work. Horizontal. |
| 5 | Plain/Reinforced Cement Concrete in Open Foundationcomplete as per Drawing and Technical Specifications. PCCGrade M15. |
| 6 | BRIDGES - SUPER STRUCTURE & PROTECTIONWORK: Furnishing and Placing Reinforced/ Prestressedcement concrete in super-structure as per drawing and Technical Specification. RCC Grade M25. Using Batching Plant, Transit Mixer and Concrete Pump. For Solid slab super-structure-including centering and shuttering, Height up to 5m |
| 7 | Plain/Reinforced Cement Concrete in Open Foundationcomplete as per Drawing and Technical Specifications. RCCGrade M25 With Batching Plant, Transit Mixer and Concrete Pump. |
| 8 | Plain/Reinforced Cement Concrete in Open Foundationcomplete as per Drawing and Technical Specifications. RCCGrade M30 With Batching Plant, Transit Mixer and Concrete Pump |
| 9 | BRIDGES - SUPER STRUCTURE & PROTECTIONWORK: Furnishing and Placing Reinforced/ Prestressedcement concrete in super-structure as per drawing and Technical Specification. RCC/PSC Grade M40. Using Batching Plant, Transit Mixer and Concrete Pump For Solid slabsuper-structure-including centering and shuttering, Height up to 5m. |
| 10 | Compaction. Extra for laying earth/ fly ash as perspecification in 20 cm layers and dressing including cost ofwatering and rolling |
| 11 | Excavation in soil using hydraulic jcb and hydraulictrolley with disposal upto 450 mtr including cutting andloading in trolley, trimming bottom and side slopes inaccordance with requirements of lines, grades and crosssections and transporting to embankment location withinall lifts and lead. (Lead = 3 km Kutcha) |
| 12 | Painting on concrete surface: Providing and applying 2 coatsof water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil,grease, efflorescence and applying paint @ of 1 litre for2 sqm |
| 13 | BRIDGES - SUPER STRUCTURE & PROTECTIONWORK: Supplying, fitting and placing HYSD barreinforcement in super-structure complete as per drawing and technical specifications |
| 14 | Granular Sub-Base (Table 400-1)Construction ofgranular sub-base by providing material as pergrading-III ( Table 400-I of MORT&H5th revision), mixing in amechanical mix plant atOMC,spreading in uniform layers with motor grader onprepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401of MORT&H specification |
| 15 | 24.13 Wet Mix Macadam Providing, laying, spreadingand compacting graded stone aggregate to wet mixmacadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layerswith paver in sub- base / base course on well prepared surface and compacting with vibratoryroller to achieve the desired density complete as pertechnical clause 406 of MORT&H Secifications |
| 16 | 24.15 Prime Coat @ 0.85kg per sqm Providing andapplying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 ofMORT&H Secifications. |
| 17 | 24.16 Tack Coat @ 0.40kg per sqm (b) Providingandapplyingtackcoatwithpenetration grade bitumen VG-10 using bitumen pressure distributor at the rateof 0.40kgper sqm on the prepared bituminous surface/granular surfacetreatedwithprimecoatafterclea ning thesurface complete asper technical specification |
| 18 | 24.17 Bituminous Macadam 80mm to 100 mm thickness(Grading I) (a) Providing and laying bituminous macadam80mm to100mm thick with batch type hot mix plant usingcrushed aggregates of specified grading premixed with bituminous binder [email protected]%, laid over apreviously prepared surfacewith hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled to achieve the desired compaction complete as pertechnical clause 504 of MORT&H specification |
| 19 | 24.22 Bituminous Concrete 50mm to 65mm thickness(Grading I) Providingand laying bituminous concrete50mm to 65mm thick with batch type hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous [email protected]%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 ofMORT&H specifications |
| 20 | BRIDGES- FOUNDATIONS & SUB- STRUCTURE: Supplying,fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. |
| 21 | Filling expansion joints with special impervious hot pourBituminous 525 mm deep and 20 mm wide. |
| 22 | Drainage Sprouts complete as per drawing no. SD/205 andtechnical specification with 0.6 m long GI 100 mm diadrainage GI light grade pipe (For Bridges) |
| 23 | Re-handling of Earthwork with lead 30 meters |
| 24 | Cement concrete (M-10) with stone ballast mixing by mech.Means using concrete mixer volumetric type |
| 25 | Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications for RCC M-20 grade, Using Batching Plant, Transit Mixer and ConcretePump, i/c shuttering and vibrating etc but excluding steel reinforcement complete in all respect. |
| 26 | Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications for RCC M-25grade, Using Batching Plant, Transit Mixer and Concrete Pump, i/c shuttering and vibrating etc but excludingsteel reinforcement complete in all respect. |
| 27 | Supplying & laying dry brick ballast |
| 28 | Cold twisted deformed bars fe 500 grade for RCC workwhere not included in the complete rate of RCC i/cbending binding and placing in position |
| 29 | First class burnt brick work laid in cement sand mortar1:3 in foundation and plinth. |
| 30 | Providing and laying 80 mm thick factory made cementconcrete interlocking Paving blocks of M-40 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as perIRC SP 63 -2014 and of approved size and design /shape laid in Ordinary Grey Colour and pattern over andincluding 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in-Charge. |
| 31 | Plain cement concrete in sub-structure complete as perdrawing and Technical Specifications. For PCC M-15Grade. Using Batching Plant, Transit Mixer and ConcretePump, i/c shuttering and vibrating etc but excludingsteel reinforcement complete in all respect. |
| 32 | Excavation in soil using hydraulic jcb and hydraulictrolley with disposal upto 450 mtr including cutting andloading in trolley, trimming bottom and side slopes inaccordance with requirements of lines, grades and crosssections and transporting to embankment location withinall lifts and lead. (Lead = 2.25 Km Pucca Lead ) |
| 33 | Lifting of Slab of Bridge Bridge |
| 34 | Any Others items Please Enable Macros to View BoQ information |