|
| 1 | SH-I Supply & ITC of 1x13 Passenger Lift |
| 2 | Supply of one No. 13 passenger electric traction lift in the existing lift well at site conforming to the latest lift act and latest IS code and lift practices serving 7 stops 7 landings (G+6) of capacity not less than 884 Kg, having speed 1.0 meters per second with VF regenerative (closed loop) drive suitable for operation on 3 phase, 415/440. V, 50Hz. A.C supply, automatic push button control with latest version control panel, duplex full collective control system with or without attendant and all other equipment like, car, car doors, landing doors, indicators, panel, flooring, guide rails, automatic rescue device, safety devices etc. as per specifications attached including miscellaneous items like supports for guide rails, scaffolding, minor building works like making holes, sockets etc. & making good the same etc complete as required. ( As per BSNL guidelines) Note: Dismantling of minor items (LANDING DOORS) of existing lift available at site, is covered in item No I, and nothing shall be paid extra in this account, all dismantled material is to be handed over to BSNL in same premises) |
| 3 | Installation, testing and commissioning of one No. 13 passenger electric traction lift in the existing lift well at site conforming to the latest lift act and latest IS code and lift practices serving 7 stops 7 landings (G+6) of capacity not less than 884 Kg, having speed 1.0 meters per second with VF regenerative (closed loop) drive suitable for operation on 3 phase, 415/440. V, 50Hz. A.C supply, automatic push button control with latest version control panel, duplex full collective control system with or without attendant and all other equipment like, car, car doors, landing doors, indicators, panel, flooring, guide rails, automatic rescue device, safety devices etc. as per specifications attached including miscellaneous items like supports for guide rails, scaffolding works, minor civil works including modification of landing openings, if required and making holes, sockets etc. & making good the same complete as required. |
| 4 | Sub Head -II (Comprehensive Maintenance) |
| 5 | Comprehensive maintenance of 1 x 13 passenger Lifts i/c checking & performing routine servicing/cleaning as recommended by the manufacturer and specification of contract etc. as reqd. |
| 6 | During first year of operation after warranty period. |
| 7 | During 2nd year of operation after warranty period. |
| 8 | During 3rd year of operation after warranty period. Please Enable Macros to View BoQ information |