|
| 1 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30cm measured at a height of 1m aboveground level and removal of rubbish up to distance of 50m out side the periphery of the area cleared UP PWD SOR-2020/DAR-18/2.31 |
| 2 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 |
| 3 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto Plinth Level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (DAR 5.1.2/ UPPWD SOR 2020) |
| 5 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. UP PWD SOR 2020/ DAR-18/10.25.2 |
| 6 | Painting with synthetic enemel paint of approved brand and manufacture to give an even shade:Two or more coats on new work.UP PWD SOR 2020/DAR/13.61.1 |
| 7 | Earth work in cutting or embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm. layers including rernming and dressing the surface to required levels and slopes and also including 1.50M lift and 30M lead. The earth from cutting to be used in making embankment or to be depoiseted as spoil banks with in 30M distance as directed by yhe Engineer incharge.Excluding Royality. Wherever applicable for small work or Abadi area. (Only for where machine can not be reach/Move) SORUPPWD/253A+231A/P-14 |
| 8 | Dry brick on edge flooring in required pattern with bricks of class designation 150 on bed including filling joints with local sand (with F.P.S bricks) complete. UPPWDSOR/DAR-18/11.2) |
| 9 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Based on SOR UP PWD 2020) |
| 10 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50mm including strengthing with 2 mm dia wire or nuts, bolts and washers as requried complets as per the direction of engineer-in-charge. Made of G.I. wire of dia 4mm . Based on UPPWD SOR-2020/DAR-18/16.70.1/P-191 |
| 11 | R.C.C Standards post/Strut/rails/pales of mix 1:1.5:3(1cement: 1.5 coarse sand: 3 graded stone aggregate 12.5mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately.) UP PWD SOR-2020/DAR-18/16.15.1 Please Enable Macros to View BoQ information |