| 1 | Running works for providing small and large new electricity connections and electrification under Jhatpat/Nivesh Mitra portal and Deposit |
| 2 | Safe Loading & Unloading And Carriage of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 3 | Safe Loading & Unloading And Carriage of PCC 11 Mtr Long From Electricity Store Center Maharajganj to Work SiteDistance 70-110 km |
| 4 | Safe Loading & Unloading And Carriage of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 5 | Safe Loading & Unloading And Carriage of ACSR Weasel conductor FromElectricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 6 | Safe Loading & Unloading And Carriage of LT ABC (3x50+1x35+1x16) From Electricity Store Center Maharajganj to Work Site |
| 7 | Safe Loading & Unloading And Carriage of LT ABC (3x95+1x35+1x16) From Electricity Store Center Maharajganj to Work Site |
| 8 | Safe Loading & Unloading And Carriage of 11 KV XLPE Cable (3x70) From Electricity Store Center Maharajganj to Work Site |
| 9 | Safe Loading & Unloading And Carriage of 11 kv Disc Insulator with disc Electricity Store Center Maharajganj to Work Site |
| 10 | Safe Loading & Unloading And Carriage of 11 kv Pin Insulator with Pin From Electricity Store Center Maharajganj to Work Site |
| 11 | Safe Loading & Unloading And Carriage of 11 KV. V-type X-arm From Electricity Store Center Maharajganj to Work Site |
| 12 | Safe Loading & Unloading And Carriage of Earthing complete From Electricity Store Center Maharajganj to Work Site |
| 13 | Safe Loading & Unloading And Carriage of Stay Set Complete From Electricity Store Center Maharajganj to Work Site |
| 14 | Safe Loading & Unloading And Carriage of LT Distribution Box From CeElectricity Store Center Maharajganj to Work Site |
| 15 | Safe Loading & Unloading And Carriage of 11 KV PPMC From Electricity Store Center Maharajganj to Work Site |
| 16 | Safe Loading & Unloading And Carriage of 25 KVA T/F FromElectricity Store Center Maharajganj to Work Site |
| 17 | Safe Loading & Unloading And Carriage of 63 KVA T/F From Electricity Store Center Maharajganj to Work Site |
| 18 | safe Loading & Unloading And carriage of 11 kv CT/PT From Electricity Store Center Maharajganj to Work Site |
| 19 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 20 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 21 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 22 | Eraction of 11 mtr ST Pole With All Fittings as per specification. |
| 23 | Eraction of 11 mtr PCC Pole With All Fittings as per specification. |
| 24 | Eraction of 8.5 mtr PCC Pole With All Fittings as per specification. |
| 25 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 26 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 27 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 28 | Plinth of 11 mtr ST Pole as per specification. |
| 29 | Laying saggig and binding of of ACSR Weasel Conductor on eracted pole |
| 30 | Laying of LT ABC of Size (3x50+1x35+1x16) On LT. Pole |
| 31 | Laying of LT ABC of Size (3x95+1x35+1x16) On LT. Pole |
| 32 | Laying of 11 kv XLPE Cable (3x70) |
| 33 | concrecting of stay set as per specification |
| 34 | Erection of Distribution Box as per specification |
| 35 | Installation of 11 KV PPMC as per specification |
| 36 | Installation of 11 kv CT/PT Unit On Double Pole specification |
| 37 | Installation of 25 kVA Distribution Transformer On Double Pole Specification |
| 38 | Installation of 63 kVA T/F Distribution Transformer On Double Pole Specification |
| 39 | Erection of 11 Mtr On Double Pole for Installation of Distribution Tranformer |
| 40 | Intallation of Stay set complete as per specification |
| 41 | Earthing Complete of 11 Mtr ST Pole as per specification. |
| 42 | Earthing Complete of 11 Mtr PCC Pole as per specification. |
| 43 | Earthing Complete of 8.5 Mtr PCC Pole as per specification. |
| 44 | Installation of 11 KV. V-type X-arm as per specification. |
| 45 | Providing and Installation of Eye Hook as per specification. |
| 46 | Providing and Installation of Suspension Clamp |
| 47 | Providing and Installation of Dead End Clamp |
| 48 | Providing and Installation of Pearcing Contector |
| 49 | Providing and Installation of V-type X-arm holding clamp with nut bolt |
| 50 | Providing and Installation of LT PVC Cable (4x25 sqmm) |
| 51 | Providing and Installation of F bracket |
| 52 | Providing and Installation of Top Channel |
| 53 | Providing and Installation of T-Off Channel |
| 54 | Providing and Installation of Stay Clamp |
| 55 | Providing and Installation of Droper angle |
| 56 | Providing and Installation of Camical Earthing |
| 57 | Providing and Installation of Jointing kit 11 KV O/D |
| 58 | Providing and Installation of Jointing kit 11 KV I/D |
| 59 | Providing and Installation of Top/T-off/Droper Chanel Clamp with nut bolt |
| 60 | Providing and Installationof MS Angle 75x75x6x2028(T/F Base) |
| 61 | Providing and Installation of Danger Board |
| 62 | Providing and Installation of Nut & Bolt |
| 63 | Tree Branch Cutting/chopping Please Enable Macros to View BoQ information |