| 1 | New Electricity Connection and Electrification Relative to Jhatpat portal and Depost scheme from 01kv upto 20 kv |
| 2 | Safe Loading & Unloading And Carriage of STP 11 mtr.From Electricity Store Center Maharajganj To work Site Distance 0-50 km |
| 3 | Safe Loading & Unloading And Carriage of PCC Pole (8.5 Mtr Long) From Electricity Store Center Maharajganj To work Site Distance 0-50 km |
| 4 | Safe Loading & Unloading And Carriage of PCC Pole (11 Mtr Long) From Electricity Store Center Maharajganj To work Site Distance 0-50 km |
| 5 | Safe Loading & Unloading And Carriage of ACSR Weasel Conductor From Electricity Store Center Maharajganj To work Site Distance 0-50 |
| 6 | Safe Loading & Unloading And Carriage of ACSR Dog Conductor From Electricity Store Center Maharajganj To work Site Distance 0-50 |
| 7 | Safe Loading & Unloading And Carriage of LT ABC Cable (3x50+1x35+1x16) From Electricity Store Center Maharajganj To work Site |
| 8 | Safe Loading & Unloading And Carriage of LT ABC Cable (3x95+1x35+1x16) From Electricity Store Center Maharajganj To work Site |
| 9 | Safe Loading & Unloading And Carriage of 11 KV Disc Insuletor with disc From Electricity Store Center Maharajganj To work Site |
| 10 | Safe Loading & Unloading And Carriage of 11 KV Pin Insuletor with pin From Electricity Store Center Maharajganj To work Site |
| 11 | Safe Loading & Unloading And Carriage of V-type X-arm From Electricity Store Center Maharajganj To work Site |
| 12 | Safe Loading & Unloading And Carriage of Earthing Complite From Electricity Store Center Maharajganj To work Site |
| 13 | Safe Loading & Unloading And Carriage of Stay Set Complete From Electricity Store Center Maharajganj To work Site |
| 14 | Safe Loading & Unloading And Carriage of LT Distribution Box FromElectricity Store Center Maharajganj To work Site |
| 15 | Safe Loading & Unloading And Carriage of 10 KVA T/F From Electricity Store Center Maharajganj To work Site |
| 16 | Safe Loading & Unloading And Carriage of 16 KVA T/F From Electricity Store Center Maharajganj To work Site |
| 17 | Safe Loading & Unloading And Carriage of 25 KVA T/F From Electricity Store Center Maharajganj To work Site |
| 18 | Safe Loading & Unloading And Carriage of 63 KVA T/F From Electricity Store Center Maharajganj To work Site |
| 19 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 20 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 21 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 22 | Ereaction of 11 mtr ST Pole with all fittings as per epecification |
| 23 | Ereaction of 8.5 mtr PCC Pole with all fittings as per epecification |
| 24 | Ereaction of 11 mtr PCC Pole with all fittings as per epecification |
| 25 | Grouting of 11 mtr ST Pole with Material as per epecification |
| 26 | Grouting of 8.5 mtr PCC Pole with Material as per epecification |
| 27 | Grouting of 11 mtr PCC Pole with Material as per epecification |
| 28 | Making of Plinth as per specification on Erected 11 Mtr ST Pole |
| 29 | Laying of ACSR Weasel Conductor With binding of conductor on Insulator. On Erected pole. |
| 30 | Laying of ACSR dog Conductor With binding of conductor on Insulator On Erected pole. |
| 31 | Laying of LT ABC of Size (3x50+1x35+1x16) On Erected LT Pole |
| 32 | Laying of LT ABC of Size (3x95+1x35+1x16) On Erected LT Pole |
| 33 | Making of 11 kv cable end termination by suitable size 11 kv cable Jointing kit |
| 34 | Conrecting of Stay set Complete as per specification |
| 35 | Installation of LT Distribution Box as per specification |
| 36 | Installation of V-type X-arm on Pole |
| 37 | Installation of 10 kva T/F on Single pole HT, LT side connection DT neutral & body earthing etc. |
| 38 | Installation of 16 kva T/F on Single pole HT, LT side connection DT neutral & body earthing etc. |
| 39 | Installation of 25 kva T/F on Double pole HT, LT side connection DT neutral & body earthing etc. |
| 40 | Installation of 63 kva T/F on Double pole HT, LT side connection DT neutral & body earthing etc. |
| 41 | Providing and Installation of TPMO as per specification |
| 42 | Providing and Installation of Eye Hook |
| 43 | Providing and Installation of Suspenson Clamp |
| 44 | Providing and Installation of Dead End Clmap |
| 45 | Providing and Installation of Pearcing Conector |
| 46 | Providing and Installation of LT Distribution Box Clamp as per specification |
| 47 | Providing and Installation of V type X-arm holding clamp with nut bolt as per specification |
| 48 | Providing and Installation of LT PVC Cable (3.5x70sqmm) as per specification |
| 49 | Providing and Installation of LT PVC Cable (4x25 sqmm) as per specification |
| 50 | Providing and Installation of Transformer Base as per specification |
| 51 | Providing and Installation of F-Bracket with clamp as per specification |
| 52 | Providing and Installation of Top Channel clamp as per specification |
| 53 | Providing and Installationof T-off Channel clamp as per specification |
| 54 | Providing and Installation of Stay Clamp as per specification |
| 55 | Providing and Installation of Droper angle clamp as per specification |
| 56 | Providing and Installation of Chamical Earthing clamp as per specification |
| 57 | Providing and Installation of Top/T-off/Droper Channel Clamp with nut bolt |
| 58 | Providing and Installation of X-Brecing Angle With Clamp |
| 59 | Providing and Installation of Fuse Set Brasing |
| 60 | Providing and Installation of GI Wire 6 Swg |
| 61 | Providing and Installation of GI Wire 8 Swg |
| 62 | Providing and Installationof Gaurding Angle as per specification |
| 63 | Providing and Installation of Gaurding Angle Clamp |
| 64 | Providing and Installation of Eye Bolt |
| 65 | Providing and Installation of PG Clamp |
| 66 | Providing Alu. Paint and painting of ST Pole etc |
| 67 | Providing of Red Oxide Paint and painting of ST Pole etc |
| 68 | Providing and Installation of GS/GI Earth Wire |
| 69 | Providing and Installation of Stone Pad 300x300x75mm |
| 70 | Providing and Installation of Barbed Wire on erected pole |
| 71 | Providing and Installationof Danger Board on erected pole |
| 72 | Providing and Installation of Nut & Bolt |
| 73 | Concreting of Stay set |
| 74 | Tree Branch Cutting/ chopping |
| 75 | New Electricity Connection and Electrification Relative to Nivesh Mitra portal and Depost scheme from above of 21 kv |
| 76 | Safe Loading & Unloading And Carriage STP 11 mtr. From Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 77 | PCC Pole (8.5 Mtr Long) From Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 78 | PCC Pole (11 Mtr Long) From Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 79 | ACSR Weasel ConductorFrom Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 80 | ACSR Dog ConductorFrom Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 81 | LT ABC Cable (3x50+1x35+1x16) From Electricity Store Center Maharajganj To Work Site, |
| 82 | LT ABC Cable (3x95+1x35+1x16) From Electricity Store Center Maharajganj To Work Site, |
| 83 | 11 KV XLPE Cable 3x70 Sqmm From Electricity Store Center Maharajganj To Work Site, |
| 84 | 11 KV XLPE Cable 3x120 / 185 Sqmm From Electricity Store Center Maharajganj To Work Site, |
| 85 | 11 KV Disc Insuletor with disc From Electricity Store Center Maharajganj To Work Site, |
| 86 | 11 KV Pin Insuletor with pin From Electricity Store Center Maharajganj To Work Site, |
| 87 | V-type X-arm From Electricity Store Center Maharajganj To Work Site |
| 88 | Earthing Complite From Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 89 | 11 KV VCB From Electricity Store Center Maharajganj To Work Site, |
| 90 | Stay Set Complete From Electricity Store Center Maharajganj To Work Site, Distance |
| 91 | LT Distribution Box From Electricity Store Center Maharajganj To Work Site, |
| 92 | 11 KV PPMC From Electricity Store Center Maharajganj To Work Site, Distance |
| 93 | 11 KV CT/PT Metering Pole Mounted Unit From Electricity Store Center Maharajganj To Work Site, |
| 94 | 63 KVA T/F From Electricity Store Center Maharajganj To Work Site, Distance 0-50 km |
| 95 | 100 KVA T/F From Electricity Store Center Maharajganj To Work Site, |
| 96 | 250 KVA T/F From Electricity Store Center Maharajganj To Work Site, |
| 97 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 98 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 99 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 100 | Erection of 11 Mtr ST Pole With All fittings as per specification. |
| 101 | Erection of 8.5 Mtr long PCC Pole With All fittings as per specification. |
| 102 | Erection of 11 Mtr PCC Pole With All fittings as per specification. |
| 103 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 104 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 105 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 106 | Making of Plinth of ST Pole as per specification. |
| 107 | Laying sagging and Binding of ACSR Weasel Conductor on Eracted Pole |
| 108 | Laying of ACSR dog Conductor with binding of conductor on insulator |
| 109 | Laying of LT ABC Cable (3x50+1x35+1x16) On LT Pole |
| 110 | Laying of LT ABC Cable (3x95+1x35+1x16) On LT Pole |
| 111 | Laying of 11 KV XLPE Cable 3x70 Sqmm as per specification |
| 112 | Laying of 11 KV XLPE Cable 3x120 / 185 Sqmm as per specification |
| 113 | Installation of 11 KV Disc Insuletor with disc on Pole |
| 114 | Installation of 11 KV Pin Insuletor with pin on Pole |
| 115 | Making of 11 kv cable end termination by suitable size 11 kv cable Jointing kit |
| 116 | Installation of V-type X-arm |
| 117 | Installation of Earthing Complete |
| 118 | Installation of 11 KV VCB as per specification |
| 119 | Erection of Stay Set Complete as per specification |
| 120 | Conrecting of Stay Set Complete as per specification |
| 121 | Installation of LT Distribution Box as per specification |
| 122 | Installation of 11 KV PPMC as per specification |
| 123 | Installation of 11 KV CT/PT Metering Pole Mounted Unit as per specification |
| 124 | Installation of 63 KVA T/F on Double with HT/LT side connection and neutral body |
| 125 | Installation of 100 KVA T/F on Double with HT/LT side connection and neutral body |
| 126 | Installation of 250 KVA T/F On Plinth as per specification |
| 127 | Providing and installation of TPMO |
| 128 | Providing and installation of Eye Hook |
| 129 | Providing and installation of Suspenson Clamp |
| 130 | Providing and installation of Dead End Clmap |
| 131 | Providing and installation of Pearcing Conector |
| 132 | Providing and installation of LT Distribution Box Clamp |
| 133 | Providing and installation of V type X-arm holding clamp with nut bolt |
| 134 | Providing and installation of LT PVC Cable (3.5x70 sqmm) |
| 135 | Providing and installation of F-Bracket with clamp |
| 136 | Providing and installation of Top Channel clamp |
| 137 | Providing and installation of T-off Channel clamp |
| 138 | Providing and installation of Transformer Base clamp |
| 139 | Providing and installation of Stay Clamp |
| 140 | Providing and installation of Droper angle clamp |
| 141 | Providing and installation of Camical Earthing |
| 142 | Providing and installation of 11 Kv Jointing Kit 3X70 sqmm O/D |
| 143 | Providing and installation of 11 Kv Jointing Kit 3X70 sqmm I/D |
| 144 | Providing and installation of 11 Kv Jointing Kit 3X120 sqmm O/D |
| 145 | Providing and installation of 11 Kv Jointing Kit 3X120 sqmm I/D |
| 146 | Providing and installation of Top/T-off/Droper Channel Clamp with nut bolt |
| 147 | Providing and installation of X-Brecing Angle With Clamp |
| 148 | Providing and installation of Fuse Set Brasing |
| 149 | Providing and installation of Gaurding Angle |
| 150 | Providing and installation of Gaurding Angle Clamp |
| 151 | Providing and installation of Eye Bolt |
| 152 | Providing and installation of GI Wire 6 Swg |
| 153 | Providing and installation of GI Wire 8 Swg |
| 154 | Providing and installation ofG.I. Pipe 6 Dia |
| 155 | Providing and installation of GS/GI Earth Wire |
| 156 | Providing and installation of PG Clamp |
| 157 | Providing and installation of Alu. Paint |
| 158 | Red Oxide Paint |
| 159 | Providing and installation of Stone Pad 300x300x75mm |
| 160 | Providing and installation of Barbed Wire |
| 161 | Providing and installation of Danger Board |
| 162 | Providing and installation of Nut & Bolt |
| 163 | Fabrication of 2.0M x 2.0M x 1.6M size Plinth as per specification for intallation of Distribution transformer |
| 164 | Transformer Pale Fancing as per specification |
| 165 | Tree Branch Cutting/ chopping Please Enable Macros to View BoQ information |