|
| 1 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 2 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 3 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : |
| 4 | Rough dressing the trenched ground including breaking clods. |
| 5 | Fine dressing of the ground. |
| 6 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge |
| 7 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 8 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) |
| 9 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads nd lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 60 cm dia, and 60 cm deep |
| 10 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge. |
| 11 | Providing and stacking of Delonix regia (Gulmohar) of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. |
| 12 | Providing and stacking of Murraya exotica of height 45-60 cm. in poly bags of size 15 cm as per direction of the officer-in-charge. |
| 13 | Providing and stacking of Hamelia patens of height 60-75 cm. with 6-8 branches in poly bags of size 25 cm as per direction of the officer-in-charge. |
| 14 | Providing and stacking of Bougainvillea (Variety Butiana, Lady Mary Baring, Mahara,Mohan,Scarlet Queen, Variegated, Glabra Formosa, Peruviana Odissi, Paratha, Subhra,Thimma, Spectabilis L.N Birla, Refulgens) of height 30 cm. to 45 cm. with 2-3 branches in 20 cm size of Earthen pots / Plastic pots & as per direction of the officer-in-charge. (Total no. of C2 from \\"Horticulture calculation back up sheet\\") |
| 15 | Providing and stacking of Iresine herbstii, of height 25-30 cm., full of branches well developed in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. |
| 16 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge.Park 01 Mail for 1.00 Acre per month/per mail 0.59 Acre x 24 Month. |
| 17 | Providing and wartering of irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 lit. capacity with one labour for wateringi/c cost of water, filling of tanker, wartering at site with all leads and lifts as per direction of officer-in-charge. |
| 18 | Tractor with Trolly 1. Above hire-charges (from item code 0002 to 0083) include cost of services of operating staff, cost of lubricating oil, diesel/Petrol/Kerosene oil, other consumables for running the plant and machinery but excluding GST. 2. The hire charges of plant and machinery on per day basis are for single shift of eight working hours. |
| 19 | Providing and stacking of winter seasonal seedling/cutting at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos plants as per direction of the officer-in-charge. A. Petunia hybrid |
| 20 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. |
| 21 | Concrete with 2cm gauge stone grit , coarse and cement in proportion of 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. |
| 22 | M.S or iron work of small sizes and section such as holding down bolts. Hold fast, tie rods grating etc. Wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. |
| 23 | Painting roofs or other iron work in large areas with one coat priming and two coat of approved (above one Sq. Metre) paint (British antesol or equivalent) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work Paint to be used should confirm the ISI no. 103-109. Please Enable Macros to View BoQ information |