|
| 1 | M & L for pressure washing and cleaning thoroughly the bottom floor and inside walls of 7,00,000 gallons capacity swimming pool after draining out of water including cleaning of joints of tiles of the pool by suitable mechanical means using mild hydrochloric acid for fungus/ algae free surfaces including removing out all dirt and foreign matters if any from the pool to a distance not exceeding 50m complete to the satisfaction of the Engineer-in-Charge all as specified and directed.Notes :-(a) Size of the Swimming Pool is 50m length x 25m width and depth varying from 1.2m to 3m (Approx) .(b) Draining of water from shall be responsibility of contractor |
| 2 | M & L for pressure washing and cleaning thoroughly the bottom and inside walls of balancing tank of the swimming pool after draining out of water by suitable mechanical means using bleaching powder including removing of sludge/ slurry/ foreign matters if any from the tank to a distance not exceeding 50m complete to the satisfaction of the Engineer-in-Charge all as specified and directed.Notes :-(a) Size of the Balancing tank is 3.6m length x 2.9m width and depth 4m (Approx)(b) Draining of water from shall be responsibility of contractor |
| 3 | Cleaning of swimming pool (2 /3 days in a week as per requirement) including by providing of minimum 4 Nos labour for operating of suction sweeper & submersible pool cleaner and manual cleaning by using brushes, sweeps etc to the floor sides of walls, over flow water channel of swimming pool surrounding area removing all floated materials/ insects from pool water and removing all foreign materials, mud etc from pool area to outside of the pool not less than 50 mtr as directed at site Engr-in-charge. |
| 4 | M & L for Filter media refilling of Quartz sand sewed as per the standards and details are as follows. Size of sand filter media 16X32 mesh of 450 mm depth all as specified and directed by Engr-in-Charge. |
| 5 | Labour charges washing of filter media (pebbles) and re filling of pebbles and new media and complete to the satisfaction of the Engineer-in-charge all as specified and directed. |
| 6 | M & L for inside painting of filters two coat of red oxide and two coats of epoxy and complete to the satisfaction of the Engineer-in-charge all as specified and directed. |
| 7 | Supply in replacement PVC flexible suction and delivery hoses, ISI marked incorporating a rigid PVC spiral as an integral part of the soft PVC balls green ribbed colour of 40 mm dia, working pressure @ 6 kg/ Sqcm complete all as specified and directed. |
| 8 | Supply in replacement only PVC flexible suction and delivery hoses, ISI marked incorporating a rigid PVC spiral as an integral part of the soft PVC wall green ribbed colour of 50 mm dia, working pressure @ 6 kg/ Sqcm complete all as specified and directed. |
| 9 | Supply in consumption liquid ammonia in 450 ml PVC bottle complete all as specified and directed.Make :- Pearl Filler/ RMCO/ Mizag. |
| 10 | Supply in consumption free chlorine testing kit paper strips (Colome metric TMG) for detection levels (0.05, 0.1, 0.4, 0.6, 0.8, 1.2, 1.5, 2.0, 4.0, 6.0 ppm (Mgle) test time 40 seconds having each bottle of 50 test strips complete all as specified and directed. |
| 11 | Supply in consumption Tri chloro isocyanuric acid (TCCA-90) in white granular form for disinfectant for swimming pool of super quality contains chlorine 90 % duly packed in 50 kg drum 100% solvable in water, having molecular weight 23.44 and appearance in white PH value 1% solution - 2.7 to 3.3 and moisture level 0.5% complete all as specified and directed. |
| 12 | Supply in consumption non ferric alum best quality, ISI marked suitable for using at water treatment plant for drinking purpose complete all as specified and as directed. |
| 13 | Supply in consumption bleaching powder of 30% chlorine available, ISI marked Grade-I QUALITY CONFORMING TO is 673 PACKED IN FACTORY SEALED POLY PACK AND DELIVERED AT AGE E/ M II (U) store yard complete all as specified and as directed. |
| 14 | Supply in consumption Hydrochloric acid industrial grade complete all as specified and directed. |
| 15 | Supply in consumption soda ash confirming to IS complete all as specified and directed. Please Enable Macros to View BoQ information |
| 16 | Supply in consumption soda ash confirming to IS complete all as specified and directed. Please Enable Macros to View BoQ information |