| 1 | Removing Top Cover Plate by opening of Bolt and nuts of T/F and other internal connection of T/F required for repairing safely and reconnect it after appropriately after Minor repairing work of Medium Power Distribution Transformer (11/0.4 KV) installed at various site for Stopping Oil leakage from T/F and other work as per site requirement & site conditions. Firm has to make arrangement for draining and refilling of T/F Oil, if required for carrying out the work. (Distance of 30 Km. from concerned store) |
| 2 | 25,63,100 KVA T/F |
| 3 | 160, 250 KVA, 400 KVA T/F |
| 4 | Toping Up/Filling of Reclaimed T/F Oil in T/F's |
| 5 | T/F Oil in below medium power capacity of T/F's up to appropriate level of conservator Tank for Distribution T/F having less Oil as per Indent placed for repairing by JE/SDO. Filling up of these T/F by Reclaimed T/F Oil upto required level and carriage of reclaimed T/F Oil, T/F drums from concerned store/site including safe loading and unloading at both ends. Complete in all respect as per site requirement (Reclaimed T/F Oil will be provided by the concerned JE(D) (Required Vehicle & suitable Container for storage of Reclaimed T/F Oil will be arranged by the Contractor at his own cost.) |
| 6 | T/F Oil in medium power capacity of T/F's up to 2/3rd level of conservator Tank for Distribution T/F having less Oil as per Indent placed for repairing by JE/SDO. Filling up of these T/F by Reclaimed T/F Oil upto required level and carriage of reclaimed T/F Oil, T/F drums from concerned store/site including safe loading and unloading at both ends. Complete in all respect as per site requirement (Reclaimed T/F Oil will be provided by the concerned JE(D) (Required Vehicle & suitable Container for storage of Reclaimed T/F Oil will be arranged by the Contractor at his own cost.) |
| 7 | Replacement of Old and Damaged H.T Bushing rod including Oil Seal/Gaskets etc. |
| 8 | Removal of Old and damaged H.T Busing Rod from T/F and fixing of suitable size new H.T Busing rod made of Brass with all nuts and bolts etc. including replacement of all old/damaged Neoprene Oil seal/Gasket set by fixing suitable size New Neoprene Oil Seal/Gasket Set & as per site requirement, Complete Job in all respect. (All material will be provided by the Contractor) for (25,63 & 100 KVA T/F) |
| 9 | Removal of Old and damaged H.T Busing Rod from T/F and fixing of suitable size new H.T Busing rod made of Brass with all nuts and bolts etc. including replacement of all old/damaged Neoprene Oil seal/Gasket set by fixing suitable size New Neoprene Oil Seal/Gasket Set & as per site requirement, Complete Job in all respect. (All material will be provided by the Contractor) for (160, 250 & 400 KVA T/F) |
| 10 | Replacement of Old and Damaged L.T Bushing rod including Oil Seal/Gaskets etc. Removal of Old and damaged L.T Busing Rod from T/F and fixing of suitable size new L.T |
| 11 | Busing rod made of Brass with all nuts and bolts etc. including replacement of all old/damaged Neoprene Oil seal/Gasket set by fixing suitable size New Neoprene Oil Seal/Gasket Set & as per site requirement, Complete Job in all respect. (All material will be provided by the contractor) |
| 12 | Stopping Oil leakage from T/F H.T/L.T Bushing side. |
| 13 | Stopping of Oil leakage from T/F L.T/H.T Side Bushing. Removing of all damaged oil Seal/Gasket Set/Cork sheet and fixing of suitable size new Neoprene Oil seal/Gasket set/Cork sheet and tightening of H.T/LT bushing rod Complete Job in all respect. (All material will be provided by the contractor) |
| 14 | Replacement of Old and Damaged LT PVC CABLE (All Material will be provided by Department) |
| 15 | Replace LT Aluminum unarmored XLPE/PVC Cable 3.5x400 Sq.mm |
| 16 | Replace LT Aluminum unarmored XLPE/PVC Cable 1x240/400 Sq.mm |
| 17 | Replacement of Old and Damaged Suitable capacity of Aluminum Lugs (All Material will be provided by Contractor). |
| 18 | fixing of suitable capacity of lugs after removing old and damaged lugs from various capacity of PVC cable with using crimping tools. |
| 19 | Maintenance Repairing Of Damage T/F Plinth |
| 20 | Plinth by Using Bricks, ballast or sand and Cement. (All Material will be provided by Contractor) Please Enable Macros to View BoQ information |