| 1 | Road WorkExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3, MORD-302 (3.5) II SI 16/Ch. 25 including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 2 | Providing and laying spreading and compacting graded stone agreegatge to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layer in sub-base course on well prepared surface and compaction with vibratory roller to achieve the desired density (MORT&H) SPECIFICATION N0 406 including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 3 | Supply of 80mm thick Precast cement concerete Interlocking paver blocks with top layer of minimum 8 mm thickness having plan dimension 200x(160+120mm) of O.P. Cement smooth high gloss finish, skid resistant: manufactured from rubber moulds through vibro- compression mechanism. The compressive strength of concrete paver block shall not be less than 40Mpa (M-40) confirming to IS: 15658-2006 including cost of material, labour, T & P etc required for proper completion of the work as directed by Engineer-in- charge including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 4 | Providing and laying of cement concrete in 1:4:8 (1 cement 4 C.sand 8 40mm stone balast) including supply of all materials labour T&P etc.complete with form work as per direction by E/I.. |
| 5 | Class 150 Brick Work in 1:6 cement and coarse sand (FM 1.50 to 2.00) mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work & as per direction by E/I. |
| 6 | Providing and laying of cement concrete in 1:1.5:3 (1 cement 1.5 C.sand 3 20mm stone grit) including supply of all materials labour T&P etc.complete with form work as per direction by E/I., |
| 7 | Disposal of extra earth/dismantled material within 5.00 km distance.including loading, unloading & cartage as per direcion by E/I. |
| 8 | Dismantaling of old existing ramp/slabs i/e disposal of dismantaled material within 10km distance as per direction by E/I |
| 9 | Drain WorkEarth work in excavation in ordinary soil (loam, day or sand) i/c lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavaled earth in to the trenches or into the side of foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by E/I. |
| 10 | Providing and laying of cement concrete in 1:4:8 (1 cement 4 C.sand 8 40mm stone balast) including supply of all materials labour T&P etc.complete with form work including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 11 | Class 150 Brick Work in 1:6 cement and coarse sand (FM 1.50 to 2.00) mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 12 | 12mm thick plaster in 1:6 cement and coarse sand (F.M. 1.50 - 1.75 ) mortar, single coat on fair side of single or half brick wall for interior plastering including internal rounded angles chamfers and / or rounded angles not exceeding 80mm in girth and finished even and smooth with neat cement finished. No extra for mixing any additive, including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 13 | R.C.C. work with cement approved coarse sand and 20mm gauge stone grit in the proportion of 1:1.5:3 in slabs excluding supply of reinforcement and including necessary centering & shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 14 | M..S. or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. 2% of RCC Qty |
| 15 | P/L of Shuttring, centering including struting propiping etc and removal of form for slabs including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. |
| 16 | Disposal of surplus earth including loading, unloading cartage and disposal in low lying area as directed by the Engineer-in-charge upto 5.00 Km within the scheme and from the site of work and also including leveling and dressing of surface in required level and slope including supply of all material, labour, T&P etc complete required for proper completion of work as per direction of E/I. Please Enable Macros to View BoQ information |