| 1 | Excavation in Soil using hydraulic Excavator and tippers with disposal upto 1000 mtr Excavation for Road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines grades and Cross Section and transpoting to embarkment location with in all lifts and lead upto 1000 mtr |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres.SOR-2018/16.1 |
| 3 | Supplying and stacking at site 90mm to 45 mm size stone aggregate |
| 4 | Supplying and stacking at site 63mm to 45 mm size stone aggregate |
| 5 | Supplying and stacking at site 53 mm to 22.4 mm size stone aggregate |
| 6 | Supplying and stacking at site Moorum |
| 7 | Laying spreading and compacting stone aggregate of specified sizes to WBM specifications including spreading in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate watering and compacting to the |
| 8 | Providing and applying tack coat With bitumen VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.MORTH/503(UPPWD/SOR-2020) |
| 9 | Close Graded Premix Surfacing/Mixed Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. Mechanical means using HMP of appropriate capacity not less than 75 tonnes/hour. UPPWD/SOR |
| 10 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. With common burnt clay F.P.S. (non modular) bricks of class designation 150. |
| 11 | Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in- charge and accordance with applicable specifications |
| 12 | 2.50% Maintenance for 5 years of road work Please Enable Macros to View BoQ information |