| 1 | Supplying and erecting iron work, sheet metal work consisting of MS sheets, various sections of iron, plates, chequered plates, rods, bars, MS pipes, etc. for panel board or any other purpose with bending, cutting, drilling and welding complete erected at the position with necessary materials duly painted with one coat of red oxide and two coats of enamel paint to match the switchgears. |
| 2 | Supplying of double flange sluice valve confirming for IS-14846 including as per test pressure, stainless steel spindle, caps, including inspection charges, transportation up to departmental store, unloading, stacking excluding GST levied by GOI & GOM in all resoect etc, complete |
| 3 | Supplying of CI D/F reflux valves (Non Return Valves) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete reflux valves as per I.S. 5312 part I(1984) without by pass arrangment |
| 4 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly Valves &Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (300mm) |
| 5 | Making cement concrete foundation in 1:2:4 cement concrete with foundation bolts and nuts complete. |
| 6 | Removing of 350 HP VT Pump |
| 7 | Removing of 300 HP VT Motor |
| 8 | Re-erection of 300 HP VT Motor |
| 9 | Repairing of 350 HP VT pump set no-2 foundation, old rusted crack foundation removing by gas cutter required new support fitting by complete welding, drilling work etc. complte job at site with material labour charges. |
| 10 | Removing of old 300 mm dia Non Return Valve & Sluice Valve from the line for erection of newly supplied valves. |
| 11 | Concrete Breaker & Compressor For making Hole at wall & sump slap etc complete job. |
| 12 | Charges for shifting of distribution panel from sump slab to the shade allocated for panel by removing tins & using hydra crane etc. complete work with labor charges. Please Enable Macros to View BoQ information |