|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 3 | By Mechanical Transport including loading,unloading and stacking Lime, moorum, building cum rubbish |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Brick work with Fly ash bricks of class designation 75 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand ). |
| 8 | Brick work with Fly ash bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 (1 cement : 6 coarse sand ). |
| 9 | Filling avaliable excavated earth in plinth and sides of foundation etc. |
| 10 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) |
| 11 | Color washing with lime to give an even shade : new work (new or more coat) |
| 12 | \\"Clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m ,outside the periphery of the area cleared. \\" |
| 13 | Color washing with lime to give an even shade : : Old work (Two or more coat) |
| 14 | Distempering with 1st quality acrylic distemper (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade : Old work (one or more coats) |
| 15 | Painting with synthetic enamel paint of approved brand and manufactuer etc. : Old work (one or more coats) |
| 16 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 17 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 18 | Total Impact of GST for The Purpose of CTC Please Enable Macros to View BoQ information |