| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | Supply of stay clamp suitable for PCC pole 8.5 mtr height, fabricated from MS steel, complete with nuts, bolts, washers and all necessary accessories, conforming to approved drawings and UPCL specifications. |
| 3 | Supply of Suspension Clamp with Eye Hook suitable for LT AB Cable, made of high strength aluminium alloy with galvanized iron (GI) eye hook, complete with bolts, nuts, washers and all necessary accessories, suitable for supporting and suspending conductor on poles, conforming to relevant IS standards and UPCL specifications. |
| 4 | Supply of LT Bare Neutral Connector (PG Clamp) suitable for Distribution Box connections, for aluminium conductor range 95–95 sq.mm, made of high strength aluminium alloy, complete with bolts, nuts, washers and all necessary accessories, suitable for secure electrical connection, conforming to relevant IS standards and UPCL specifications. |
| 5 | Supply of Dead End Clamp with I Hook suitable for LT AB Cable, made of high strength aluminium alloy with galvanized iron (GI) I-hook, complete with bolts, nuts, washers and all necessary accessories, suitable for proper tensioning and termination of conductors, conforming to relevant IS standards and UPCL specifications. |
| 6 | Supply of Stay Insulator size 100×115 mm, made of glazed porcelain/insulated material, suitable for 11 kV/LT stay wire application, complete in all respects including proper finish, high mechanical strength, and conforming to relevant IS standards and UPCL specifications. |
| 7 | Supply OF AL to AL connector for AB Cable 95 to 95mm with all associated accessories, conforming to relevant IS standards and UPCL specifications. |
| 8 | Supply of Piercing Connector suitable for LT AB cable, size 95 sq.mm to 25 sq.mm, with all necessary accessories, conforming to relevant IS standards and UPCL specifications. |
| 9 | Supply of LT Bare Neutral Connector (PG Clamp) suitable for connecting 95–25 sq.mm aluminium conductors, made of aluminium alloy, complete with bolts, nuts, washers and all necessary accessories, suitable for proper electrical connection, conforming to relevant IS standards and UPCL specifications. |
| 10 | Supply of LT Distribution Box, Three Phase, Four Wire system, made of SMC/FRP/metallic enclosure complete with inbuilt panel lock, aluminium bus bars (RYB & neutral), suitable for 415 V system, including internal wiring terminals, accessories, and all necessary fittings as per approved drawings, IS standards and UPCL specifications. |
| 11 | Supply of MS bolts and nuts of assorted sizes as per site requirement, complete with washers, conforming to relevant IS standards and UPCL specifications, suitable for electrical line and structure works. |
| 12 | Supply of Aluminium Crimping Type Lugs suitable for 95 sq.mm conductor, complete with palm and barrel suitable for proper crimping termination, conforming to relevant IS standards and UPCL specifications. |
| 13 | Supply of Aluminium Crimping Type Lugs suitable for 25 sq.mm conductor, complete with palm and barrel suitable for proper crimping termination, conforming to relevant IS standards and UPCL specifications. |
| 14 | Supply of Aluminium Crimping Type Lugs suitable for 70 sq.mm conductor, complete with palm and barrel suitable for crimping termination, conforming to relevant IS standards and UPCL specifications. |
| 15 | Supply of MS Half Clamp suitable for LT Distribution Box fixing on PCC pole, fabricated from mild steel, complete with nuts, bolts, washers and all necessary accessories, conforming to approved drawings and UPCL specifications. |
| 16 | Annexure-B (Following work as per UPCL norms) |
| 17 | Excavation of pit for stay set including digging of pit of required size and depth in all types of soil, dressing of sides and bottom, removal of excavated earth to approved dumping site, and all associated works complete as per specifications and direction of Engineer-in-Charge. |
| 18 | Erection of LT stay set including fixing of stay rod, stay wire, stay insulator, turnbuckle, anchor plate, thimble, clamps, tightening and proper alignment, backfilling of pit with soil/stone ballast, ramming, dressing and completion of all associated works as per approved drawings, RESPO specifications and direction of Engineer-in-Charge. |
| 19 | Grouting of stay set including providing and fixing of stay rod with anchor plate, filling of pit with cement concrete in suitable mix (as per site requirement), proper alignment and tensioning of stay wire, curing, finishing and all associated works complete as per approved drawings, RESPO specifications and direction of Engineer-in-Charge. |
| 20 | Excavation of pit for erection of PCC/STP poles including digging of pit of required size and depth in all types of soil, dressing of sides and bottom, removal of excavated earth to approved dumping site, and all associated works complete as per approved drawings and direction of Engineer-in-Charge. |
| 21 | Erection of single PCC pole including loading, unloading, shifting, lowering into pit, proper alignment and vertical positioning, backfilling with suitable soil/stone ballast, ramming, dressing, and making the pole stable complete in all respects as per approved drawings and direction of Engineer-in-Charge. |
| 22 | Dismantling of existing LT overhead line (1 phase 2 wire system) with Weasel conductor, including removal of conductors, insulators, hardware fittings, jumpers, binding wires, lowering of material, stacking at designated site, and all associated works complete as per direction of Engineer-in-Charge. |
| 23 | Dismantling of existing LT overhead line (2 phase 3 wire system) with Weasel conductor, including removal of conductors, insulators, hardware fittings, jumpers, binding wires, lowering of material, stacking at designated site, and all associated works complete as per direction of Engineer-in-Charge. |
| 24 | Dismantling of existing LT overhead line (3 phase 4 wire system) with Weasel conductor, including removal of conductors, insulators, hardware fittings, jumpers, binding wires, lowering of material, stacking at designated site, and all associated works complete as per direction of Engineer-in-Charge. |
| 25 | Cartage/transportation of PCC poles from store/yard to site for a lead distance of 21 km to 50 km, including loading, unloading, handling, shifting, stacking at site in proper alignment, and all associated works complete as per specifications and direction of Engineer-in-Charge. |
| 26 | Cartage/transportation of petty materials (such as clamps, nuts & bolts, insulators, lugs, connectors, hardware fittings, etc.) from store/yard to site for a lead distance of 21 km to 50 km, including loading, unloading, handling, safe stacking at site, and all associated works complete as per specifications and direction of Engineer-in-Charge. |
| 27 | Disconnection and reconnection of consumer service connection including opening and restoration of service line from LT network, disconnection/reconnection of service cable from AB cable/LT line, tightening of connections, checking of load safety, sealing (wherever applicable), and all associated works complete as per direction of Engineer-in-Charge. |
| 28 | Installation of LT Distribution Box (Single Phase & Three Phase) including fixing on PCC pole/wall mounted structure, proper alignment and tightening, making of incoming and outgoing connections, fixing of internal bus bars and accessories, provision of earthing connection, and all associated works complete up to commissioning, as per approved drawings, UPCL specifications and direction of Engineer-in-Charge. |
| 29 | Laying, stringing and sagging of LT XLPE Aerial Bunched (AB) Cable of size 3 × 95 + 1 × 70 sq.mm, including fixing of suspension clamps, dead-end clamps, insulated piercing connectors (IPC) wherever required, proper tensioning, binding, jointing, and all associated works complete as per approved drawings, IS standards and UPCL specifications. |
| 30 | Disconnection and reconnection of consumer service connection including opening/closing of service line, disconnection from LT line/AB cable, reconnection after compliance, tightening of connections, checking of load safety, sealing (if applicable), and all associated works complete as per direction of Engineer-in-Charge. |
| 31 | Back carriage/transportation of dismantled scrap material from site to store/yard including loading, unloading, handling, segregation (if required), safe stacking at destination, and all associated works complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |