|
| 1 | Safe cartage of 8.5 Mtr. long PCC poles | Safe cartage of 8.5 Mtr. long PCC poles |
| 2 | Safe cartage of 11 Mtr. long ST poles | Safe cartage of 11 Mtr. long ST poles |
| 3 | Safe cartage of line material | Safe cartage of line material |
| 4 | Erection of newly erected 8.5 Mtr. long PCC poles as single support structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. | Erection of newly erected 8.5 Mtr. long PCC poles as single support structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. |
| 5 | Erection of newly erected 11 Mtr. long ST poles as single pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. | Erection of newly erected 11 Mtr. long ST poles as single pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. |
| 6 | Erection of newly erected 8.5 Mtr. long PCC poles as double pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. | Erection of newly erected 8.5 Mtr. long PCC poles as double pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. |
| 7 | Erection of newly erected 11 Mtr. long ST poles as double pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. | Erection of newly erected 11 Mtr. long ST poles as double pole structure, including complete HT/LT fittings as per direction of Engineer incharge/RESSPO manual. |
| 8 | Concreting/Grouting of newly erected 8.5 Mtr. long PCC poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. | Concreting/Grouting of newly erected 8.5 Mtr. long PCC poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 9 | Concreting/Grouting of newly erected 11 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. | Concreting/Grouting of newly erected 11 Mtr. long ST poles as single support/double pole structures. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 10 | Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. | Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. |
| 11 | Fixing of earthing rod as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. | Fixing of earthing rod as per direction of supervising engineer/RESSPO manual. including the cost of labour, T&P etc. required for proper completion of work. |
| 12 | Laying, sagging, stringing, binding and jumpering of new ACSR Weasel Conductor on the erected poles in 11 KV HT/LT lines also providing in-place of damaged/misplace conductor due to heavy storm. | Laying, sagging, stringing, binding and jumpering of new ACSR Weasel Conductor on the erected poles in 11 KV HT/LT lines also providing in-place of damaged/misplace conductor due to heavy storm. |
| 13 | Laying, stringing, binding and termination etc. of ABC Cable of various size on the erected poles as per direction of supervising engineer/RESSPO manual. | Laying, stringing, binding and termination etc. of ABC Cable of various size on the erected poles as per direction of supervising engineer/RESSPO manual. |
| 14 | Re-sagging of loose conductor of 11 KV HT lines at various places. | Re-sagging of loose conductor of 11 KV HT lines at various places. |
| 15 | Re-sagging of loose conductor of LT lines at various places. | Re-sagging of loose conductor of LT lines at various places. |
| 16 | Dismentling & removal of existing/erected old & damaged PCC/STP/Joist/Rail Poles as single pole structure with its accessories. | Dismentling & removal of existing/erected old & damaged PCC/STP/Joist/Rail Poles as single pole structure with its accessories. |
| 17 | Dismentling & removal of existing/erected old & damaged PCC/STP/Joist/Rail Poles as double pole structure with its accessories. | Dismentling & removal of existing/erected old & damaged PCC/STP/Joist/Rail Poles as double pole structure with its accessories. |
| 18 | Carriage of damaged/rusted ST/Rail/Joist Poles from work site to ESC. | Carriage of damaged/rusted ST/Rail/Joist Poles from work site to ESC. |
| 19 | Replacement of damaged/misplace \\"V\\" Type Cross Arm | Replacement of damaged/misplace \\"V\\" Type Cross Arm |
| 20 | Guarding with fitting of all accessories as per RESSPO manual. | Guarding with fitting of all accessories as per RESSPO manual. |
| 21 | Dismentling & removal of damaged weasel conductor with its accessories due to heavy storm and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). | Dismentling & removal of damaged weasel conductor with its accessories due to heavy storm and also cartage of old/damaged & scrap line material from work site to store centre/JE(s). |
| 22 | Straightening of tilted single support as 8.5/11.0 Mtr. Long PCC/ST Pole at various places. | Straightening of tilted single support as 8.5/11.0 Mtr. Long PCC/ST Pole at various places. |
| 23 | Chopping of Tree Branches coming in the vicinity of the lines during the execution of above work. | Chopping of Tree Branches coming in the vicinity of the lines during the execution of above work. |
| 24 | Fixing of T-Off Channel with fitting of all accessories as per RESSPO manual. | Fixing of T-Off Channel with fitting of all accessories as per RESSPO manual. |
| 25 | Note: Any quantity of item from sl no. 1 to sl no. 24 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 24 may vary to any limit within the financial value of agreement against this tender. |