| 1 | Supply and jointing three core submersible flat cables of approved make with bare bunched copper conductor insulated and sheathed with PVC for submersible pump motors /fountain lights etc with voltage grade 1100 volts marked with IS:694, 1990 including cost of jointing, materials as well as carriage, loading, unloading etc. complete in all respect up to the entire satisfaction of Engineer- in-Charge.Submersible Copper Cable 3 Core 35 sqmm |
| 2 | Operation and Maintenance of Old Faridabad storm water disposal including maintenance and repair of transformer (200kva), gratings (2 nos), stainless steel (SS) gates (2 nos), 4 Nos. starter panels (2 nos for 40 HP 2 nos 30 HP Non clog Submersible Motor Pump , 4 Nos. Non-colg submersible motor pumping sets (2 nos 40, 2nos 30HP), DG set (200 kva), valves and specials, 1 No 400 mm Di delivery lines 1320 mtr from sump well to Nallah and cleaning of 2 Nos. gully traps to be carried out from time to time and all associated electrical installations, along with deployment of operator and sewer man complete in all respects as per the directions and to the entire satisfaction of the Engineer-in-Charge. |
| 3 | Relaying 300mm DI line inside Buriya Nallah and Cleaning and desilting of buriya Nallah from NHPC chowk to Mathura road culvert (Outfall of Greenfield sewage to culvert facing sector 45), including removal of sludge/silt/garbage manually or mechanically as required and loading, unloading and stacking the same and transported by mechanical means to a disposal site identified by the contractor free from any litigation and approved by Engineer-in-Charge including all lifts, leads, tools and plants, labour, fuel, carriage, and other incidental charges complete as directed by the Engineer-in-Charge. |
| 4 | Carrying out various electrical and mechanical installation works including rectification and correction of existing electrical cabling, dismantling and shifting of DG set, installation of new submersible pump by relacing the old one and re-installation of DG set after completion of foundation works, re-laying of existing submersible pump cable through HDPE pipe, reconnection, testing and commissioning of the complete electrical system, fixing submersible pump to sumpwell including all labour, tools and tackles, consumables and minor materials, complete in all respects and to the entire satisfaction of the Engineer-in-Charge. |
| 5 | Desilting and cleaning of sumpwell of size 6.45mtr x 6.45mtr x 1.5mtr manually/mechanically including removal and removal and disposal of silt/sludge along with cleaning of 2 nos gully trap in all respects, as per the directions and to entire satisfaction of Engineer-in-charge. |
| 6 | Estimate for operation and maintenance of Storm water disposal sec-13 for 3 years. |
| 7 | operation and maintenance of Storm water disposal sec-8 Faridabad for 3 years |
| 8 | operation and maintenance of Alson Chowk near main Mathura road Ballabgarh for 3 year. |
| 9 | Providing, laying, aligning, and jointing 200 mm diameter (i/d) M.S. pipe having 8 mm wall thickness, fabricated as per IS:3589 (2001) from Fe-330 grade steel plates conforming to IS:2062 and manufactured by approved makes such as TATA, Jindal, or ESL. The work includes cutting, leveling, grinding, and jointing of the pipes by welding. The internal surface and outer surface of the pipe shall be coated with a minimum 200-micron thick food-grade epoxy lining complete in all respects as per specifications and as per the direction and to the entire satisfaction of the Engineer-in-Charge. |
| 10 | Supplying, installing, testing and commissioning of Star/Delta starter panel for 60 HP non-clog submersible pump, suitable for 415 Volts, 3 Phase, 50 Hz AC supply, complete with 3-position selector switch (Manual–Off–Auto) with auto mode facility, MCCB of minimum 160A rating for short circuit protection, single phase preventor, thermal overload relay suitable for motor full load current (adjustable range 70A to 100A) and AC-3 duty contactors comprising main contactor not less than 125A and star and delta contactors not less than 80A each including voltmeter, ammeter and frequency meter with selector switches, complete with all control wiring, terminations, glands, lugs and necessary protection accessories etc. The panel shall be fabricated out of 10-tank process treated MS enclosure with PU gasket, having minimum 1000 hours Salt Spray Test (SST) life, conforming to relevant IS/IEC standards, complete in all respects as per direction and to the entire satisfaction of Engineer-in-Charge. |
| 11 | Dismantling of reinforced cement concrete (RCC) raft of existing sump well size 3mx3m and thickness varying from 250mm to 500 mm, including cutting of reinforcement, breaking into pieces, stacking of serviceable material and disposal of unserviceable material within 50 meters lead, including dismantling and safe removal of existing machinery comprising 4 nos. non clog submersible pumps, delivery line, NRVs, sluice valve, electrical fittings and all allied appurtenances and refixing/reinstallation of the same after completion of work, including making necessary temporary pumping arrangements during execution and providing, fixing and commissioning of pumps in case of rainfall/emergency as required to ensure uninterrupted functioning, complete in all respects, including cost of labour, tools and plants, machinery and adherence to all safety measures as per relevant codes and standards as directed by Engineer-in-charge. |
| 12 | Operation and Maintenance of NHPC storm water disposal including maintenance of:- Main Components include:- a) Transformer (400kva) b) SS gates-2 nos c) Stainless steel gates -2 nos d) 4 Nos. starter panels- (3 nos for 40 HP Non clog Submersible Motor Pump and 1 no for 100 HP Non clog Submersible Motor Pump) e) 4 Nos. Non-colg submersible motor pumping sets -(2 nos 40, 1no 30HP and 1no 60HP) f) DG set -125 kva e) Gratings, valves and specials, Delivery line, complete in all respects including desilting of the sump well at least twice during the rainy season, as per the directions and to the entire satisfaction of the Engineer-in-Charge. |
| 13 | HSR Items- Master Drainage Scheme Faridabad- Operation and Maintenance of Storm water disposal sec-13, Alson Chowk, Old Underpass and NHPC underpass and disposal Sector-8 Faridabad for 3 years and all other works contigent thereto. Please Enable Macros to View BoQ information |