| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms. Lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. |
| 3 | With common burnt clay F.S.P. (non modular) bricks of class designation 7.5 |
| 4 | P/F PVC Pipe 150 mm |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level |
| 6 | 1:5:10 ( 1 cement : 5 course sand (zone- III): 10 graded Brick aggregate 40 mm nominal size.) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level |
| 8 | 1:2:4 ( 1 cement : 2 course sand (zone- III): deserved from natural sources 4 graded stone aggregate 20 mm norminal size derived from natural sources) |
| 9 | Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 10 | Cement mortar 1:6 ( 1 Cement : 6 coarse sand) |
| 11 | Cement Plaster 1:3 ( 1 Cement : 3 coarse sand) finished with a floating coat of neat cement. |
| 12 | 12 mm cement plaster |
| 13 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plane window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1:5:3 ( 1 cement : 1.5 course sand zone-III) : 3 graded stone aggregate 20 mm nominal size.) |
| 14 | Steel reinforcement for R.C.C work including straightening, cutting, banding, placing in position and blinding all complete up to plinth level. |
| 15 | Thermo- Mechanically Treated bars of grade Fe-500D or more. |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 17 | Suspended floors, roofs, landings, balconies and access plateform. |
| 18 | Site cleaning and other unforeseen material. |
| 19 | GST 18% Please Enable Macros to View BoQ information |