| 1 | Providing CCTV survey by Pan Tilt Camera with Zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of Engineer-in-Charge. |
| 2 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge. 600mm Diameter HSR 21.113.7 |
| 3 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)21.113.7 For 900mm i/d sewer line |
| 4 | Locating buried manholes through magnetic tracking process / appropriate technology in all types of soil conditions by the use of universal precision cable and manhole locator including marking the estimated findings on the plan of the area and making recommendations for related work execution location as per the stipulated specifications and direction of Engineer in charge. As per NEW HSR no.21.114 |
| 5 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) For 1800mm i/d sewer line |
| 6 | Operation and Maintenance of master sewer line (dia.600mm to 1800mm ) Pratapgarh Zone for 2.5 year. (Approx. 50 KM or more) including patrolling and resolve all complaints (overflow, blockage, settlement of sewer line, missing manhole cover, repair manhole with in 02 hr and desilting of manhole, line if required of related master sewer line of Pratapgarh Zone. |
| 7 | HSR Items- Master Sewerage Scheme Faridabad:-`` Operation and Maintenance of Master Sewer line (dia.600mm to 1800mm )Related to Pratapgarh Zone, Faridabad for 05 Years including patrolling and resolve all complaints (overflow, blockage, settlement of sewer line, missing manhole cover, repairing, Raising manhole with in 02 hr. Please Enable Macros to View BoQ information |