| 1 | WPB 160*125 (30.44KG/Mtr), 11mtr- withbase plate 300*300*12 |
| 2 | Earthing Coil for support |
| 3 | No-8 GI wire (Dia 4.6mm)0.131 KG/Mtr For connecting pole with Coil earthing |
| 4 | 11KV 'V' Cross Arm 10.2kg Each (with galvanisation) |
| 5 | GI Back Clamp for 11KV 'V' Cross Arm |
| 6 | 11KV F Clamp2.9kg Each (with galvanisation) |
| 7 | 11KV pin insulator polymer |
| 8 | Anticlimbing Device (GI barbed wire 3Kg support) |
| 9 | Back Clamp for ACD ( 25*3mm GI Earth Flat, 0.59Kg/Mtr & 0.51 Mtr for Each Back Clamp (4pc/support) |
| 10 | Danger Board |
| 11 | Back Clamp for Danger Board ( 25*3mm GI Earth Flat, 0.95Kg/mtr & 0.51 Mtr for Each Back Clamp |
| 12 | GI nuts, bolts and washers |
| 13 | Black Paint |
| 14 | Yellow Colour Paint for background |
| 15 | Sundries |
| 16 | 75*40*6mm GI Channel Straight cross arm 3 mtr long 02Nos (@608Kg/mt) for SP road crossing guarding |
| 17 | Back Clamp for guarding cross arm |
| 18 | EYE hook for Guarding |
| 19 | No-6 & No-8 GI wire (Dia 4.8mm) for 11KV line Guarding @ 30Kg |
| 20 | 25*6mm G.I Flat |
| 21 | GI Pipe Earthing 40mm Die medium Gauge 3mtr Long |
| 22 | GI nuts, bolts and washers |
| 23 | Concreting of 11mtr WPB Poles in ratio 1:1, 5:3 = 0.45Cum, @6648.85=0.45*6648.85= Rs. 2991.98 |
| 24 | Couping of poles in ratio 1:1, 5:3 0.1125Cum. @6648.85= 0.1125*6648.85=Rs. 748.00 |
| 25 | Materials for Massionary work for Earth Pit , Charcoal, salt etc including construction of earthing chamber (Size: 2\\"*2\\") and RCC slab cover |
| 26 | Dismantling of 9/8 Mtr. PCC/joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km/site store and refilling the pit with loose earth and ramming including removal and disposal malba at proper location as per instruction of EIC |
| 27 | Dismantle- Steel Structure of lines & S/s |
| 28 | WTB 160*132 (30.44Kg/Mtr), 11 mtr with base plate 300*300*12 |
| 29 | 9 Mtr 300 KG PSC Pole |
| 30 | RCC Base Plate |
| 31 | Earthing Coil for support |
| 32 | No-8 GI wire (Dia 4.6mm)0.131 KG/Mtr For connecting pole with Coil earthing |
| 33 | 100*50*6mm channel for straight Cross arm 1.2 mtr each 4 no & 0.2 mtr long 4 No (For conversion of 2 no Pin point to cut point as shown in SLD at CE & 01 no proposed cut point |
| 34 | Disc insulator (B&S) 45 KN Polymer |
| 35 | H W fitting (B&S) 2 bolted |
| 36 | PG clamp for 55 mm2 AAA Conductor |
| 37 | Fish Plate 50*8 mm, 3.14 kg/Mtr each 0.280 mtr length |
| 38 | 11KV 'V' Cross Arm 10.2kg Each (with galvanisation) |
| 39 | GI Back Clamp for 11KV 'V' Cross Arm |
| 40 | 11KV F Clamp2.9kg Each (with galvanisation) |
| 41 | 11KV pin insulator polymer |
| 42 | 55 mm2 AAA C |
| 43 | H. T. Stay set ( Complete) |
| 44 | H. T. Stay Insulator |
| 45 | H. T. Stay clamp (1.95Kg/Pair) |
| 46 | 7/10 SWG Stay Wire |
| 47 | Anticlimbing Device (GI barbed wire 3Kg support) |
| 48 | Back Clamp for ACD ( 25*3mm GI Earth Flat, 0.59Kg/Mtr & 0.51 Mtr for Each Back Clamp (4pc/support) |
| 49 | Danger Board |
| 50 | Back Clamp for Danger Board ( 25*3mm GI Earth Flat, 0.95Kg/mtr & 0.51 Mtr for Each Back Clamp |
| 51 | GI nuts, bolts and washers |
| 52 | Black Paint |
| 53 | Yellow Colour Paint for background |
| 54 | Sundries |
| 55 | 75*40*6mm GI Channel Straight cross arm 3 mtr long 02Nos (@608Kg/mt) for SP road crossing guarding |
| 56 | Back Clamp for guarding cross arm |
| 57 | EYE hook for Guarding |
| 58 | No-6 & No-8 GI wire (Dia 4.8mm) for 11KV line Guarding @ 30Kg |
| 59 | 25*6mm G.I Flat |
| 60 | GI Pipe Earthing 40mm Die medium Gauge 3mtr Long |
| 61 | GI nuts, bolts and washers |
| 62 | Sundries |
| 63 | Stay concreting in ratio 1:2:4 as per TPSODL Specification and drawing = 0.2Cum @6648.85= 0.2*6648.85= Rs 1329.77 |
| 64 | Concreting of 11mtr WPB Poles in ratio 1:1, 5:3 = 0.45Cum, @6648.85=0.45*6648.85= Rs. 2991.98 |
| 65 | Concreting of 9 mtr/8 mtr Poles in ratio 1:1, 5:3 =0.375Cum @6648.85=0.375*6648.85= Rs 2493.32 |
| 66 | Couping of poles in ratio 1:1, 5:3 0.1125Cum. @6648.85= 0.1125*6648.85=Rs. 748.00 |
| 67 | Materials for Massionary work for Earth Pit , Charcoal, salt etc including construction of earthing chamber (Size: 2\\"*2\\") and RCC slab cover |
| 68 | Dismantle of AAAC 34/55 mm2 Conductor |
| 69 | Dismantling of 9/8 Mtr. PCC/joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km/site store and refilling the pit with loose earth and ramming including removal and disposal malba at proper location as per instruction of EIC |
| 70 | Dismantle- Steel Structure of lines & S/s |
| 71 | Survey of incremental/delta network and assets changes of 11kv network and updation in GESW databas |
| 72 | WTB 160*132 (30.44Kg/Mtr), 11 mtr with base plate 300*300*12 |
| 73 | 9 Mtr 300 KG PSC Pole |
| 74 | RCC Base Plate |
| 75 | Earthing Coil for support |
| 76 | No-8 GI wire (Dia 4.6mm)0.131 KG/Mtr For connecting pole with Coil earthing |
| 77 | 100*50*6mm channel for straight Cross arm 1.2 mtr each 4 no & 0.2 mtr long 4 No (For conversion of 2 no Pin point to cut point as shown in SLD at CE & 01 no proposed cut point |
| 78 | Disc insulator (B&S) 45 KN Polymer |
| 79 | H W fitting (B&S) 2 bolted |
| 80 | PG clamp for 55 mm2 AAA Conductor |
| 81 | Fish Plate 50*8 mm, 3.14 kg/Mtr each 0.280 mtr length |
| 82 | 11KV 'V' Cross Arm 10.2kg Each (with galvanisation) |
| 83 | GI Back Clamp for 11KV 'V' Cross Arm |
| 84 | 11KV F Clamp2.9kg Each (with galvanisation) |
| 85 | 11KV pin insulator polymer |
| 86 | 55 mm2 AAA C |
| 87 | H. T. Stay set ( Complete) |
| 88 | H. T. Stay Insulator |
| 89 | H. T. Stay clamp (1.95Kg/Pair) |
| 90 | 7/10 SWG Stay Wire |
| 91 | Anticlimbing Device (GI barbed wire 3Kg support) |
| 92 | Back Clamp for ACD ( 25*3mm GI Earth Flat, 0.59Kg/Mtr & 0.51 Mtr for Each Back Clamp (4pc/support) |
| 93 | Danger Board |
| 94 | Back Clamp for Danger Board ( 25*3mm GI Earth Flat, 0.95Kg/mtr & 0.51 Mtr for Each Back Clamp |
| 95 | GI nuts, bolts and washers |
| 96 | Black Paint |
| 97 | Yellow Colour Paint for background |
| 98 | Sundries |
| 99 | 75*40*6mm GI Channel Straight cross arm 3 mtr long 02Nos (@608Kg/mt) for SP road crossing guarding |
| 100 | Back Clamp for guarding cross arm |
| 101 | EYE hook for Guarding |
| 102 | No-6 & No-8 GI wire (Dia 4.8mm) for 11KV line Guarding @ 30Kg |
| 103 | 25*6mm G.I Flat |
| 104 | GI Pipe Earthing 40mm Die medium Gauge 3mtr Long |
| 105 | GI nuts, bolts and washers |
| 106 | Stay concreting in ratio 1:2:4 as per TPSODL Specification and drawing = 0.2Cum @6648.85= 0.2*6648.85= Rs 1329.77 |
| 107 | Concreting of 11mtr WPB Poles in ratio 1:1, 5:3 = 0.45Cum, @6648.85=0.45*6648.85= Rs. 2991.98 |
| 108 | Concreting of 9 mtr/8 mtr Poles in ratio 1:1, 5:3 =0.375Cum @6648.85=0.375*6648.85= Rs 2493.32 |
| 109 | Couping of poles in ratio 1:1, 5:3 0.1125Cum. @6648.85= 0.1125*6648.85=Rs. 748.00 |
| 110 | Materials for Massionary work for Earth Pit , Charcoal, salt etc including construction of earthing chamber (Size: 2\\"*2\\") and RCC slab cover |
| 111 | Dismantle of AAAC 34/55 mm2 Conductor |
| 112 | Dismantling of 9/8 Mtr. PCC/joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km/site store and refilling the pit with loose earth and ramming including removal and disposal malba at proper location as per instruction of EIC |
| 113 | Dismantle- Steel Structure of lines & S/s |
| 114 | Survey of incremental/delta network and assets changes of 11kv network and updation in GESW databas Please Enable Macros to View BoQ information |