| 1 | Subwork No 1 Solar Pumping Machinery Supplying, installing, testing and commissioning of solar water pump of 3 HP capacity, AC surface type, 243000 LPD, total head of 10m, comprising of 2700Wp PV array / submersible type (with controller) 121500LPD/96000LPD/ 57000LPD/ 39000LPD, total head of 20m/30m/ 50m/70m, comprising of 2700Wp/3000Wp/ 3000Wp/ 3000Wp PV array respectively mounted on GI structure with necessary hardware and suitable inverter with 5 years on site performance warrantee. Specification no. ESD-SWPS3 HP |
| 2 | Providing and erecting chain link fencing 1.6 M. height with G.I. chain link of size 50 x 50 mm, 8 gauge thick and fixed 75 mm above ground level on vertical M.S. Angles of 40 x 40 x 6 mm size, includig and excavating pits for foundation and embedded in C.C. block of 1:4:8 mix of size 450 x 450 x 670 mm. at 1.75 M. c/c with iron bar 16mm dia as hold fast including welding link with angle frame at 30 cm c/c with nuts and bolts and horizontal M.S. Angles at top and bottom of 25 x 25 x 5 mm size and vertical M.S. flat 35 x 5 mm and 25 x 5 mm horizontal including cross support of 40 x 40 x 6 mm angles both side at every corner or bend embedded in concrete blocks of 1:4:8 of size 450 x 450 x 670 mm including 3 coats of oil painting etc. complete. |
| 3 | Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kg/Smt. |
| 4 | Subwork No 2 Rising Main Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS4984/14151/ 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread/ insert joint/ quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials including transportation and freight charges, inspection charges, loading / unloading charges conveyance to the departmental stores&stacking the same in closed shadeduly protecting from sunrays&rains, excluding GST levied by GI GOM in all respect etc.complete.)50 mm dia HDPE PN 6 Pipes (6kg) |
| 5 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) |
| 6 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge,normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259) |
| 7 | Excavation for foundation /pipe trenches in Hard murum and boulders,W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below,stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 8 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) |
| 9 | Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259 |
| 10 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 11 | Lowering,Laying and Jointing H.D.P.E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours asdirected by engineer in charge as per IS-7634 Part II.50 mm dia HDPE PN 6 Pipes (6kg) |
| 12 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard murum material in 15cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 13 | Subwork No 3 UCR Syntex Storage 5k LtrExcavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) |
| 14 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-3/259) |
| 15 | Providing Concrete and M-10/ laying in of trap/ granite / quartzite gneiss metal for foundation bedding including bailing out water, formwork, compaction, curing, etc. complete. (Cement5.90bags/cum) |
| 16 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.completeAbove GL |
| 17 | Below GL |
| 18 | Providing Concrete and M-15/ laying in of trap/ granite / quartzite gneiss metal for foundation bedding including bailing out water, formwork, compaction, curing, etc. complete. (Cement5.90bags/cum) |
| 19 | Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curing etc. complete. |
| 20 | Providing and fixing H.D.P container one piece moulded water tank made out of low density polythyler and built corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 1000 to 20,000 litres |
| 21 | Subwork No 4 Distribution System Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS4984/14151/ 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread/ insert joint/ quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials including transportation and freight charges, inspection charges, loading / unloading charges conveyance to the departmental stores&stacking the same in closed shadeduly protecting from sunrays&rains, excluding GST levied by GI GOM in all respect etc.complete.)63 mm dia HDPE PN 8 Pipes |
| 22 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.Without by pass arrangement -PN -165 mm - PN -1 |
| 23 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) |
| 24 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge,normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259) |
| 25 | Excavation for foundation /pipe trenches in Hard murum and boulders,W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below,stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 26 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) |
| 27 | Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259 |
| 28 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 29 | Lowering,Laying and Jointing H.D.P.E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours asdirected by engineer in charge as per IS-7634 Part II.63 mm dia HDPE PN 8 Pipes |
| 30 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)65 mm - PN -1 |
| 31 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) |
| 32 | Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. |
| 33 | Providing and constructing two taps standpost as per type design with excavation 15 cm thick PCC 1:3:6 bedding 20 mm thick PCC 1:2:4 concrete for platform of 1.75 M dia. with side curb and bucket rest, 80 mm dia, heavy duty GI pipe central post duly filled there in with C.C. 1:2:4, 5 M long, 20 mm dia. medium G.I. pipe from point of tapping to standpost, additional 20 mm dia G.I. pipe fixed vertically upto 15 mm dia self closing water taps, one brass ferrule, etc. complete together with all labour and material charges as per drawing and as directed by Engineer-incharge when good foundation is available. Rate includes draining arrangement by excavating open gutters.e. |
| 34 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard murum material in 15cm layers with all leads and lifts including consolidation, surcharging etc. complete. Please Enable Macros to View BoQ information |