| 1 | Item No.1 :- Excavation for foundation / pipe trenches in earth soil of all types, sand, gravel & soft murum including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing |
| 2 | Item No.2 :- Excavation for foundation / pipe trenches in hard murum and boulders including removing the excavated material upto a distance of 50 m & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation & excluding the backfilling etc complete. |
| 3 | Item No.4 :-Providing & supplying ISI mark G.I.pipes Of following Class. & Dia including all local & central taxes, octroi, inspection charges, transportation to stores, etc. complete |
| 4 | 50 mm dia. medium class 5.16 kg/m |
| 5 | Item No.5 :-Lowering , laying & jointing G.I.pipes and specials of following class & dia. Including conveyance from stores to site of work, all labour, giving satisfactory hydraulic test, etc. complete either underground or in vertical position as directed by Engineer-In-Charge.80 mm dia. medium class 8.64kg/m |
| 6 | 50 mm dia. medium class 5.16 kg/m |
| 7 | Item No.6:-Providing & supplying ISI mark G.I.specials Of following Class. & Dia including etc. complete |
| 8 | Item No 7 :- Providing, ISI mark CI double flanged short body pattern type manually reflux valve of following dia including all taxes, all transportation charges, inspection charges loading unloading stacking… etc complete.50 mm dia. CIDF Reflux valve |
| 9 | Item No.8 :- Lowering, laying & jointing in position following Cl D/F reflux Values including cost of all labour jointing material, including nut bolts & giving satisfactory hydraulic testing etc complete.80 mm dia.CIDF Reflux valve |
| 10 | 50 mm CIDF Reflux valve |
| 11 | Item No.9. Providing and laying in situ, following grades of M 150 C.C. of trap metal for foundation and bedding including dewatering, formwork, compacting and curing, finishing etc. complete. |
| 12 | Item no 10 :- Refilling the trenches from excavated stuff with soft material in 15 cm layers with all leads & lifts including consolidation surcharging … etc complete. Please Enable Macros to View BoQ information |