|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. |
| 2 | Earth work in excavation by mechanical means trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth -1 m from cutting edge : All kind of soil. |
| 3 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. Nallah stone |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Supplying and placing stone boulders at site including cost of stone. |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Reinforcement for RCC work including straightening , cutting, bending, placing in position and binding all complete |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns etc. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms |
| 11 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like |
| 12 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete ar per directions of Engineer-in-charge. |
| 13 | Carriage of material from source to site of work by MT including loading, unloading and stacking complete- Sand 9.00 KM by MT |
| 14 | Carriage of material from source to site of work by MT including loading, unloading and stacking complete- Stone aggregate 7.00 KM by MT |
| 15 | Provision for Citizen Information Board. Please Enable Macros to View BoQ information |