| 1 | Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903. |
| 2 | Maintenance of Earthen shoulder (Stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. |
| 3 | Restoration of rain cuts with soil , moorum gravel or a mixture of these, clearing the loose soil, benching for 300 mm width laying fresh material in layers not exeeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRT&H technical specification Clause 3002. |
| 4 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. |
| 5 | Surface DrainConstruction of unlined surface drains of average cross-sectional area 0.40 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.Surface Drains in Ordinary Soil Manual Means |
| 6 | Brick on edge solingProviding and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 7 | Flat brick solingProviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 8 | Brick edging laid in full brick widthProviding and laying brick edging on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 9 | Brick edging laid length wiseProviding and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. |
| 10 | WBM Gr-3Providing, laying, spreading and compacting brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density 'Grading 3' as per MoRD Technical Specification Clause 405. By Manual Means |
| 11 | Tack coat using hot straight run bitumen of grade VG-30 on W.B.M.Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On WBM @ 0.75 kg/ sqm. |
| 12 | Tack coat using hot straight run bitumen of grade VG-30 on bituminous surfaceProviding and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On bituminous surface @ 0.50 Kg/ Sqm. |
| 13 | 20 mm thick open Graded premix carpet using bituminous (Viscosity grade/ modified bitumen) binder.Providing,laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve a wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat of either Type-A or Type-B or Type-C or Type-D as per MORD technical specification clause 508.Case –II.By Mechnical means.(i) Bitumen (60/70 grade) V.G.-30. |
| 14 | Seal coatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross full using Type-A or Type-B or Type-C or Type-D as per MORD technical specification clause 510.A.By manual means.Case-IV Type –D (Premix with fine sand), Bitumen VG-30 |
| 15 | Maintenance of bituminous surface road using Jhama brick aggregateRepair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with B.M (using jhama brick aggregate & bitumen of VG-30), after applying prime coat at the bottom and tack coat on sides and on bottom (using bitumen emulsion) and compacting, trimming & finishing the surface to form a smooth continuous surface, all as per MoRD technical specification Clauses 1900, 502, 503 and 504. |
| 16 | Repair to potholes and removal of loose materials, trimming of sides, cleaning of surface providing tack coat, 20 mm premix carpet and seal coat Type D (premix with fine sand) as per drawing and MoRD technical specification Cluses 1904.2,503,508.1 |
| 17 | Sand seal coat on old bituminous road surface by applying Viscosity Graded (VG-30) bitumen @ 1.00 kg per sqm using rubber brush after proper cleaning of the road surface and spreading of river sand @0.06 cum/10 sqm complete as per specification and direction of the Engg.-in-Charge. |
| 18 | Excavation for StructuresWithout dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.Ordinary Soil, Upto 3 m depth |
| 19 | Sand FillingFilling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.Sand filling |
| 20 | PCC grade M-10 (1:3:6) with hand mixingProviding concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)PCC grade M 10 (using jhama brick aggregate)Nominal mix 1:3:6 (Hand Mixing) |
| 21 | RCC M-20 in SubstructureProviding concrete for plain/reinforced concrete in substructure complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).R.C.C grade M 20 |
| 22 | TMT bar in Sub-structureSupplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement substructure complete as per drawings & MoRD technical specifications Clauses 1000 & 1202. |
| 23 | Brick work in FoundationBrick masonry work in cement mortar in foundation completed excluding pointing & plastering as per drawing & MoRD technical specifications Clauses 600, 1202 & 1203.Brick masonry in 1:4 cement mortar |
| 24 | 12 mm Plastering in substructurePlastering with cement mortar (1:4) 12 mm thick on brick work/ C.C. work including a finishing coat of neat cement punning with 2.75 kg of cement per sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204. |
| 25 | Backfilling behind abutment, wing wall & return wall complete as per drawings & MoRD technical specification Clause 1204.3.8.I. Sandy material |
| 26 | Providing & laying filter media with jhama brick aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and MoRD technical specification clause 1204.3.8 Please Enable Macros to View BoQ information |