| 1 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 2 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 3 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 4 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 5 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 6 | Drilling hole of various sizes on existing Channel/Cross arm |
| 7 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 8 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 9 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level.The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 10 | Erecting one HT PSC Pole in position incl digging & back filling pit, drawing earth leads etc (without fitting cross arm) |
| 11 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 12 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 13 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16 (Street Light) + 1 x 50 Sq.mm. (Insulated Messenger) |
| 14 | Dismantling of 1.1 kV Aerial bunched cable of size 1 x 25+ 1 x 25 sqmm with bare/insulated Messenger from existing poles |
| 15 | Dismantling of suspension clamp suitable for LT AB cable |
| 16 | Dismantling of Anchor clamp / dead end clamp for LT AB cable |
| 17 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 18 | Erection of suspension clamp for LT ABC of any size |
| 19 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 20 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 21 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 22 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 23 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 24 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 25 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 26 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 27 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 28 | Erection of suspension clamp for 11KV ABC of any size |
| 29 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles |
| 30 | Providing Cable Tie |
| 31 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 33 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 34 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 35 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 36 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 37 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 38 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 39 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 40 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 41 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 42 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 43 | Erecting one HT \\"A\\" type Pole in position incl digging & back filling pit, drawing earth leads etc (without fitting cross arm) |
| 44 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. Please Enable Macros to View BoQ information |