|
| 1 | Dismantling manually including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : for bituminous road |
| 2 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 3 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in - charge. |
| 4 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 5 | Excavation of earth depth upto 1.5 mt. Below G.L. for laying of sewer manholes, Gully pits, Chambers, sumps etc. in ordinary soil(earth,sand loam and clay) joints, pits, trimming, dressing, levelling refilling of trenchesincluding cutting of in 20 cm layers,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches.Excavation in soil mixed with morum,shingle,kankar requaring use of specials T&P. |
| 6 | Excavation in soil mixed with morum, shingle, kankar requaring use of specials T&P. if required |
| 7 | 0 mt to 1.5 mt B.G.L |
| 8 | 1.5 mt to 3.00 mt B.G.L |
| 9 | Disposal of excavated excess earth away from the site including conveyance of material up to an average lead of 8 Km away from the site and corresponding required lift, loading, unloading etc complete as directed by the engineer-in-charge. |
| 10 | Cartage of excavated earth from site to suitable place as per direction of engineer in charge by head load (the work being in narrow lanes) and carrying back for filling of trenchesafter laying and jointing the pipes up.to max distance 60 m one side |
| 11 | Dewatering of water caused due to seepage of ground water and surface water due to rain etc. excluding excavation of foundation but during execution of civil works including supply of all machine operator, khalashi, POL, T&P, accessories required for proper completion of the work. |
| 12 | Provide & fixing of Open Timbering (covering1/3rd of surface area by planks), in trenches for the following depths below ground level consisting of 40mm thick approved country wood planks for poling board, 125mm × 75mm Indian Salwood walers and 100 mm dia Sal wood ballies for struts at 1.50m interval including removal after laying of sewer(both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor. |
| 13 | a) 0.0 - 3.0 mtr B.G.L. |
| 14 | Providing granular bedding with cerefully compacted backfill at all level using graded hard crusher broken stone100% passing through 20mm sieve , 20-50% passing through 10mm sieve and 100% retained on 6mm sieve, laying in layers of not more then 15 cm thick including ramming, watering, compaction etc. complete for pipe bedding and surrounding as per drawing and as directed by the Engineer-in-Charge. Width of bedding ( Outer diameter of pipe + 200mm ) |
| 15 | Providing plain cement concrete bedding with 1:2:4 (M-15 grade ) with carefully compacted backfill using 20mm and down hard crusher broken stone laying in layers of not more than 15 cm thick including shuttering, compaction, curing, etc., complete for PCC bedding and surrounding as per drawing and as directed by the Engineer-in-Charge. Width of bedding ( Outer diameter of pipe + 200mm or 1.25 times of outer diameter , whichever is more ) |
| 16 | Supply laying and jointing of following dia. R.C.C. NP-3 class (with spigot & Socket (S/S) ends) as per IS: 458-2003 {Amended up to date) with Rubber gaskets at site of work, lowering the same into trenches in depths up to required depth below ground level true to alignment as per drawings and jointing with 1:1 cement mortar in coarse sand including cost of all jointing materials, testing etc. complete as per specifications and as directed by the Engineer-in-Charge.( Pipes of dia 300mm and above have to be NP-3 reinforced made by vertical vibrated casting process with S/S ends conforming to IS 458 : 2003. |
| 17 | 200 mm dia |
| 18 | 0 - 1.5 m depth |
| 19 | 1.5 - 3 m depth |
| 20 | 250 mm dia |
| 21 | 1.5 - 3 m depth |
| 22 | Supply, Carting to the site of work of D.I. K-7 S&S pipe 'LA tyton joint' lowering them into trenches and laying true to alignment and gradient including testing of pipe line but excluding cost of trench for sewer works. |
| 23 | 250 mm dia |
| 24 | 1.5 - 3 m depth |
| 25 | Supply of all material, labour and T&P to provide the barricading along trench during excavation and laying of pipe with eucalyptus ballies of 100mm dia in horizontal section in two rows and vertical post of 125 mm dia at 2 m C/C fastened with Nariyal rope including provision of caution board. |
| 26 | Provision for diversion and reparing of electric/telephone cables/wires wherever necessary including supply of all materials, labour, T&P etc. complete. |
| 27 | Shifting and repairing of telephone cables. |
| 28 | Shifting and repairing to electric poles |
| 29 | Provision for crossing sewers through existing drains coming across the alignment of sewer including making it good after laying the pipe. |
| 30 | Shifting of domestic water supply house connection coming in the alignment of sewer line/mahnole chamber including excavation, refilling, supply of all material, pipes, specials etc., labour, T&P and making good complete as per entire satisfaction of engineer in charge. |
| 31 | 15 to 20mm G.I, Pipe |
| 32 | 25 to 32mm G.I. Pipe |
| 33 | 65 mm PVC Pipe |
| 34 | 110 mm PVC Pipe |
| 35 | providing and laying in position cement concrete specified grade |
| 36 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 37 | 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 38 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 39 | Laying old cement cocrete interlocking paver blocks of any design/shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer in-charge. (Old CC paver blocks shall be supplied by the department free of cost). |
| 40 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification |
| 41 | Constructing Brick Masonry Manhole of various dia and depth as per IS :4111 par1( latest ammendment) in FPS brick class designation M-100 in Cement Mortar 1:5 (1 cement : 5 coarse sand) including nside and outside 15mm thick plastering in cement mortar 1:3(1 cement : 3 coarse sand) finished with a floating coat of neat cement inside only. The work includes excavation, dewatering, planking, strutting, foot step (As per latest IS Code 10910) (Pattern-2 Heavy), manhole cover frame (Heavy duty EHD35), etc. refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 1 coarse sand : 4 stone aggregate 40mm nominal size), preparation of channal up to the height of'the'pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size) including neat cement finished, suitable connection of inlet & outlet pipes, testing (watertightness} of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction of Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover). |
| 42 | 900mm internal diameter at bottom,0.90-1.65m depths |
| 43 | 1200 mm internal diameter at bottom ,1.65-2.30m depths |
| 44 | 1500 mm internal diameter at bottom ,2.30m-4.95 m depths |
| 45 | Supply of all materials and constructing Reinforced cement concrete manhole in M30 cement concrete . The work includes excavation , dewatering , planking , strutting etc , refilling , disposal of surplus earthn with all lift and lead of 50 m including construction of concrete base with PCC 1:3:6 ( 1 cement , 3 coarse sand , 6 stone aggregate 40 mm nominal size), preparation of channel upto the height of pipe and benching in PCC 1:2:4 ( 1 cement , 2 coarse sand and 4 stone aggregate ) including neat cement finished , suitable connectioin of inlet and oulet pipes , testing ( water tightness) of manhole , curing , manhole frame and cover etc . complete as oer specification and drawing complete with respect all and as per Engineer-in-charghe ( depth of manhole will be measured from invert of the pipe to top of manhole cover) |
| 46 | 1500 mm dia,2.30m-4.95 m depths |
| 47 | Constructing Brick Masonry sewer connecting chamber (SCC) of various sizes and depth as per drawing in FPS brick class designation M-100 in.,Cement Mortar 1:5 (1 cement : 5 coarse sand) including inside and outside 15mm thick plastering in cement mortar 1:3 (1 cement : 3 coarse sand)finished with a floating with a neat cement inside only. The work includes excavation, dewatering, planking, strutting, foot steps, manhole cover frame etc, refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 4 coarse sand : 8 stone aggregate 40mm nominal size), preparation of channal up to the height of the pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size including neat cement finished, suitable connection of inlet & outlet pipes with RCC NP-3 pipe 150 mm dia, testing water tightness of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction ol Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover).inclung RCC 150 mm dia pipe(SCC TO MH) |
| 48 | 60mm x 60mm x 1.5m depth |
| 49 | Making Connection of new sewer line to existing manhole including necessary dewatering for connection, making holes in manhole wall and repairing same after connection, making cunet for connected sewer line if required, disposal of rubbish including all material and labour, T&P etc. complete |
| 50 | Construction of following house connection chamber in frunt of house boundary wall, Supply & laying of PVC 110 mm dia Pipe 6 Kg Pressure, from manhole to connecting chamber and supply & fixing of manhole cover frame, including making of chamber all material labour T&P etc complete in all respect as per direction of Engineer in charge. |
| 51 | 45mm x 45mm x 0.6 m depth |
| 52 | 30mm x 30mm x 0.45 m depth |
| 53 | Providing and Spreading RBM i.e.,River Bed Material (treated /surface course material )in uniform layer with motor grader on prepared surace with rotavator and compacting with smooth wheeled roller to achieve the desired density. |
| 54 | WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. |
| 55 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 56 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 57 | Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction)for GradingII (19 mm nominal size) |
| 58 | Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification complete in all respects)for GradingII (10 mm nominal size) |
| 59 | Deduction in the depth of the Brick manhole to regulate payments for variation of actual depth of manholes in following sizes. |
| 60 | 900mm dia ,0.90-1.65m depths |
| 61 | 1200 mm dia ,1.65-2.30m depths |
| 62 | 1500 mm dia,2.30m-4.95 m depths |
| 63 | Deduction in the depth of the RCC manhole to regulate payments for variation of actual depth of manholes in following sizes. |
| 64 | 1500 mm dia,2.30m-4.95 m depths |
| 65 | Deduction in the depth of the Sewer connecting chamber to regulate payments for variation of actual depth of manholes in following sizes. |
| 66 | 600mm x 600mm x 1.5m depth Please Enable Macros to View BoQ information |