| 1 | A. Drilling Portion |
| 2 | Drilling in all kinds of soil and rural area for installation of India mark II hand pump with D.T.H. rig all complete , including supplying all materials , tools , drilling rig , air compressor and equipment as well as fuel , lubricants for making 125 mm / 115 mm dia boring and cost of transporting charge of rig machine and other vehicle up to site of the work as |
| 3 | (a) Up to 30 mtr. Depth bellow G.L. |
| 4 | (b) Beyond 30 mtr.Up to 70 mtr. |
| 5 | Supplying all materials , labours , equipments for lowering 125 mm dia PVC pipes as casing for protecting the sites from falling during the process of drilling all complete including carriage of work. |
| 6 | Supplying labour ,cement and chloride or bentonite solution and equipments for grouting to casing pipe after lowering in the bore etc . complete as per specification and direction of E/I |
| 7 | Supplying all tools , equipments and labours and washing flushing and developments of drilled tube well to give clean and clear water all complete as per direction of E/I |
| 8 | Supplying, labours and equipments including 125 mm dia G.I. cap and fitting and fixing over the tube well properly and taking it out as per direction of E/I ( The cap will be property of contractor . |
| 9 | B. CIVIL PORTION |
| 10 | Supplying all tools , equipments and labours and lowering 32 mm dia G.I. suspension pipe in 3 mtr. Length in the drilling bore of tube well etc. all complete job as per direction of E/I |
| 11 | Providing labour for fitting and fixing deep well cylinder jointing materials , chrome leather bucket all tools and plan etc. required for the job for low water level all complete job as per specification and direction of E/I . |
| 12 | Supplying all materials , labours and equipments and fitting fixing the hand pump I.M. II with all accessories including carriage to work site as per direction of E/I |
| 13 | Supplying all materials , labours and equipments for construction 185 cm dia P.C.C. (1:2:4)circular platform around the drilled tube well including 12.m.m .Thick cement plaster(1.4)with neat cement punning over exposed surface as per UNICEF design etc .all complete as per direction of E/I . |
| 14 | Supplying all materials, labours and equipments for constructing PCC ( 1:2:4) drain as per UNICEF design etc . All complete. |
| 15 | Supplying all materials, labours and equipments for dismantling P.C.C (1:2:4) circular plateform and taking out I.M.II hand pump and its pipe including cost of carrage of materials from site to store |
| 16 | Add Extra Item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I |
| 17 | C. COST OF MATERIALS |
| 18 | (a).cost of one no. of ISI marked India mark II hand pump confirming to IS.9301/90 with amendment.NO.1 to 6 complete with all accessories including cylinder assembly and 8 nos. of connecting rod |
| 19 | (b) cost of 32 mm dia G.I pipe 3mtrs long screwed at both ends with seamless Socket as per IS:1239(Part 1990) |
| 20 | Cost of (125mm dia 140 mm O.D.) blue UPVC casing pipe |
| 21 | GST @18% |
| 22 | Labour Cess @1% Please Enable Macros to View BoQ information |