| 1 | Bottom boot cover opening and boxing up | Bottom boot cover opening and boxing up |
| 2 | Inspection windows opening & boxing up | Inspection windows opening & boxing up |
| 3 | Shear pin replacement | Shear pin replacement |
| 4 | Multi-disc/Resilient plate of Fluid coupling replacement | Multi-disc/Resilient plate of Fluid coupling replacement |
| 5 | Replacement of bottom sprocket sealing arrangement(both sides) | Replacement of bottom sprocket sealing arrangement(both sides) |
| 6 | Replacement of backstop lever with pin | Replacement of backstop lever with pin |
| 7 | Replacement / Chain shortening of Drive chain | Replacement / Chain shortening of Drive chain |
| 8 | Replacement of drive/driven sprocket | Replacement of drive/driven sprocket |
| 9 | Replacement of Pulley bearing assembly | Replacement of Pulley bearing assembly |
| 10 | Greasing of Pulley bearing (02 nos.) | Greasing of Pulley bearing (02 nos.) |
| 11 | Replacement / Inspection of Grid member of coupling | Replacement / Inspection of Grid member of coupling |
| 12 | Replacement of coupling & alignment | Replacement of coupling & alignment |
| 13 | Replacement of Tie-rods (02 nos.) of Tail end pulley | Replacement of Tie-rods (02 nos.) of Tail end pulley |
| 14 | Replacement of Belt scrapper | Replacement of Belt scrapper |
| 15 | Removal of Belt off-centre | Removal of Belt off-centre |
| 16 | Replacement of nozzle cup/Spray gun assembly | Replacement of nozzle cup/Spray gun assembly |
| 17 | Replacement/ tightening of pulley ‘ V ‘ Belt | Replacement/ tightening of pulley ‘ V ‘ Belt |
| 18 | Gearbox Pulley replacement | Gearbox Pulley replacement |
| 19 | Replacement of Girth gear bolts | Replacement of Girth gear bolts |
| 20 | Gearbox bearing inspection | Gearbox bearing inspection |
| 21 | Replacement/ tightening of gearbox & motor foundation bolts | Replacement/ tightening of gearbox & motor foundation bolts |
| 22 | Replacement / Inspection of grid member of coupling of gearbox | Replacement / Inspection of grid member of coupling of gearbox |
| 23 | Bearing inspection/ greasing of Plummer blocks of trunnion roller | Bearing inspection/ greasing of Plummer blocks of trunnion roller |
| 24 | Replacement / Inspection of grid member of coupling | Replacement / Inspection of grid member of coupling |
| 25 | Replacement of coupling & alignment | Replacement of coupling & alignment |
| 26 | Alignment of motor & gearbox | Alignment of motor & gearbox |
| 27 | Replacement of Girth gear bolts | Replacement of Girth gear bolts |
| 28 | Replacement/ tightening of gearbox & motor foundation bolts | Replacement/ tightening of gearbox & motor foundation bolts |
| 29 | Gearbox bearing inspection | Gearbox bearing inspection |
| 30 | Bearing inspection/ greasing of Plummer blocks of trunion roller | Bearing inspection/ greasing of Plummer blocks of trunion roller |
| 31 | Replacement of outlet valves Size : 6’’/5” | Replacement of outlet valves Size : 6’’/5” |
| 32 | Replacement of outlet valves Size : 4” | Replacement of outlet valves Size : 4” |
| 33 | Replacement of ‘ V ‘ belts of DC-205/206 tanks | Replacement of ‘ V ‘ belts of DC-205/206 tanks |
| 34 | Strainer opening & box up of DC-205/206 tanks | Strainer opening & box up of DC-205/206 tanks |
| 35 | Replacement/ tightening of Foundation bolts of gearbox | Replacement/ tightening of Foundation bolts of gearbox |
| 36 | Replacement/ tightening of Coupling bolts | Replacement/ tightening of Coupling bolts |
| 37 | Replacement of Lovejoy coupling pads of GD-211/214 | Replacement of Lovejoy coupling pads of GD-211/214 |
| 38 | Replacement of Lovejoy coupling pads of GD-212/213 | Replacement of Lovejoy coupling pads of GD-212/213 |
| 39 | Replacement/ tightening of intermediate flange bolts of GD-211/214 | Replacement/ tightening of intermediate flange bolts of GD-211/214 |
| 40 | Replacement / Inspection of Grid member of coupling | Replacement / Inspection of Grid member of coupling |
| 41 | Alignment of motor & rotor | Alignment of motor & rotor |
| 42 | Inspection windows opening & boxing up | Inspection windows opening & boxing up |
| 43 | Suction/Discharge damper servicing in position | Suction/Discharge damper servicing in position |
| 44 | Bearing inspection (02 nos.) / clearance checking | Bearing inspection (02 nos.) / clearance checking |
| 45 | Insitu Balancing of rotor assembly (with PHS dept.) | Insitu Balancing of rotor assembly (with PHS dept.) |
| 46 | Foundation bolts tightening | Foundation bolts tightening |
| 47 | Descaling rotor of fume exhauster | Descaling rotor of fume exhauster |
| 48 | Replacement / Inspection of Grid member of coupling | Replacement / Inspection of Grid member of coupling |
| 49 | Replacement of coupling & alignment | Replacement of coupling & alignment |
| 50 | Alignment of motor & rotor | Alignment of motor & rotor |
| 51 | Inspection windows opening & boxing up | Inspection windows opening & boxing up |
| 52 | Insitu Balancing of rotor assembly (with PHS dept.) | Insitu Balancing of rotor assembly (with PHS dept.) |
| 53 | Foundation bolts tightening | Foundation bolts tightening |
| 54 | Replacement / Inspection of Grid member of coupling | Replacement / Inspection of Grid member of coupling |
| 55 | Replacement of coupling & alignment | Replacement of coupling & alignment |
| 56 | Two dial alignment of pump | Two dial alignment of pump |
| 57 | Replacement of discharge ‘ NRV ‘ 8/6/10 ‘’ | Replacement of discharge ‘ NRV ‘ 8/6/10 ‘’ |
| 58 | Replacement of Butterfly Valve Size : 10” | Replacement of Butterfly Valve Size : 10” |
| 59 | Replacement of Butterfly valve Size : 8 “ | Replacement of Butterfly valve Size : 8 “ |
| 60 | Replacement of Butterfly Valve Size : 6” | Replacement of Butterfly Valve Size : 6” |
| 61 | 3”/4” Slurry line flanges opening & box-up for cleaning job | 3”/4” Slurry line flanges opening & box-up for cleaning job |
| 62 | Replacement/Repair of vibrator assembly complete | Replacement/Repair of vibrator assembly complete |
| 63 | Replacement of Bottom stand post | Replacement of Bottom stand post |
| 64 | Replacement/tightening of stand post bolts | Replacement/tightening of stand post bolts |
| 65 | Replacement of tie-rod with bush | Replacement of tie-rod with bush |
| 66 | Replacement of ‘ V ‘ Belt CPT 1/2 | Replacement of ‘ V ‘ Belt CPT 1/2 |
| 67 | Replacement of ‘ V ‘ Belt CPT 5/6 | Replacement of ‘ V ‘ Belt CPT 5/6 |
| 68 | Replacement of After-cooler / Intercooler | Replacement of After-cooler / Intercooler |
| 69 | Repairing / Hydro-testing of After-cooler / Intercooler | Repairing / Hydro-testing of After-cooler / Intercooler |
| 70 | Replacement of Rubber flapper | Replacement of Rubber flapper |
| 71 | Fabrication/ replacement of Cyclone bottom cone with rubber flapper | Fabrication/ replacement of Cyclone bottom cone with rubber flapper |
| 72 | Replacement of Cyclone chain | Replacement of Cyclone chain |