| 1 | Dismentling of old damaged mastic asphalt flooring,including brick on edge flooring and also including disposal of refuse as directed by the E/I within a distance 500 mtr from the site,makinng the surface good by brooming or brushing etc. |
| 2 | Scraping of old painted surface/ white of colour washing and sand papering and preparing surface smooth including necessary repairing of scratches etc. complete, disposal of refuse as directed by E/I within a distance of 60m complete. |
| 3 | Repair to plaster with cement mortar 1:4 (1 cement : 4 fine sand)of thickness 12 mm to 20 mm in pathes of area 2.5 sqm. and under or as required as per site ,including cutting the patch in proper shape,raking out joints and preparing and plastering the surface of the wall complete,including disposal of rubbish to the dumping ground,zll complete as per direction of Engineer - in- charge.( For all heights) |
| 4 | Supply & laying 500micron HDPE sheet under floor,including supply of all materials,over lapping etc,waistage,labour, etc.Required of completion of the work. |
| 5 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:3:6 (1 cement : 3 coarse sand (zone- III) derived from natural sourtces : 6 graded stone aggregate 40mm nominal size derived from natural sources all work up to plinth level, complete. |
| 6 | Providing & laying Cement Concrete pavment of mix M-25 with ready mixed concrete from batching plant in pannels. The ready mixed concrete shall be laid and finished with screed board vibrator, vaccum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in charge (The panel shuttering work shall be paid for separately)(Note: Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). |
| 7 | White washing two coat on old work including supply of all materials, labour, tools & plants etc. required for proper completion of the work. |
| 8 | Steel Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and biding all complete in foundation and upto full height complete (Thermo Mechanically treated bars of grade Fe500/Fe-500D or more. |
| 9 | Centering and shuttering including strutting, proping etc and removal of form work for foundations, footings, bases of columns, Etc. |
| 10 | General repairing,oiling,greasing painting etc. Of all three shutters of godown complete in all respect. Please Enable Macros to View BoQ information |