| 1 | Erection of two nos D+18 Type Double Circuit Towers for 33 KV crossing across Bheeni River in respect of Sub Transmission Division Kathua at Billawer |
| 2 | SITC of Material for erection of 02 Nos.Double Circuit D+18 type towers |
| 3 | SITC of Superstructure |
| 4 | SITC of Stubs |
| 5 | SITC of Tower Accessories |
| 6 | SITC of Danger Plates 1 No Per Tower |
| 7 | SITC of Phase Plates 3 No Per Tower for S/C |
| 8 | SITC of Number Plates 1 No Per Tower |
| 9 | Anti Climbing Devices 1 No Per Tower |
| 10 | SITC of Earthing of Towers |
| 11 | PlateType Hot dipped galvanized 600mmx600mmx6mmthick plate welded with GI Strips for earthing of size 50mmX6mm for connection of VCB Panel as per IS2629/85, GI Nuts and bolts,refilled with good earth, charcoal dust, salt, etc inside the Pit as per the direction of site engineer, enhancement material and earth chamber made of brick masonar with RCC slab coverwith 8.36 cum earth work |
| 12 | Counter Poise with 43.2 cum earth work |
| 13 | Welding of Nut & bolts upto first two storeys |
| 14 | SITC of 200 mm² ACSR Conductor, for 3-spans including one across the river(Double Circuit) and 02 adjacent spans(Single Circuit) on both sides of towers (a) Aluminum=30/3 mm(b) Steel=7/3 mm Overall dia 21mm.Approximate Wt 976Kg/Km Ultimate breaking Load=89.67 KN;including 1.5%sag and jumpering and Anchoring of towers including dismantling arrangments etc. |
| 15 | SITC of Conductor Accessories including their loading / unloading and carriage ,loading/unloading of stringing equipment like compressor, turn table ,four sheeve pulleys,rollers etc |
| 16 | Mid Span Joints |
| 17 | Vibration Dampers 2 No/Phase/Tower |
| 18 | Compression type Repair Sleeves For Conductor 9 No / Km for D/C |
| 19 | Aluminium Tape 1 No Per Km Of Line |
| 20 | Fixing of bird guard |
| 21 | Erection of anticlimbing devices |
| 22 | Route clearance/jungle clearance/branch cutting of 50% of area falling under conductors of double |
| 23 | SITC of Earth Wire Accessoreis |
| 24 | 7/3.25 mm GS Earth wire |
| 25 | Mid Span Joints 2No/Km |
| 26 | Vibration Dampers 2 No / Tower |
| 27 | Suspension Clamps S/C |
| 28 | Tension Clamps S/C |
| 29 | SITC of Insulators, their loading / unloading , carriage and stacking etc |
| 30 | Disc Insulators 120 KN/90 KN Porcelain type, Ball & Socket type, 145mm height and 280mm dia. Creepage total 430 mm and 260 mm protected. |
| 31 | SITC of Hardware fittings for conductor,their loading / unloading , carriage and stacking etc |
| 32 | Single Suspension Fittings for panther shall have minimum failing load of 50% ultimate strength of bundle conductors with Forged Steel Hanger free center type without bolt only having slipping strength 15% of ultimate strength of conductor.The ball and socket designation must be 16 mm |
| 33 | Single Tension Fittings for panther shall have minimum failing load of 100% ultimate strength of Bundle cnductors with compressive type Tension clamps having slipping strength 95% of ultimate Strength of conductors. The ball and socket designation must be 20mm. |
| 34 | Double Tension Fittings |
| 35 | Double Suspension Fittings |
| 36 | Misc. items |
| 37 | Tag welding of towers |
| 38 | Spares i.e disc fittings,disc insulators and allied accessories |
| 39 | SITC of Foundations & Stub Settings of D+18 type Towers |
| 40 | Excavation of foundation pits |
| 41 | 30% dense/hard/muddy soil |
| 42 | 70% in disinteg. or soft rock |
| 43 | Disposal of excavated soil within 25 mtrs |
| 44 | Bending, fixing and binding of reinforce. |
| 45 | Concreting of tower foundation. |
| 46 | Stub setting of tower foundations |
| 47 | Form work of steel shuttering. |
| 48 | Coping & curring of tower foundations |
| 49 | Laying of dry stone solling. |
| 50 | Back filling |
| 51 | Manaul carriage of constructional material at an average of 1.0 Km. |
| 52 | Sand (0.45 of concrete vol.)+5% wastage for plain and 10% for hilly & semi hilly terrains |
| 53 | Bajree (0.90 of concrete vol)+5% wastage for plain and 10% for hilly & semi hilly terrains |
| 54 | Good earth 1.00 km lead |
| 55 | Cement (average lead 1.0 km) |
| 56 | Form boxes |
| 57 | T&P accessories |
| 58 | Steel for reinforcement |
| 59 | Cost of constructional material |
| 60 | Cement |
| 61 | Reinfrocement steel |
| 62 | Bajree |
| 63 | Good earth |
| 64 | SITC CONSTRUCTION OF STONE MASONRY PROTECTION WALL AROUND TRANSMISSION LINE TOWER FOUNDATIONS |
| 65 | Earth work in bulk exacavation by manual means over areas incl. disposal of excavated earth lead up to 50 m and lift up to 1.5 m |
| 66 | Providing & laying in position cement concrete . All work upto plinth level in 1:4:8 aggregate 40mm nominal size (curshed stone) (Mud Mat) |
| 67 | Random Rubble masonary with hard stone from quarry in foundation & plinth( 1 cement : 6 coarse Sand :12 grade stone aggreage 20 mm nominal size ) at plinth level. |
| 68 | Providing & laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement :2 course sand :4 graded stone aggregate 20mm niminal size (crushed) |
| 69 | Earth filling in plinth, sides of foundations etc.in layers not exceeding 20cm in depth consolidating each disposed layer by ramming and watering |
| 70 | Carriage of materials by Mechnical Transport average lead 20KM |
| 71 | Stone |
| 72 | Aggregates 40mm size |
| 73 | Aggregate 20mm size |
| 74 | Earth |
| 75 | Cement |
| 76 | Carriage of materials by head load from unloading site average lead 1.50 KM |
| 77 | Stone |
| 78 | Aggregates 40mm size |
| 79 | Aggregate 20mm size |
| 80 | Earth |
| 81 | Cement |
| 82 | Supply, Installation, Testing & Commissioning of 4 Pole Structure on 16 Meters ST Poles including erection of ST Poles, Cement Bottoming, Fabrication and fixing of G.I Channel, Angle and Flat of required sizes, Painting of the poles and other associated material with Red Oxide and Aluminium Paint, Earthing of the 4-Pole Structure , Fixing of Danger Plates, Anti climbing Devices, Galvanised Stay Set and all other associated works like fixing of suspension/tension fitting strings, stringing of conductor including cost of conductor etc , Complete Job in all respects, as per the directions of the site engineer and as per site requirements. |
| 83 | Survey & check survey including soil investigation, soil classification, profiling tower spotting data, tower type, tower foundation, tower protection wall and etc |
| 84 | Erection of two nos D+18 Type Double Circuit Towers for 33 KV crossing across Ujh River in respect of Sub Transmission Division Kathua at Billawer |
| 85 | SITC of Material for erection of 02 Nos. Double Circuit D+18 type towers |
| 86 | SITC of Superstructure |
| 87 | SITC of Stubs |
| 88 | SITC of Tower Accessories |
| 89 | SITC of Danger Plates 1 No Per Tower |
| 90 | SITC of Phase Plates 3 No Per Tower for S/C |
| 91 | SITC of Number Plates 1 No Per Tower |
| 92 | Anti Climbing Devices 1 No Per Tower |
| 93 | SITC of Earthing of Towers |
| 94 | PlateType Hot dipped galvanized 600mmx600mmx6mmthick plate welded with GI Strips for earthing of size 50mmX6mm for connection of VCB Panel as per IS2629/85, GI Nuts and bolts,refilled with good earth, charcoal dust, salt, etc inside the Pit as per the direction of site engineer, enhancement material and earth chamber made of brick masonar with RCC slab coverwith 8.36 cum earth work |
| 95 | Counter Poise with 43.2 cum earth work |
| 96 | Welding of Nut & bolts upto first two stories |
| 97 | SITC of 200 mm² ACSR Conductor, for 3-spans including one across the river(Double Circuit) and 02 adjacent spans(Single Circuit) on both sides of towers (a) Aluminum=30/3 mm(b) Steel=7/3 mm Overall dia 21mm.Approximate Wt 976Kg/Km Ultimate breaking Load=89.67 KN;including 1.5%sag and jumpering and Anchoring of towers including dismantling arrangments etc. |
| 98 | SITC of Conductor Accessories including their loading / unloading and carriage ,loading/unloading of stringing equipment like compressor, turn table ,four sheeve pulleys,rollers etc |
| 99 | Mid Span Joints |
| 100 | Vibration Dampers 2 No/Phase/Tower |
| 101 | Compression type Repair Sleeves For Conductor 9 No / Km for D/C |
| 102 | Aluminium Tape 1 No Per Km Of Line |
| 103 | Fixing of bird guard |
| 104 | Erection of anticlimbing devices |
| 105 | Route clearance/jungle clearance/branch cutting of 50% of area falling under conductors of double |
| 106 | SITC of Earth Wire Accessoreis |
| 107 | 7/3.25 mm GS Earth wire |
| 108 | Mid Span Joints 2No/Km |
| 109 | Vibration Dampers 2 No / Tower |
| 110 | Suspension Clamps S/C |
| 111 | Tension Clamps S/C |
| 112 | SITC of Insulators, their loading / unloading , carriage and stacking etc |
| 113 | ii.Disc Insulators 120 KN/90 KN Porcelain type, Ball & Socket type, 145mm height and 280mm dia. Creepage total 430 mm and 260 mm protected. |
| 114 | SITC of Hardware fittings for conductor,their loading / unloading , carriage and stacking etc |
| 115 | Single Suspension Fittings for panther shall have minimum failing load of 50% ultimate strength of bundle conductors with Forged Steel Hanger free center type without bolt only having slipping strength 15% of ultimate strength of conductor.The ball and socket designation must be 16 mm. |
| 116 | Single Tension Fittings for panther shall have minimum failing load of 100% ultimate strength of Bundle cnductors with compressive type Tension clamps having slipping strength 95% of ultimate Strength of conductors. The ball and socket designation must be 20mm. |
| 117 | Double Tension Fittings |
| 118 | Double Suspension Fittings |
| 119 | Misc. items |
| 120 | Tag welding of towers |
| 121 | Spares i.e disc fittings,disc insulators and allied accessories |
| 122 | SITC of Foundations & Stub Settings of D+18 Type Towers |
| 123 | Excavation of foundation pits |
| 124 | 30% dense/hard/muddy soil |
| 125 | 70% in disinteg. or soft rock |
| 126 | Disposal of excavated soil within 25 mtrs |
| 127 | Bending, fixing and binding of reinforce. |
| 128 | Concreting of tower foundation. |
| 129 | Stub setting of tower foundations |
| 130 | Form work of steel shuttering. |
| 131 | Coping & curring of tower foundations |
| 132 | Laying of dry stone solling. |
| 133 | Back filling |
| 134 | Manaul carriage of constructional material at an average of 1.0 Km. |
| 135 | Sand (0.45 of concrete vol.)+5% wastage for plain and 10% for hilly & semi hilly terrains |
| 136 | Bajree (0.90 of concrete vol)+5% wastage for plain and 10% for hilly & semi hilly terrains |
| 137 | Good earth 1.00 km lead |
| 138 | Cement (average lead 1.0 km) |
| 139 | Form boxes |
| 140 | T&P accessories |
| 141 | Steel for reinforcement |
| 142 | Cost of constructional material |
| 143 | Cement |
| 144 | Reinfrocement steel |
| 145 | Bajree |
| 146 | Good earth |
| 147 | SITC CONSTRUCTION OF STONE MASONRY PROTECTION WALL AROUND TRANSMISSION LINE TOWER FOUNDATIONS |
| 148 | Earth work in bulk exacavation by manual means over areas incl. disposal of excavated earth lead up to 50 m and lift up to 1.5 m |
| 149 | Providing & laying in position cement concrete . All work upto plinth level in 1:4:8 aggregate 40mm nominal size (curshed stone) (Mud Mat) |
| 150 | Random Rubble masonary with hard stone from quarry in foundation & plinth( 1 cement : 6 coarse Sand :12 grade stone aggreage 20 mm nominal size ) at plinth level. |
| 151 | Providing & laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement :2 course sand :4 graded stone aggregate 20mm niminal size (crushed) |
| 152 | Earth filling in plinth, sides of foundations etc.in layers not exceeding 20cm in depth consolidating each disposed layer by ramming and watering |
| 153 | Carriage of materials by Mechnical Transport average lead 20KM |
| 154 | Stone |
| 155 | Aggregates 40mm size |
| 156 | Aggregate 20mm size |
| 157 | Earth |
| 158 | Cement |
| 159 | Carriage of materials by head load from unloading site average lead 1.50 KM |
| 160 | Stone |
| 161 | Aggregates 40mm size |
| 162 | Aggregate 20mm size |
| 163 | Earth |
| 164 | Cement |
| 165 | Supply, Installation, Testing & Commissioning of 4 Pole Structure on 16 Meters ST Poles including erection of ST Poles, Cement Bottoming, Fabrication and fixing of G.I Channel, Angle and Flat of required sizes, Painting of the poles and other associated material with Red Oxide and Aluminium Paint, Earthing of the 4-Pole Structure , Fixing of Danger Plates, Anti climbing Devices, Galvanised Stay Set and all other associated works like fixing of suspension/tension fitting strings, stringing of conductor including cost of conductor etc , Complete Job in all respects, as per the directions of the site engineer and as per site requirements. |
| 166 | Survey & check survey including soil investigation, soil classification, profiling tower spotting data,tower type, tower foundation, tower protection wall and etc |
| 167 | Erection of one no B+6 Type Double Circuit Tower for 66 KV crossing across Sahar Khad in respect of Sub Transmission Division Kathua near Kalibari Kathua |
| 168 | SITC of Material for erection of 01 No. Double Circuit B+6 type tower |
| 169 | SITC of Superstructure |
| 170 | SITC of Stubs |
| 171 | SITC of Tower Accessories |
| 172 | SITC of Danger Plates 1 No Per Tower |
| 173 | SITC of Phase Plates 3 No Per Tower for S/C |
| 174 | SITC of Number Plates 1 No Per Tower |
| 175 | Anti Climbing Devices 1 No Per Tower |
| 176 | SITC of Earthing of Towers |
| 177 | PlateType Hot dipped galvanized 600mmx600mmx6mmthick plate welded with GI Strips for earthing of size 50mmX6mm for connection of VCB Panel as per IS2629/85, GI Nuts and bolts,refilled with good earth, charcoal dust, salt, etc inside the Pit as per the direction of site engineer, enhancement material and earth chamber made of brick masonar with RCC slab coverwith 8.36 cum earth work |
| 178 | Counter Poise with 43.2 cum earth work |
| 179 | Welding of Nut & bolts upto first two stories |
| 180 | SITC of 100 mm² ACSR Conductor, for 2-spans including one across the river(Single Circuit) and other one (Single Circuit) on another direction of proposed tower |
| 181 | SITC of Conductor Accessories including their loading / unloading and carriage ,loading/unloading of stringing equipment like compressor, turn table ,four sheeve pulleys,rollers etc |
| 182 | Mid Span Joints |
| 183 | Vibration Dampers 2 No/Phase/Tower |
| 184 | Compression type Repair Sleeves For Conductor 9 No / Km for D/C |
| 185 | Aluminium Tape 1 No Per Km Of Line |
| 186 | Fixing of bird guard |
| 187 | Erection of anticlimbing devices |
| 188 | Route clearance/jungle clearance/branch cutting of 50% of area falling under conductors of double |
| 189 | SITC of Earth Wire Accessoreis |
| 190 | 7/3.25 mm GS Earth wire |
| 191 | Mid Span Joints 2No/Km |
| 192 | Vibration Dampers 2 No / Tower |
| 193 | Suspension Clamps S/C |
| 194 | Tension Clamps S/C |
| 195 | SITC of Insulators, their loading / unloading , carriage and stacking etc |
| 196 | ii.Disc Insulators 120 KN/90 KN Porcelain type, Ball & Socket type, 145mm height and 280mm dia. Creepage total 430 mm and 260 mm protected. |
| 197 | SITC of Hardware fittings for conductor,their loading / unloading , carriage and stacking etc |
| 198 | Single Suspension Fittings for panther shall have minimum failing load of 50% ultimate strength of bundle conductors with Forged Steel Hanger free center type without bolt only having slipping strength 15% of ultimate strength of conductor.The ball and socket designation must be 16 mm. |
| 199 | Single Tension Fittings for panther shall have minimum failing load of 100% ultimate strength of Bundle cnductors with compressive type Tension clamps having slipping strength 95% of ultimate Strength of conductors. The ball and socket designation must be 20mm. |
| 200 | Double Tension Fittings |
| 201 | Double Suspension Fittings |
| 202 | Misc. items |
| 203 | Tag welding of towers |
| 204 | Spares i.e disc fittings,disc insulators and allied accessories |
| 205 | SITC of Foundations & Stub Setting of B+6 type Tower |
| 206 | Excavation of foundation pits |
| 207 | 30% dense/hard/muddy soil |
| 208 | 70% in disinteg. or soft rock |
| 209 | Disposal of excavated soil within 25 mtrs |
| 210 | Bending, fixing and binding of reinforce. |
| 211 | Concreting of tower foundation. |
| 212 | Stub setting of tower foundations |
| 213 | Form work of steel shuttering. |
| 214 | Coping & curring of tower foundations |
| 215 | Laying of dry stone solling. |
| 216 | Back filling |
| 217 | Manaul carriage of constructional material at an average of 1.0 Km. |
| 218 | Sand (0.45 of concrete vol.)+5% wastage for plain and 10% for hilly & semi hilly terrains |
| 219 | Bajree (0.90 of concrete vol)+5% wastage for plain and 10% for hilly & semi hilly terrains |
| 220 | Good earth 1.00 km lead |
| 221 | Cement (average lead 1.0 km) |
| 222 | Form boxes |
| 223 | T&P accessories |
| 224 | Steel for reinforcement |
| 225 | Cost of constructional material |
| 226 | Cement |
| 227 | Reinfrocement steel |
| 228 | Bajree |
| 229 | Good earth |
| 230 | SITC CONSTRUCTION OF STONE MASONRY PROTECTION WALL AROUND TRANSMISSION LINE TOWER FOUNDATIONS |
| 231 | Earth work in bulk exacavation by manual means over areas incl. disposal of excavated earth lead up to 50 m and lift up to 1.5 m |
| 232 | Providing & laying in position cement concrete . All work upto plinth level in 1:4:8 aggregate 40mm nominal size (curshed stone) (Mud Mat) |
| 233 | Random Rubble masonary with hard stone from quarry in foundation & plinth( 1 cement : 6 coarse Sand :12 grade stone aggreage 20 mm nominal size ) at plinth level. |
| 234 | Providing & laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement :2 course sand :4 graded stone aggregate 20mm niminal size (crushed) |
| 235 | Earth filling in plinth, sides of foundations etc.in layers not exceeding 20cm in depth consolidating each disposed layer by ramming and watering. |
| 236 | Carriage of materials by Mechnical Transport average lead 20KM |
| 237 | Stone |
| 238 | Aggregates 40mm size |
| 239 | Aggregate 20mm size |
| 240 | Earth |
| 241 | Cement |
| 242 | Carriage of materials by head load from unloading site average lead 1.50 KM |
| 243 | Stone |
| 244 | Aggregates 40mm size |
| 245 | Aggregate 20mm size |
| 246 | Earth |
| 247 | Cement |
| 248 | Survey & check survey including soil investigation, soil classification, profiling tower spotting data, tower type,tower foundation, tower protection wall and etc Please Enable Macros to View BoQ information |