| 1 | TransporationRIG MACHINETransporation of rig machine including loading unloading erecion dismantling & labour in all respect |
| 2 | AIR COMPERSSORTransporation of 600psi compressor including loading unloading erecion dismantling & labour etc complte in all respect |
| 3 | Q.P. UnitTransporation of 3 cusec OP Unit including loading unloading eretcion dismantling & labour etc complte in all respect |
| 4 | TUBEWELL ASSEMBLYTransporation of Tube well assembly including loading unloading erecion dismantling & labour etc complte in all respect |
| 5 | CONSTRUCTION OF TUBE WELL (DRILLING ) AS PER IS 2800(PART I&II) |
| 6 | Drilling of BoreBarricading |
| 7 | Logging Bore |
| 8 | Drilling of 600mm dia bore from G.L. to 65m BGL |
| 9 | Drilling of 500mm dia bore from 65m BGL to 100m |
| 10 | Drilling of 500mm dia bore from 101m BGL to 200m |
| 11 | Drilling of 500mm dia bore from 201m BGL to 300m |
| 12 | Lowering of 300mmdia& 150mm dia tubewellassembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W assembly from G.L. to 380m BGL |
| 13 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60m BGL |
| 14 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm GL to 60m BGLto 100m BGL |
| 15 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm GL to 60m BGLto 200m BGL |
| 16 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1No. 300mm to 150mm dia M.S reducer 16mm thick 1No.s M.S. well cap 12mm thick 100No. M.S. ring 100mm to 12mm thickm M.S. S/1 clamp, T.W. support (1 Section) etc comp. in all respect |
| 17 | 150mm dia MSERW 7.1mm thick plain/slotted pipe including with 60 No M.S. ring 100mm to 12mm thick 1No M.S. ball plug 10 no center guide etc complete in all respect |
| 18 | PEA- GRAVELL (AS PER IS 4097)1.60MM to 4.80mm size pea-gravel of lalkuwan quarry duly screened wahed end proper stacking at |
| 19 | DEVELOPMENT OF TUBEWELLDevelopment of tubewell by 600PSI air compressor |
| 20 | Development of tubewell by 3 cuse O.P. unitCutting of T.W. cover by gas cutter re welding ofT.W. cover by electric welding after complete development of work |
| 21 | Cutting of housing cover by gas cutter |
| 22 | Development of tubewell by 3 cusec O.P. unit |
| 23 | Re-welding of tubewell cover by electric weiding |
| 24 | TESTChemical and bacteriological test |
| 25 | Estimater of pumping plant 1000LPM rebore T/WPUMP SET1000LPM 50m head 2900 pm 20H.P. submersible clear water pumping plant suitable to operate on 415+%5 volt 50HZ 3Phase A.C. supply ( as per IS 8034-1989) |
| 26 | MAIN PIPING AND VALVES100MM DIA 5.4 thick M.S. column pipe with both end flanged and groove for passing submersible cable in each length in 3.0m long 30m with 1m long top pipe with cap (Dumdum) and sealing ringM.S. distance piece of 100mm dia 1.000m long 2 No. and 1.5 long 1no |
| 27 | Supply & cabling of suitable size submersible cable for new tubewell construction of foundation & power connection etc all complete |
| 28 | Excavation and supply & fixing laying jointing 150mm dia Cl pipe K9 Tee, band reducer, Tell pice, Distance pice and D jointing with all materials etc complete. |
| 29 | Excavation & refilling by earth and disposal of malwa and arrangement of water and bentonight powder for drilling of bore |
| 30 | Ward Narayanpur me vinod vishwakarama ke ghar ke pass complete pump house ka nirman karya. Please Enable Macros to View BoQ information |