| 1 | Excavation in trenches not exceeding 1.5m wide and not exceeding 10 Sq.m on plan area and not exceeding 1.5m deep and getting out in any type of soil, for laying of DI/GI / CI Pipes etc., complete all as specified. |
| 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick of excavated soil, as in any type soil, complete all as specified. Note: A deduction of 10% shall be made from total computed volume of filling to cater in bulk irrespective of machinery used for ramming. |
| 3 | Removal of excavated material [Soil] to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point, complete all as specified. |
| 4 | Supply, laying, testing and commissioning of Galvanised steel water tubing 100mm bore, medium grade conforming to IS:1239 (Part I) including all fittings (such as bends, tees, short pieces connectors, elbows, reducers, unions, sockets etc), laid in trenches/drains, including testing, with and including taking down old u/s GI pipe with fittings, complete all as specified and as directed. Note: Necessary earth work will be measured and paid separately. |
| 5 | All as per Serial Item No.4 here-in-before but for 80mm bore dia GI pipe, complete all as specified. |
| 6 | All as per Serial Item No.4 here-in-before but for 50mm bore dia GI pipe, complete all as specified. |
| 7 | All as per Serial Item No.4 here-in-before but for 25mm bore dia GI pipe, complete all as specified. |
| 8 | Supply, laying, testing and commissioning of Ductile Iron pressure pipe of 100mm bore dia, Class K-9, PN-10 rating, with socket & spigot ends with blast furnace sludge cement with Portland cement properties with and including rubber gaskets used with push-on-jointing confirming to IS 5382, with and including cement mortor lining inside with internal metallic zinc coating and external black bitumen coating, duly ISI marked, confirming to IS-8329:2000, class K-9, PN-10 rating, laid in trenches / floor, with and including taking down old u/s CI pipe with fittings, complete all as specified and as directed. Note: 1. Necessary earth work will be measured and paid separately. 2. Necessary fittings will be measured and paid separately. |
| 9 | All as per Serial Item No.8 here-in-before but for 150mm bore dia DI pipe, complete all as specified. |
| 10 | All as per Serial Item No.8 here-in-before but for 200mm bore dia DI pipe, complete all as specified. Please Enable Macros to View BoQ information |
| 11 | All as per Serial Item No.8 here-in-before but for 200mm bore dia DI pipe, complete all as specified. Please Enable Macros to View BoQ information |