|
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer Electric Division -II JPDCL Jammu Name of Work: Supply, installation, damage assesment and Repair/Reclamation of Damaged Distribution Transformers on Turnkey Basis under SASCI under the jurisdiction of Executive Engineer ED-II JPDCL, Jammu. Contract No: E-Nit No. 15 of 2026-27 Dated 30-04-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) The exact no of distribution transformers damaged will depend upon the environmental conditions and may range from 1500 to 2000 DTs during the period. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Supply of Aluminum / Copper winding Wires / Strips of sizes required for Reclamation / Repair/ Re-build of Damaged Distribution Transformers of various capacities ranging from 25KVA to 630 KVA. (The rates to be quoted should be along with the return cost of Scrap as the scrap rightback along with clearing of scrap should be in the scope of the bidder) |
| 4 | S.E Copper Wire of all sizes |
| 5 | DPC Copper Wire of all sizes. |
| 6 | DPC Copper Strip of Sizes |
| 7 | S.E Aluminum Wire of all sizes. |
| 8 | DPC Aluminium Wire All Sizes |
| 9 | DPC Aluminium Strip of Sizes |
| 10 | SE copper winding wire (round) in sizes 11 to 22 SWG.( In exchange of one Kg of scrap including insulation coverage ie salvaged conductor) |
| 11 | DPC Copper winding wire (round) in sizes 11 to 22 SWG.(In exchange of one Kg of scrap including insulation coverage ie salvaged conductor ) |
| 12 | DPC copper strip of sizes for LV winding of distribution transformers 250 KVA to 630 KVA .( In exchange of one Kg of scrap including insulation coverage ie salvaged conductor ) |
| 13 | SE. Aluminum winding wire (round) in sizes 12 to 21 SWG.(In exchange of one Kg of scrap including insulation coverage ie salvaged conductor) |
| 14 | DPC Aluminum winding wire (round) in sizes from 12 to 21 SWG.( In exchange of one Kg of scrap including insulation coverage ie salvaged conductor) |
| 15 | DPC Aluminum strip of sizes for LV winding of Dist. Transformers 25 KVA to 300 KVA.( In exchange of one Kg of scrap including insulation coverage ie salvaged conductor) |
| 16 | Supply of allied material and T&P items required for Reclamation / Repair/ Re-build of Damaged Distribution Transformers of various capacities ranging from 25KVA to 630 KVA and Power Transformers |
| 17 | LT Bush Rods (M-12) |
| 18 | LT Bush Rods (M-20) |
| 19 | LT Bush Rods (M-30) L.V. Bush Rods M-30/M-40 |
| 20 | L.V. Bush Rods M-12/M-20 (33 KV) |
| 21 | HT Bush Rods (11 Kv) |
| 22 | H.V. Bush Rods 20mm (33 KV) |
| 23 | LV. Brass Bush rods 12 mm.(In exchange of burnt / damaged one) |
| 24 | LV. Brass Bush rods 20.mm(In exchange of burnt / damaged one) |
| 25 | LV. Brass Bush rods 30/40.mm (In exchange of burnt / damaged one) |
| 26 | LV. Brass Bush rods 12/20mm (33KV) (In exchange of burnt / damaged one) |
| 27 | HV. Brass Bush rods (11 KV) (In exchange of burnt / damaged one) |
| 28 | HV. Brass Bush rods 20 mm (33KV) (In exchange of burnt / damaged one) |
| 29 | LV Bushings (12mm) |
| 30 | LV Bushings (20mm) |
| 31 | LV Bushings (32/30 mm) L.V. Bush Insulators M-30/M-40 |
| 32 | L.V. Bush Insulators (33 KV) |
| 33 | HT Bushing (11 Kv) |
| 34 | HT Bushing (33 Kv) |
| 35 | Film Paper |
| 36 | Lethoride Paper/Khakhi Paper |
| 37 | Press Boards |
| 38 | Gutties |
| 39 | Rubber Washer of Sizes |
| 40 | LT/HT Washers |
| 41 | LT Washers M-12 |
| 42 | LT Washers M-20 |
| 43 | LT Washers M-30/M-40 |
| 44 | Cork Sheets (1000mmx500mmx5mm) |
| 45 | Rubberized Cork strip(40mmx5mm) |
| 46 | Bakelite Tubes |
| 47 | Cotton Tape |
| 48 | Bovin Tape |
| 49 | M.Seal |
| 50 | Fevicol |
| 51 | Glass Sleeves |
| 52 | Nawar Tape |
| 53 | Insulation Gum |
| 54 | Wooden Wedges |
| 55 | Craft Paper |
| 56 | Packing Sheets |
| 57 | Aluminum Gutka |
| 58 | Nuts & Bolts |
| 59 | H.T. Bush Clamps |
| 60 | Copper Brazing Rod |
| 61 | Aluminum Brazing Rod |
| 62 | H.T / L.T Oil Seals-12 |
| 63 | H.T / L.T Oil Seals-20 |
| 64 | H.T / L.T Oil Seals-30/40 |
| 65 | Cotton Waste (Old Cotton Sarres/Cloth) |
| 66 | M.S Washers for L.T Connections |
| 67 | Plugs of different sizes ¾” 1¼” 1” ½” |
| 68 | Grey Paint |
| 69 | Turpentine oil |
| 70 | Varnish |
| 71 | Welding Rods (8mm & 10mm) |
| 72 | Oven Heating/Elements Coils |
| 73 | 3½ Multi Stands Cu Cable (10 mm ) |
| 74 | Thinner |
| 75 | Crepe Tape |
| 76 | Oxygen Cylinder (Refill) |
| 77 | Meggar (5000Volt, 5000 M Ohms) |
| 78 | Oxygen Regulator |
| 79 | Oxygen Cylinder No.zzle |
| 80 | Oxygen Pipe for Gas Cutter |
| 81 | Clamp for Oxygen Pipe |
| 82 | C Clamp 18” |
| 83 | Hydraulic Transformer Lifting Trolley |
| 84 | Trolley for Scrap Loading/Unloading |
| 85 | Clamp Meter |
| 86 | Welding Helmet |
| 87 | Welding Cable with Holder |
| 88 | Cutter Pliers |
| 89 | Screw Driver (all sorts) |
| 90 | Ratchet Wrench with Socket Set compete |
| 91 | Pipe Wrench 12” |
| 92 | Pipe Wrench 18” |
| 93 | Bolt Cutter 12” |
| 94 | Bolt Cutter 18” |
| 95 | Spanner 15/21 MM |
| 96 | Spanner 38/48 MM |
| 97 | Oven Thermostat (0-300 Amp) |
| 98 | Oven Heaters |
| 99 | Contractor 63 Amp L&T Make |
| 100 | Cable Wire 16 mm. |
| 101 | Filter Plant High Pressure supply Hose 25 MM (1”), 35 bar/500 PSI |
| 102 | Filter Tank Pipe Rubber |
| 103 | Wooden Frames for Winding of HT /LT |
| 104 | Exhaust Fans for Workshop 18”/24”Heavy Duties |
| 105 | Pedestal Fans for Workshop (600mm) |
| 106 | Out Side Clipper for Winding Machines |
| 107 | In Side Clipper for Winding Machines |
| 108 | Heavy Duty Drill Machine (1050 Watt) |
| 109 | Scissors (large size for cutting papers) |
| 110 | Test Cell of oil Testing Machine (60KV) (500 ML/ Acrylic Test Cell) with removable & adjustable electrodes |
| 111 | HT/LT Winding Machines Bearing |
| 112 | HT/LT Winding Machines Bearing VEE-Belts |
| 113 | HT/LT Winding Machines Bearing Gear-Box |
| 114 | HT/LT Winding Machines Bearing Foot-Switch |
| 115 | HT/LT Winding Machines Bearing Counters |
| 116 | 1 HP Pump Motor Centrifugal |
| 117 | Change Over Switch 400 Amp |
| 118 | MCCB 4 Pole 100 Amp. |
| 119 | Scale Steel 1 meter |
| 120 | Scale Steel 12 Inch |
| 121 | EOT Crane Switch |
| 122 | Angle Grinder (850 Watts) |
| 123 | Air Blower Macine (900 Watts) |
| 124 | Digital Micrometer 0 to 25 mm |
| 125 | LPG 19 Kg (Refill) |
| 126 | Laminated Core of Al Sorts |
| 127 | Multi Stand 3 Core Copper Cable 10 sqmm |
| 128 | Testing Clips |
| 129 | Saw Dust |
| 130 | Dust Sand |
| 131 | Led Light 150 watt |
| 132 | Led Light 200 watt |
| 133 | Steel Sand Buckets |
| 134 | Fire Extinguisher Mechanical foam 50 ltr |
| 135 | Fire Extinguisher (refill) 50 ltr |
| 136 | Oven Blower 1450 rpm |
| 137 | Twin Core 16 sqmm Cable (Copper) |
| 138 | Twin Core 16 sqmm Cable (Aluminium) |
| 139 | Labour rates for Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) of different capacities viz 25 KVA, 50/63 KVA, 100 KVA, 200/250 KVA, 300 KVA, 400 KVA, 500 KVA, 630 KVA |
| 140 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 25 KVA DTR |
| 141 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 142 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 143 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 144 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 145 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 146 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 147 | Impregnation and heat treatment of coils |
| 148 | Winding of HV Leg Coil (Copper/Aluminium). |
| 149 | Winding of LV Leg Coil (Copper/Aluminium). |
| 150 | Rewinding of LV leg (Copper/Aluminium). |
| 151 | Labour charges for filtration of transformer oil |
| 152 | Refitting/ Replacement of Bushing only HV/LV |
| 153 | Refitting/ Replacement of Bush rod only HV/LV |
| 154 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 155 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 50/63KVA DTR |
| 156 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 157 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 158 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 159 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 160 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 161 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 162 | Impregnation and heat treatment of coils |
| 163 | Winding of HV Leg Coil (Copper/Aluminium). |
| 164 | Winding of LV Leg Coil (Copper/Aluminium). |
| 165 | Rewinding of LV leg (Copper/Aluminium). |
| 166 | Labour charges for filtration of transformer oil |
| 167 | Refitting/ Replacement of Bushing only HV/LV |
| 168 | Refitting/ Replacement of Bush rod only HV/LV |
| 169 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 170 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 100KVA DTR |
| 171 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 172 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 173 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 174 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 175 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 176 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 177 | Impregnation and heat treatment of coils |
| 178 | Winding of HV Leg Coil (Copper/Aluminium). |
| 179 | Winding of LV Leg Coil (Copper/Aluminium). |
| 180 | Rewinding of LV leg (Copper/Aluminium). |
| 181 | Labour charges for filtration of transformer oil |
| 182 | Refitting/ Replacement of Bushing only HV/LV |
| 183 | Refitting/ Replacement of Bush rod only HV/LV |
| 184 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 185 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 200/250 KVA DTR |
| 186 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 187 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 188 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 189 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 190 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 191 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 192 | Impregnation and heat treatment of coils |
| 193 | Winding of HV Leg Coil (Copper/Aluminium). |
| 194 | Winding of LV Leg Coil (Copper/Aluminium). |
| 195 | Rewinding of LV leg (Copper/Aluminium). |
| 196 | Labour charges for filtration of transformer oil |
| 197 | Refitting/ Replacement of Bushing only HV/LV |
| 198 | Refitting/ Replacement of Bush rod only HV/LV |
| 199 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 200 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 300KVA DTR |
| 201 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 202 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 203 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 204 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 205 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 206 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 207 | Impregnation and heat treatment of coils |
| 208 | Winding of HV Leg Coil (Copper/Aluminium). |
| 209 | Winding of LV Leg Coil (Copper/Aluminium). |
| 210 | Rewinding of LV leg (Copper/Aluminium). |
| 211 | Labour charges for filtration of transformer oil |
| 212 | Refitting/ Replacement of Bushing only HV/LV |
| 213 | Refitting/ Replacement of Bush rod only HV/LV |
| 214 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 215 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 400KVA DTR |
| 216 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 217 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 218 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 219 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 220 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 221 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 222 | Impregnation and heat treatment of coils |
| 223 | Winding of HV Leg Coil (Copper/Aluminium). |
| 224 | Winding of LV Leg Coil (Copper/Aluminium). |
| 225 | Rewinding of LV leg (Copper/Aluminium). |
| 226 | Labour charges for filtration of transformer oil |
| 227 | Refitting/ Replacement of Bushing only HV/LV |
| 228 | Refitting/ Replacement of Bush rod only HV/LV |
| 229 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 230 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 500KVA DTR |
| 231 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 232 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 233 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 234 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 235 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 236 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 237 | Impregnation and heat treatment of coils |
| 238 | Winding of HV Leg Coil (Copper/Aluminium). |
| 239 | Winding of LV Leg Coil (Copper/Aluminium). |
| 240 | Rewinding of LV leg (Copper/Aluminium). |
| 241 | Labour charges for filtration of transformer oil |
| 242 | Refitting/ Replacement of Bushing only HV/LV |
| 243 | Refitting/ Replacement of Bush rod only HV/LV |
| 244 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 245 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 630KVA DTR |
| 246 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 247 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) |
| 248 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) |
| 249 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 250 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any |
| 251 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 252 | Impregnation and heat treatment of coils |
| 253 | Winding of HV Leg Coil (Copper/Aluminium). |
| 254 | Winding of LV Leg Coil (Copper/Aluminium). |
| 255 | Rewinding of LV leg (Copper/Aluminium). |
| 256 | Labour charges for filtration of transformer oil |
| 257 | Refitting/ Replacement of Bushing only HV/LV |
| 258 | Refitting/ Replacement of Bush rod only HV/LV |
| 259 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 260 | Hiring of Pick up Vans like Tata Mobile or Mahindra etc on per job basis for carriage of Distribution transformers ranging from 25KVA to 630KVA from Divisional Workshop/Stores at Miran Sahib to various locations falling under the Jurisdiction of Electric Div-II JPDCL Gandhi Nagar Jammu during the Financial Year 2026-27. |
| 261 | Carriage along with fuel (on per job basis) of Repaired Distribution Transformers ranging from 25 KVA to 630 KVA from Workshop to Site of replacement & recarrige of damaged Distribution Transformer from site to Workshop (Complete Job) with in Jurisdiction of SubDivision I & II Comprising of Areas of Jammu South viz Gandhi Nagar Channi Himmat Sainik Colony, Chowadhi, Bhatindi,SahstriNagar Trikuta Nagar Belicharana, Satwari, Gangyal ,Chatha,Kunjwani BariBrahmana Greater Kailash & their adjioining areas. |
| 262 | Carriage (on per job basis) of Repaired Distribution Transformers ranging from 25 KVA to 630 KVA from Workshop to Site of replacement & recarrige of damaged Distribution Transformer from site to Workshop( Complete Job ) with in Jurisdiction of SubDivision III & SubDivision IV i.e R S Pura, MiranSahib, Suchetgarh , Sohanjana, Makwal Bishnah, Arnia, Treva, Nandpur,Sarore and their adjoining areas. |
| 263 | Replacement of damaged distribution transformers by means of Mechanical Mobile Crane with in the jurisdiction of Electric Division II JPDCL GandhiNagar Jammu during the financial year 2026-27. |
| 264 | Replacement of damaged Distribution transformers from 25KVA to 630KVA with in the jurisdiction of Electric Sub Division -I Green Belt & Sub Division-II Gangyal comprising of areas of GandhiNagar, Nanak Nagar, Channi Himmat, Trikuta nagar, Sainik Colony , Chowadi,Bhatindi, BeliCharan ,Sainik Colony ,Gangyal, Greater Kailsah , Kunjwani, Chatha , Baribrahmna and their adjoining areas. Ranging from 25 KVA to 630 KVA. |
| 265 | Replacement of damaged/repaired Distribution transformers from 25KVA to 630KVA with in the jurisdiction of Electric Sub Division -III R S Pura and Electric Sub Division -IV Bishnah comprising of areas of Bishnah, Arnia, treva, Nandpur, Sarore , R S Pura, MiranSahib, Makwal ,Suchetgarh Phallian Mandal , Shohanjan & their adjoining areas. Ranging from 25 KVA to 630 KVA. Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |