|
| 1 | Providing & laying spreading and compacting stone aggregates of specifice size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 Kn static roller in stages to proper grade and camber appling and brooming crushable screening to fill-up the interstice of coarse aggregate watering and compacting to the required density Grading 2 as per Technical specification Clause 405 Mord Book Page No. 4-18 |
| 2 | Providing & laying spreading and compacting stone aggregates of specifice size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 Kn static roller in stages to proper grade and camber appling and brooming crushable screening to fill-up the interstice of coarse aggregate watering and compacting to the required density Grading 3 as per Technical specification Clause 405 Mord Book Page No. 4-18 |
| 3 | Excavation in foundation in ordinary soil I/C lift upto 1.50 M & lead upto 30 M I/C filling, watering & ramming of excavated earth into the tranches or into the plinth and removal of surplus earth as directed by engineer in charge.S.I. no.251 |
| 4 | Concrete with 4 cm.(1/1/2\\")Gauge brick ballast fine sand of 1.25 FM and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.273 |
| 5 | First class Brick work in 1:4 cement and coarse sand mortar in Foundation & Plinth including supply of all materials, Labour and T&P etc. required for proper completion of the work.S.I. no.305 |
| 6 | Cement concrete with 2 cm gauge grit approved stone ballast, approved coarsesand and cement in the proportion of 4:2:1 including supply of all materials, Labour and T&P etc. required for proper completion of the work.(S.I. No. 279i) |
| 7 | 12 mm thick plaster with cement and approved coarse sand in 1:4 including supply of all materials, labour and T&P etc. required for proper complection of the work (S.I. No. 584 i) +Diff. |
| 8 | P/L of factory made 80 mm thick interlocking cement concrete tiles(30mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding/laying of interlocking tiles leveling and dressing of surface to requried level and slope filling joints with fine sand supply and all material labour T&P etc. all complete.(New Item-1) |
| 9 | Providing and fixing of Recto reflective steel sign board as per drawing design including writing of details as specified by Engineer in charge. including supply of all materials, labour T&P, cartage upto site complete in all respect required for proper completion of the work and as per direction of E/I. |
| 10 | Part-B Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total Interlocking work amount of Maintainance of first Year @ 0.00% of Total Work Amount of Interlocking Area |
| 11 | Maintainance of Second Year @ 0.25% of Total Work Amount of Interlocking Area |
| 12 | Maintainance of Third Year @ 0.50% of Total Work Amount of Interlocking Area |
| 13 | Maintainance of Fourth Year @ 0.75% of Total Work Amount of Interlocking Area |
| 14 | Maintainance of FifthYear @ 1.00% of Total Work Amount of Interlocking Area Please Enable Macros to View BoQ information |