| 1 | Excavation in Foundation in Ordinary soil for structure i/c all lead & reqd. lifts as per site requirement and with proper disposel of excavated earth as per directed by engineer in charge for proper completion of work |
| 2 | Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 3 | Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work |
| 4 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work |
| 5 | Ordinary Centering Of Line Plywood Or Steel Shuttering for C.C. work complete for proper completion of work |
| 6 | Ordinary Centering Of Line Plywood Or Steel Shuttering for R.C.C. work complete for proper completion of work |
| 7 | Reinforced cement concrete (1:1.5:3) mix with Cement Coarse Sand (F.M. Not less than 2.00), stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 8 | Cement Concrete in (1:1:2) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 9 | S/L of Two coat Tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work |
| 10 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work |
| 11 | Cutting, Bending, Binding & Placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work |
| 12 | Supply and laying of Ordinary Sand till GL for easily abd early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work. |
| 13 | Supply and Fixing 75mm Dia PVC Pipe for drainage sqouts. Including cost of all material T&P, labours etc for proper completion of work as per directed by engineer in charge. |
| 14 | Providing and Fixing of year Plate for proper completion of work |
| 15 | Providing and fixing of B.M Plate for proper completion of work |
| 16 | Supply and Fixing wheel Guard stone (Size 150mmx150mmx900mm) for proper completion of work |
| 17 | Earth work in Filling in Layers including cariage of earth from a distance of 600 mt. & all lifts i/c ramming dressing & all labour T&P etc. |
| 18 | Finishing Wall with one coat of water proof cement paint weather coat of quality on previously new surface with this paint to give an even shade including supply of all mareials, labour,Tools, & plant etc. required for proper completion of work |
| 19 | M-100 Brick on Edge Soling with staright over burnt brick i/c Joints filleds with Local Earth and Preparation of sub grade to prescribe camber including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge. Please Enable Macros to View BoQ information |