| 1 | Annual maintenance |
| 2 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. |
| 3 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 4 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 5 | OD12764/2025-2026:Removing earthen bund using suitable mechanical means including depositing the soil including cost and conveyance, labour charges etc complete as per the instructions of departmental officers at site |
| 6 | OD33091/2025-2026:Fixing in position Anjily wood shutter planks including conveyance using boat or floating mechanism or an other suitable means and all labour charges including cleaning of shutter groove, removal of attached marine animals such as clamshells etc complete. |
| 7 | OD12766/2025-2026:Filling with hard stiff clay cut and conveying from suitable place including all leads and lifts, consoldating each layer of 20cm by ramming and watering and incliding all labour charges etc. compleate as per the direction of departmental officers at site |
| 8 | OD12767/2025-2026:Removing wooden posts from sluice and conveying the same to convenient place etc. Complete. |
| 9 | OD12768/2025-2026:Removing the automatic shutters from sluice and conveying the same to convenient place etc. complete as per direction of the departmental officers at site |
| 10 | OD12769/2025-2026:Conveying and fixing the wooden posts for the sluice in correct position including all charges etc complete as per the direction of departmental officers at site. |
| 11 | OD12770/2025-2026:Handling, conveying and fixing automatic shutter of sluice in position including all charges for conveying from bund and fixing the sluice in position. etc complete as per the direction of departmental officers at site. |
| 12 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge |
| 13 | OD33721/2025-2026:Shutter for check dams- Supplying and providing good quality Anjily wood-made shutter planks and frames including cost of materials and labour charges for cutting, carpentry works etc complete |
| 14 | OD33947/2025-2026:Engaging labour for removal and refixing of shutters in position including all labour charges etc complete Please Enable Macros to View BoQ information |