|
| 1 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 3 | Cement concrete (M-15) with 40mm size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 4 | RCC (M-20) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 5 | Rigid smooth centering & shuttering for CC/RCC works (Cut off and Raft) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. |
| 6 | Rigid smooth centering & shuttering for CC/RCC works (Walls & Fins) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. |
| 7 | Filling foundation & plinth with the excavated materials including watering & ramming with all leads, lifts and delifts etc. complete as per direction of the Engineer-in-charge. |
| 8 | Providing weep holes in reinforced cement concrete abutment with 100mm dia A.C. pipe extending through the full width of structure including cost, carriage and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 9 | Providing & stacking at work site moorum & Sand for sub-base including cost, carriage, royalty with labour charges for conveying from stacks and admixing the moorum & Sand with proportion (60:40) respectively & spreading the same on road surface including hire & running charges of PRR & materials required for the work, watering and compacting to the required density as per direction of Engineer-in-charge. |
| 10 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated materials clear of worksite with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, hire and running charges of all machineries, labour welfare cess etc. complete in all respect as per specification and direction of the Engineer-in-Charge. |
| 11 | Earth work in all kinds of soil excluding sand or sandy soil with mechanical carriage 5 k.m lead including rough dressing and benching old embankment and breaking clods 5cm to7 cm laying in layers not exceeding 0.30m depth. As per direction of Engineer-in -charges.( Royality shall be deduct from earth filling section )(Measurement to be taken on the finished compacted section & Earth shall be arranged by the contractor at his own cost & risk ) Please Enable Macros to View BoQ information |