| 1 | Dismantling and removing cement concrete including stacking the useful materials for re-use and removing the debris away from the work site as per direction of the Engineer-in-charge. |
| 2 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. |
| 3 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 4 | Cement concrete (M-15) with 40mm size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 5 | CC (M-20) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 6 | Rigid smooth centering & shuttering for CC/RCC works (Walls & Fins) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. |
| 7 | Filling foundation & plinth with the excavated materials including watering & ramming with all leads, lifts and delifts etc. complete as per direction of the Engineer-in-charge. |
| 8 | Supplying, fitting & placing in position uncoated HYSD bar for M.S. reinforcement for RCC work including straightening, cutting, bending, binding and tying the rails and placing in position including cost, carriage & all other taxes of M.S. steel & binding wire 18 to 20 gauge etc. complete as per direction of the Engineer-in-charge. |
| 9 | Providing & stacking at work site moorum & Sand for sub-base including cost, carriage, royalty with labour charges for conveying from stacks and admixing the moorum & Sand with proportion (60:40) respectively & spreading the same on road surface including hire & running charges of PRR & materials required for the work, watering and compacting to the required density as per direction of Engineer-in-charge. |
| 10 | Earth work in all kinds of soil excluding sand or sandy soil with mechanical carriage 5 k.m lead including rough dressing and benching old embankment and breaking clods 5cm to7 cm laying in layers not exceeding 0.30m depth. As per direction of Engineer-in -charges.( Royality shall be deduct from earth filling section )(Measurement to be taken on the finished compacted section & Earth shall be arranged by the contractor at his own cost & risk ) Please Enable Macros to View BoQ information |