| 1 | Design Engineering & Supply of Material for River Crossing TowersSurveying, reconnaissance of terrains, line route, detail survey including check survey, jungle clearance & fixing of stone burjees, Geoglogicval investigations(complete soil testing), load bearing test and earth resistivity recording along the trans. Line and making of tower profile and tower schedule |
| 2 | Tower MaterialSuperstructure for 3 no of D type towers with tower exetension +6 to +9 as per tower schedule |
| 3 | Stubs for 3 no D type towers with tower exetension +6 to +9 as tower schedule |
| 4 | Tower AccessoriesPhase Plates 3 No Per Tower for D/C |
| 5 | Number Plates 1 No Per Tower |
| 6 | Circuit Plates 1 No. Per Tower for D/C |
| 7 | Earthing of Towers |
| 8 | Flexible Copper Bonds per Earth Wire |
| 9 | Nuts & Bolts |
| 10 | Tower Accessories/ Conductor2 ACSR Panther Conductor ,(a) Alumunium=30/3 mm(b) Steel=7/3 mm Overall dia21mm.Approximate Wt 976Kg/Km Ultimate breaking Load=89.67 KN; including 1.5%sag and jumpering & Jumpring for River Crossing |
| 11 | Vibration Dampers 2 No/Phase/Tower |
| 12 | Repair Sleeves For Conductor |
| 13 | Aluminium Tape |
| 14 | Earth wire |
| 15 | Vibration Dampers 2 No / Tower |
| 16 | InsulatorsLong rod polymer insulator 120 kN light |
| 17 | Hardware fittings for conductorDouble Tension Fittings, with Jumpers cones |
| 18 | Erection, testing and commissioning & Stringing of Conductor Tower MaterialSuperstructure for 3 no of D type towers with tower exetension +6 to +9 as per tower schedule |
| 19 | Stubs for 3 no D type towers with tower exetension +6 to +9 as tower schedule |
| 20 | Tower AccessoriesPhase Plates 3 No Per Tower for D/C |
| 21 | Number Plates 1 No Per Tower |
| 22 | Circuit Plates 1 No. Per Tower for D/C |
| 23 | Earthing of Towers |
| 24 | Nuts & Bolts |
| 25 | Misc. itemsTag welding of towers |
| 26 | String of ACSR Panther Conductor 2 ACSR Panther Conductor, (a) Alumunium=30/3 mm(b) Steel=7/3 mm Overall dia21mm. Approximate Wt 976Kg/Km Ultimate breaking Load=89.67 KN; including 1.5%sag and jumpering & Jumpring for River Crossing |
| 27 | Vibration Dampers 2 No/Phase/Tower |
| 28 | Repair Sleeves For Conductor |
| 29 | Aluminium Tape |
| 30 | Strining g of Earth wire |
| 31 | Anti Climbing Divices |
| 32 | Vibration Dampers 2 No / Tower for earth wire |
| 33 | InsulatorsLong rod polymer insulator 120 kN light |
| 34 | Hardware fittings for conductorDouble Tension Fittings 10% |
| 35 | Civil work including material Laying of foundation of D+6/9 type towers as per the approved drawing to be submitted by the contractor and duly vetted by the Division fully submerged allied work along with transportation of material |
| 36 | (CONSTRUCTION OF STONE MASONRY PROTECTION WALL AROUND 33KV TOWER FOUNDATIONS) including excavation, filling, and allied work along with transportation of material |
| 37 | (CONSTRUCTION OF STONE MASONRY PROTECTION WALL AROUND 33KV TOWER FOUNDATIONS) including excavation, filling, and allied work along with transportation of material |
| 38 | (CONSTRUCTION OF STONE MASONRY PROTECTION WALL AROUND 33KV TOWER FOUNDATIONS) including excavation, filling, and allied work along with transportation of material Please Enable Macros to View BoQ information |