| 1 | SITC of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor alongwith allied material at SALADA, FARAL, DHORSI, GOVINDSAR, JAGATPUR, KASORI, TRIDWAN, DHANORE PHE, THEIN, BELLU & SHWAAR in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 2 | 9 Mtr. Long pole (ST-410 SP 33) |
| 3 | GI V cross-arm with top Bracket including clamps |
| 4 | GI Channel x-arm including clamps and braces |
| 5 | 30 mm² ACSR Weasel Conductor |
| 6 | PG Clamps for ACSR weasel conductor |
| 7 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 8 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 9 | Galvanized Nuts and Bolts |
| 10 | Danger Plates with Clamp |
| 11 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 12 | Red oxide Paints |
| 13 | Aluminium Paints |
| 14 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 15 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 16 | SITC of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3-Phase 4-Wire alongwith allied material at KUDIAR, BABA NAAL, TERA, BAGHRA, BHED BHALODE, PANJWARI, KATHERA, KUMRI, JARAI & ADJOINING AREAS, CHARDYAL, SAIT, GURHA PANDITA, JAKHBAR OLD, KHOKHYAL, NAGRI JAKHBAR, CHATHA, LOGATE MORH, DUKHAT, KUTLAID, DHANNA, BARNI, BASANTPUR, PARO PARDHA, GHARTI, DHANORE, MEHTABGARH (BAKARWAL), UPPER MAHA, MAROLI, GAITERWAN, TRIKOT, CHAK GOTA, DILWAN AND DHANORE SC MOHALLA in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 17 | 8Mtr. Long pole (ST-410 SP 15) |
| 18 | GI U-Clamp for Shackle insulators |
| 19 | 16 KN Shackle insulators |
| 20 | 30 mm² ACSR Weasel Conductor |
| 21 | Galvanized Nuts and Bolts |
| 22 | Red oxide Paints |
| 23 | Aluminium Paints |
| 24 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 25 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 26 | Replacement/Insertion of damaged poles in HT line with 11Mtrs ST Poles at KATHUA-I AND LAKHANPUR in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 27 | 11 Mtr. Long pole (ST-410 SP 56) |
| 28 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 29 | Nuts and Bolts |
| 30 | ACSR Weasel Conductor |
| 31 | Replacement/Insertion of damaged poles in HT line with 9Mtrs ST Poles at KUMRI KATHERA, BARWAL, LOGATE SAHAR, JARAI, JUTHANA, JAKHOL BHAKTA, CHAINPURA, BUDHI, NANAN, NAGRI JAKHBAR, LAKHANPUR, MAHA AND JAGATPUR in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 32 | 9 Mtr. Long pole (ST-410 SP 33) |
| 33 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 34 | Nuts and Bolts |
| 35 | ACSR Weasel Conductor |
| 36 | Replacement/Insertion of damaged poles in LT line with 8Mtrs ST Poles at KUMRI KATHERA, JARAI, JUTHANA, JAKHOL BHAKTA, CHAINPURA, BUDHI, NANAN, NAGRI JAKHBAR, JANGLOTE, LAKHANPUR, MAHA AND JAGATPUR in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 37 | 8Mtr. Long pole (ST-410 SP 15) |
| 38 | GI U clamps for Shackle insulstor |
| 39 | Shackle Insulator |
| 40 | Nuts and Bolts |
| 41 | 30mm2 ACSR Weasel Conductor |
| 42 | Creation of 250 KVA Sub Station on PCC poles at GOVINDSAR in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 43 | 250 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2 ( new), IS1180 part -1, 2014 as per latest upto date amendment with externally fitted MCCB with cable box and 4x4 mtrs. Suitable cable of ratings.(Aluminium Wound upto 200 KVA, Copper Wound for 250 KVA or Higher KVA rattings.) |
| 44 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 45 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 46 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 47 | 185 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 48 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 49 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 50 | GI Channel/Angle/Flat of sizes including clamps. |
| 51 | Galvanized Nuts and Bolts. |
| 52 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 53 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 54 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 55 | Wedge connectors /PG clamps |
| 56 | Danger plate with clamps |
| 57 | Anti-Climbing Device with Clamps |
| 58 | Creation of 100KVA Sub Station on PCC poles at CHACK GOTA in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 59 | 100 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2 ( new), IS1180 part -1, 2014 as per latest upto date amendment with externally fitted MCCB with cable box and 4x4 mtrs. Suitable cable of ratings.(Aluminium Wound upto 200 KVA, Copper Wound for 250 KVA or Higher KVA rattings.) |
| 60 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 61 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 62 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 63 | 185 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 64 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 65 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 66 | GI Channel/Angle/Flat of sizes including clamps. |
| 67 | Galvanized Nuts and Bolts. |
| 68 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 69 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 70 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 71 | Wedge connectors /PG clamps |
| 72 | Danger plate with clamps |
| 73 | Anti-Climbing Device with Clamps |
| 74 | Creation of 100KVA Sub Station on PCC poles at BADALA (SC BASTI) in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 75 | 100 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2 ( new), IS1180 part -1, 2014 as per latest upto date amendment with externally fitted MCCB with cable box and 4x4 mtrs. Suitable cable of ratings.(Aluminium Wound upto 200 KVA, Copper Wound for 250 KVA or Higher KVA rattings.) |
| 76 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 77 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 78 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 79 | 185 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 80 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 81 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 82 | GI Channel/Angle/Flat of sizes including clamps. |
| 83 | Galvanized Nuts and Bolts. |
| 84 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 85 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 86 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 87 | Wedge connectors /PG clamps |
| 88 | Danger plate with clamps |
| 89 | Anti-Climbing Device with Clamps |
| 90 | Creation of 63KVA Sub Station on PCC poles at BALODE in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 91 | 63 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2 ( new), IS1180 part -1, 2014 as per latest upto date amendment with externally fitted MCCB with cable box and 4x4 mtrs. Suitable cable of ratings.(Aluminium Wound upto 200 KVA, Copper Wound for 250 KVA or Higher KVA rattings.) |
| 92 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 93 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 94 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 95 | 50 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 96 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 97 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 98 | GI Channel/Angle/Flat of sizes including clamps. |
| 99 | Galvanized Nuts and Bolts. |
| 100 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 101 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 102 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 103 | Wedge connectors /PG clamps |
| 104 | Danger plate with clamps |
| 105 | Anti-Climbing Device with Clamps |
| 106 | Creation of 25KVA Sub Station on PCC poles at MALOOH in respect of Electric Sub Division Kathua of JPDCL Electric Division Kathua |
| 107 | 25 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2( new), IS1180 part -1, 2014 as per latest upto date amendment |
| 108 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 109 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 110 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 111 | 25 mm² Single core cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type. |
| 112 | 9 Mtr. Long pole (PCC WL 300 KG) |
| 113 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 114 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap |
| 115 | Galvanized Nuts and Bolts. |
| 116 | 32/63 Amps TPN switch Disconnector fuse unit |
| 117 | Cement bottoming 1:2:4 mix as per REC standerds .5 Cum/pole |
| 118 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 119 | Danger plate with clamps |
| 120 | Anti-Climbing Device with Clamps |
| 121 | LT Distribution Box for 16 KV DTR with MCCB for incommer and SFU's for out going Circuits Please Enable Macros to View BoQ information |