| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer, Electric Central Workshop Division, JPDCL, Jammu Name of Work: Fixing the Job Contract (Labour) for Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) of different capacities viz 25 KVA, 50/63 KVA, 100/160 KVA, 200/250 KVA, 300/400 KVA, 500/630 KVA and 800KVA at Electric Central Workshop Division, JPDCL, Jammu Contract No: e-Nit No ECWD/Repair of DTs/06 of 2026 Dated: 30-04-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 25 KVA DTR |
| 4 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 5 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 6 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 7 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 8 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 9 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 10 | Impregnation and heat treatment of coils. |
| 11 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 12 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 13 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 14 | Shifting/Draging of repaired DT to testing site. |
| 15 | Winding of HV Leg Coil (Copper/Aluminium). |
| 16 | Winding of LV Leg Coil (Copper/Aluminium). |
| 17 | Rewinding of LV leg (Copper/Aluminium). |
| 18 | Refitting/ Replacement of Bushing only HV/LV. |
| 19 | Refitting/ Replacement of Bush rod only HV/LV . |
| 20 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 21 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 50/63KVA DTR |
| 22 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 23 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 24 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 25 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 26 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 27 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 28 | Impregnation and heat treatment of coils. |
| 29 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 30 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 31 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 32 | Shifting/Draging of repaired DT to testing site. |
| 33 | Winding of HV Leg Coil (Copper/Aluminium). |
| 34 | Winding of LV Leg Coil (Copper/Aluminium). |
| 35 | Rewinding of LV leg (Copper/Aluminium). |
| 36 | Refitting/ Replacement of Bushing only HV/LV. |
| 37 | Refitting/ Replacement of Bush rod only HV/LV . |
| 38 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 39 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 100KVA DTR |
| 40 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 41 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 42 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 43 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 44 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 45 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 46 | Impregnation and heat treatment of coils. |
| 47 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 48 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 49 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 50 | Shifting/Draging of repaired DT to testing site. |
| 51 | Winding of HV Leg Coil (Copper/Aluminium). |
| 52 | Winding of LV Leg Coil (Copper/Aluminium). |
| 53 | Rewinding of LV leg (Copper/Aluminium). |
| 54 | Refitting/ Replacement of Bushing only HV/LV. |
| 55 | Refitting/ Replacement of Bush rod only HV/LV. |
| 56 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 57 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 200/250 KVA DTR |
| 58 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 59 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 60 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 61 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 62 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 63 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 64 | Impregnation and heat treatment of coils. |
| 65 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 66 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 67 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 68 | Shifting/Draging of repaired DT to testing site. |
| 69 | Winding of HV Leg Coil (Copper/Aluminium). |
| 70 | Winding of LV Leg Coil (Copper/Aluminium). |
| 71 | Rewinding of LV leg (Copper/Aluminium). |
| 72 | Refitting/ Replacement of Bushing only HV/LV. |
| 73 | Refitting/ Replacement of Bush rod only HV/LV. |
| 74 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 75 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 300/400KVA DTR |
| 76 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 77 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 78 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 79 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 80 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 81 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 82 | Impregnation and heat treatment of coils. |
| 83 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 84 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 85 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 86 | Shifting/Draging of repaired DT to testing site. |
| 87 | Winding of HV Leg Coil (Copper/Aluminium). |
| 88 | Winding of LV Leg Coil (Copper/Aluminium). |
| 89 | Rewinding of LV leg (Copper/Aluminium). |
| 90 | Refitting/ Replacement of Bushing only HV/LV. |
| 91 | Refitting/ Replacement of Bush rod only HV/LV. |
| 92 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 93 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 500/630KVA DTR |
| 94 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 95 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 96 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 97 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 98 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 99 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 100 | Impregnation and heat treatment of coils. |
| 101 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 102 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 103 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 104 | Shifting/Draging of repaired DT to testing site. |
| 105 | Winding of HV Leg Coil (Copper/Aluminium). |
| 106 | Winding of LV Leg Coil (Copper/Aluminium). |
| 107 | Rewinding of LV leg (Copper/Aluminium). |
| 108 | Refitting/ Replacement of Bushing only HV/LV. |
| 109 | Refitting/ Replacement of Bush rod only HV/LV. |
| 110 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 111 | Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 800KVA DTR |
| 112 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. |
| 113 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs). |
| 114 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs). |
| 115 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. |
| 116 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any. |
| 117 | Labour Charges for painting of Transformer tank, radiators (Complete Job). |
| 118 | Impregnation and heat treatment of coils. |
| 119 | Shifting/Draging of damaged DTs with in the workshop for repair. |
| 120 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank. |
| 121 | Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting. |
| 122 | Shifting/Draging of repaired DT to testing site. |
| 123 | Winding of HV Leg Coil (Copper/Aluminium). |
| 124 | Winding of LV Leg Coil (Copper/Aluminium). |
| 125 | Rewinding of LV leg (Copper/Aluminium). |
| 126 | Refitting/ Replacement of Bushing only HV/LV. |
| 127 | Refitting/ Replacement of Bush rod only HV/LV. |
| 128 | Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer. |
| 129 | Labour charges for filtration of transformer oil. |
| 130 | Testing of Repaired Transformer |
| 131 | High Voltage Test (28 KV for 60 Sec) HV Side. |
| 132 | High Voltage Test (3 KV for 60 Sec) LV Side. |
| 133 | Open Circuit Test. |
| 134 | Short Circuit Tes. |
| 135 | And Other Relevant Tests. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |