| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator)/mannual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m |
| 2 | All kinds of soil. |
| 3 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | 1:5:10 (1 cement : 5 fine sand(zone-III) : 10 graded stone aggregate 40 mm nominal size) |
| 6 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 8 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : |
| 10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 12 | Foundations, footings, walls, bases of columns, etc. for mass concrete. |
| 13 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. |
| 14 | Cold twisted/TMT bars |
| 15 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. |
| 16 | Cement mortar 1:4 (1 cement :4 coarse sand) |
| 17 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 18 | Hot finished welded type tubes |
| 19 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 20 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 21 | 12 mm cement plaster of mix : |
| 22 | 1:6 (1 cement: 6 fine sand) |
| 23 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 24 | Two or more coats on new work. |
| 25 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. |
| 26 | Made of G.I. wire of dia 4 mm |
| 27 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: |
| 28 | 1:3:6 or richer mix (i/c equivalent design mix) Please Enable Macros to View BoQ information |