|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr. All kinds of soil61 |
| 2 | P/F of dry stone soling hand packed incld. carriage |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete of grade M 20 excld. The cost of centering, shuttering, finishing and reinforcement. All works above plinth level in 1:1.5:3 mix . Using crushed aggregates |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in Superstructure upto floor V level including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 7 | 12 mm thick cement sand plaster in 1:6 mix |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs andsteps etc. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foudations, footings, basis of columns. |
| 10 | Structural steel work in single section, fixed with or without connectingplate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 11 | Painting with silicon and acrylic emulsion based water thinnable sealer ofapproved brand and manufacture on wet or patchy portion of plastered surfaces: |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level:Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 13 | Carriage for different Materials involved |
| 14 | Stone Aggregates below 40 mm for an average lead of 20 kms |
| 15 | Sand for an average lead of 35 kms |
| 16 | Bricks for an average lead of 12 kms Please Enable Macros to View BoQ information |